Insights / Buying Guide

ZDLRA RA26: does the first rack start at 2 database servers and 3 storage servers?

Technical overview of Oracle ZDLRA RA26 — purpose-built data protection appliance for Oracle Database — architecture, 2+3 configuration, technical specifications, and ordering information

Quick Take

Quick Take: Oracle Zero Data Loss Recovery Appliance (ZDLRA) RA26 is a purpose-built data protection appliance that eliminates database backup windows and guarantees zero data loss. The 2+3 configuration pairs 2 database servers with 3 storage servers in a factory-integrated rack, supporting up to 72 disk drives for backup storage. Real-time redo transport, automatic backup validation, and incremental-forever backup architecture.

Configuration Options

Quick Answer: Four factory configurations scale storage independently of compute. The 2+1 starter gives about 60 TB usable, the 2+3 balanced build about 180 TB for medium-to-large estates, the 2+6 about 360 TB where retention is long, and the 2+12 maximum about 720 TB. Every option ships with two database servers for high availability.

ZDLRA RA26 is available in multiple pre-defined configurations to match data protection requirements. The appliance uses asymmetric scaling — database server count and storage server count need not be equal, allowing optimization for compute or storage capacity.

2+3 Configuration (Balanced): 2 database servers paired with 3 storage servers. This balanced configuration is suitable for medium to large Oracle Database estates requiring several terabytes of backup capacity with real-time redo transport. The 2+3 configuration provides redundancy across both tiers while maintaining cost efficiency.

Configuration Database Servers Storage Servers Typical Backup Capacity Typical Deployment
2+1 Starter 2 1 ~60 TB usable Small-to-mid database estates
2+3 Balanced 2 3 ~180 TB usable Medium-to-large database estates
2+6 Storage-heavy 2 6 ~360 TB usable Large estates, long retention
2+12 Maximum 2 12 ~720 TB usable Very large estates, compliance

All configurations include dual database servers for high availability — if one database server fails, the remaining server continues to accept redo data and perform backup operations without interruption. Storage servers can also be configured with redundancy for protection against disk and server failures.

System Architecture

Quick Answer: Two tiers share one rack over a RoCE fabric. Database servers run Oracle Linux and the Recovery Appliance stack, handling redo transport, orchestration and corruption detection. Storage servers hold the backups on HDD with NVMe cache, in native Oracle block format. Dual Cisco 9336C switches carry the fabric; a 9348 handles management.

ZDLRA RA26 follows a two-tier architecture within a single rack, connected by a high-speed RoCE fabric.

Database Servers (Compute Tier)

The database servers run Oracle Linux and host the Recovery Appliance software stack. They manage redo transport from protected databases, orchestrate backup and recovery operations, and run automated backup validation and corruption detection. Each database server uses Intel Xeon processors with substantial memory for managing concurrent backup and recovery operations across hundreds of source databases.

Storage Servers (Storage Tier)

Storage servers provide the disk capacity for backup data and use Oracle Recovery Appliance Storage Software for data management. Each storage server is equipped with large-capacity HDDs and NVMe flash cache for metadata and recent backup data. All backup data is stored in Oracle's native database format, enabling direct database access to backup data without restoration — a capability unique to ZDLRA.

RoCE Fabric

The internal network uses RDMA over Converged Ethernet (RoCE) with dual Cisco 9336C switches, providing redundant, low-latency connectivity. A dedicated Cisco 9348 management switch handles out-of-band management traffic. The RoCE fabric supports the high-bandwidth redo transport and backup data movement required for enterprise-scale data protection.

Client Access Network

Protected databases connect to the ZDLRA via a dedicated 10/25GbE client access network using SFP28 transceivers. This isolated network segment ensures backup traffic does not compete with production network bandwidth. Oracle Dual Port 100 Gb Ethernet Adapters are available for environments requiring higher-throughput connectivity between the appliance and the data center backbone.

Fibre Channel Connectivity

The RA26 supports optional 32 Gb Fibre Channel HBAs (Qlogic) for direct SAN connectivity, enabling backup-to-tape workflows and integration with existing storage infrastructure where required by compliance or archival policies.

