Quick Take
Quick Take: Two appliances, one chassis size, and a sizing question that decides which: PA-1410 and PA-1420 differ mainly in threat throughput, session table, and SFP+ port count. This page collects the PAN-OS 12.1 figures, PoE budget, and subscription lines a branch NGFW quote needs.
Performance Table
Quick Answer: Size on Threat Prevention and IPsec rather than firewall-only throughput. PA-1410 rates 4.5 Gbps Threat Prevention, 4.1 Gbps IPsec, and 945,000 concurrent sessions; PA-1420 lifts those to 6.2 Gbps, 5.6 Gbps, and 1.4 million sessions. Both are PAN-OS 12.1 appmix figures, so confirm the software train being quoted.
Figures follow the vendor PA-1400 Series datasheet measured on PAN-OS 12.1. Confirm against your software train and subscription bundle. Related: PA-400, PA-3400, PA-5400, Palo Alto vs Fortinet, SKU Lookup. Request a quote.
| Metric (PAN-OS 12.1 datasheet, up to) | PA-1410 | PA-1420 |
|---|---|---|
| Firewall throughput (appmix) | 8.5 Gbps | 9.5 Gbps |
| Threat Prevention (appmix) | 4.5 Gbps | 6.2 Gbps |
| IPsec VPN | 4.1 Gbps | 5.6 Gbps |
| Max concurrent sessions | 945,000 | 1.4M |
| New sessions/sec | 100,000 | 140,000 |
| Virtual systems (base/max) | 1 / 6 | 1 / 6 |
Threat Prevention figures include App-ID, IPS, AV, antispyware, WildFire, DNS Security, file blocking, and logging (appmix).
Overview
Quick Answer: The PA-1400 pair — PA-1410 and PA-1420 — brings the full PAN-OS ML-Powered NGFW stack to branch and midsize sites: App-ID, Advanced Threat Prevention, WildFire, DNS Security, and optional Advanced SD-WAN on one 1U chassis with PoE, managed centrally through Panorama or Strata Cloud Manager.
Hardware & I/O
Quick Answer: Both models are 1U with copper multigig, PoE, SFP and SFP+ uplinks, out-of-band management, and a 10G HSCI link for high availability. PA-1410 provides four 1/10G SFP+ ports against eight on PA-1420, and SSD capacity doubles from 120 GB to 240 GB. PoE budget is 151 W on both.
| Item | PA-1410 | PA-1420 |
|---|---|---|
| Form factor | 1U | 1U |
| Data I/O (datasheet) | 8× 1G; 4× 1/2.5/5G PoE; 6× 1G SFP; 4× 1/10G SFP+ | 4× 1G; 4× 1/2.5/5G; 4× 1/2.5/5G PoE; 2× 1G SFP; 8× 1/10G SFP+ |
| PoE budget | 151 W total / 90 W max per port | Same |
| Storage | 120 GB SSD | 240 GB SSD |
| Power (avg/max) | ~250 / 290 W | ~260 / 300 W |
| HA | 10G HSCI + management | Same |
Use Cases
Quick Answer: Typical deployments are the branch internet edge, small campus, and retail or remote-office sites where the firewall also powers local phones, access points, and cameras over PoE. It serves as an SD-WAN spoke once Advanced SD-WAN is licensed. Move up to PA-3400 when Threat Prevention demand passes roughly 7 Gbps.
Branch / ROBO edge
Terminate ISP and VPN, enforce Threat Prevention, power local phones/APs from the same chassis.
Midsize office NGFW
PA-1420 when you need higher TP and more 10G SFP+ density without jumping to PA-3400.
Buying Notes
Quick Answer: Choose the model on Threat Prevention throughput and PoE load first, then add optics for the SFP and SFP+ cages, HA cabling if you deploy a pair, subscriptions for Threat Prevention, WildFire, DNS Security and SD-WAN, a virtual-systems license beyond the base one, and the support term.
- PA-1410 vs PA-1420 (TP and 10G density)
- PoE device list vs 151 W budget
- SFP/SFP+ optics and HA cabling
- Threat Prevention / WildFire / DNS / SD-WAN subscriptions
- Virtual systems license if >1 VS
- Support term and RMA plan
Search Palo Alto parts on SKU Lookup.
RFQ checklist before you PO
Quick Answer: Freeze model and option SKUs, support or subscription years, ship-by date, and HA or spare needs on one dated ATP before you compare channel prints. Use the checklist below, validate lines on SKU Lookup when the brand is indexed, then open a BOM risk RFQ — soft channel prices stay industry estimate or pending confirmation.
- Model / MPN lines — chassis and options matching this page (not a vague family name).
- Quantities + HA — single unit vs pair; spare FRUs if required.
- Support / subscription years — tier and term on the same quote as hardware.
- Ship-by / quote validity — lock reprice-until-ship language when memory or list cliffs apply.
- Acceptance — Service Tag / serials vs PO; reject surprise third-party parts without paperwork.
Free Compatibility & Delivery Risk Assessment · Palo Alto SKU Lookup
Which Part Numbers Should You Freeze on the RFQ (2 SKUs)?
Quick Answer: When quoting PAN-PA-1410 and sibling configurations across these 2 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.
| Ordering SKU | Key Configuration & Boundary | Adjacent BOM Lines to Freeze |
|---|---|---|
PAN-PA-1410 | 4.5 Gbps Threat Prevention, 945,000 sessions, 151 W PoE, four 1/10G SFP+. Do not mix with PA-450 desktop or PA-1420 on one column. | PAN-PA-1410 ×2, AP / phone / camera list, SFP+ as drawn, Threat / URL / WildFire / SD-WAN |
PAN-PA-1420 | 6.2 Gbps Threat Prevention, 8x SFP+, 1.4M sessions, 240 GB SSD, 151 W PoE. Not PA-1410. | Second PAN-PA-1420, AP / phone / camera list, SFP+ as drawn, Threat / URL / WildFire / SD-WAN |
Frequently Asked Questions
Quick Answer: PA-1400 targets branch and midsize sites; dense data center or high-speed gateway designs start at PA-3400. Advanced SD-WAN runs on the firewall itself once licensed, so confirm the subscription SKU rather than assuming it is bundled. Both models ship with one virtual system and scale to six with additional licensing.
The official PA-1400 Series datasheet is on Palo Alto Networks: paloaltonetworks.com/resources/datasheets/pa-1400-series. This page is the RFQ table — PA-1410 vs PA-1420 threat prevention and the 151 W PoE budget — so you size before opening the vendor sheet. Confirm PAN-OS train and subscriptions on the quote.
It is positioned for branch and midsize sites. Dense DC / high-speed gateway designs usually start at PA-3400 or higher.
Advanced SD-WAN can run on the firewall when licensed — confirm the subscription SKU on the RFQ rather than assuming it is included.
Base is one VS; maximum six with additional licensing on both PA-1410 and PA-1420.
Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: Take the PA-1410 below roughly 4.5 Gbps of Threat Prevention and the PA-1420 up to 6.2 Gbps; anything heavier belongs on a PA-3400. Budget optics, HA cabling, and subscription SKUs as separate lines. Match HA pair SKUs exactly across both chassis.