Product Overview

Quick Answer: RA26 is the sixth generation of Oracle's engineered appliance for Oracle Database protection, replacing generic storage plus third-party backup software with database-aware backup, recovery and validation in one rack. Real-time redo transport removes the backup window, and this generation adds denser disk, RoCE networking and Oracle Database 23ai integration.

Oracle Zero Data Loss Recovery Appliance (ZDLRA) RA26 is the sixth-generation purpose-built data protection appliance for Oracle Database environments. Unlike traditional backup solutions that rely on generic storage and third-party backup software, ZDLRA is an engineered system that integrates database-aware backup, recovery, and validation into a single appliance. It eliminates backup windows entirely by continuously capturing database changes through real-time redo transport, guaranteeing zero data loss even in the event of a primary system failure.

The RA26 generation introduces higher-capacity disk storage, faster networking with RoCE fabric, and enhanced integration with Oracle Database 23ai. The appliance is factory-integrated and tested, reducing deployment time and eliminating multi-vendor integration complexity. It supports all Oracle Database editions and deployment models, including on-premises, Oracle Cloud, and hybrid architectures.

Technical Specifications

Quick Answer: Both server types use Intel Xeon Scalable processors, DDR5 memory and mirrored SSD pairs for the operating system, with backup capacity living on the storage nodes as HDD plus NVMe cache. The fabric runs RoCE v2 at 25GbE per port, clients attach over 10/25GbE SFP28, and two 22 kVA PDUs feed the rack.

Server Node Specifications

Component Database Server Storage Server
Processor Intel Xeon Scalable Intel Xeon Scalable
Memory Large capacity DDR5 Standard DDR5
OS Storage 2x SSD (mirrored) 2x SSD (mirrored)
Backup Storage N/A Large-capacity HDD + NVMe cache
Software Oracle Linux + Recovery Appliance Recovery Appliance Storage Software

Networking Specifications

Component Specification
RoCE fabric switch Cisco 9336C v2 (2x for redundancy)
Management switch Cisco 9348 v2 (1x)
Fabric speed 25GbE per port, RoCE v2
Client access 10/25GbE SFP28
High-speed uplink Oracle Dual Port 100 GbE Adapter v2
Fibre Channel (optional) 32 Gb FC PCIe HBA, dual-port (Qlogic)
Cabling QSFP28 passive copper, 1m and 3m

Power and Physical

Specification Detail
PDU 1-phase high voltage 22 kVA, 2P3W-IP44 (APAC/EMEA)
PDU count 2 (redundant power feeds)
Rack density Full rack with filler panels
Form factor Standard 19" rack, factory-integrated

Features and Benefits

Quick Answer: Six capabilities define the appliance: zero data loss through continuous redo capture, incremental-forever backups that cut backup storage 50-90%, redo intake from thousands of databases without production impact, automatic validation that repairs corrupt blocks from the source, direct query access to backups, and single-console management through Enterprise Manager.

Zero Data Loss Guarantee

ZDLRA captures database changes in real time via Oracle redo transport. Every committed transaction is transmitted to the appliance within seconds, eliminating the data loss window inherent in periodic backup schedules. In the event of a primary database failure, recovery can restore to the exact point of failure with zero data loss.

Incremental-Forever Backup Architecture

After the initial full backup, all subsequent backups are incremental. The appliance maintains a virtual full backup image by merging incremental changes with the baseline, so administrators always have access to a current full backup without the time and storage overhead of periodic full backups. This reduces backup storage consumption by 50-90% compared to traditional full-plus-incremental strategies.

Real-Time Redo Transport

Using Oracle Data Guard redo transport, ZDLRA continuously receives redo data from protected databases as transactions occur. The appliance can accept redo from thousands of databases simultaneously, providing centralized data protection for the entire Oracle Database estate with no impact on production database performance.

Automatic Backup Validation

ZDLRA automatically validates every backup by restoring blocks to a validation area and checking for physical and logical corruption. Corrupted blocks are automatically repaired by fetching undamaged copies from the protected database, eliminating the risk of discovering corrupt backups only at recovery time — the leading cause of recovery failure in enterprise environments.

Database-Aware Storage

Backup data is stored in Oracle Database blocks, enabling direct database access to backup data without requiring a restore operation. This enables use cases such as table-level recovery, data mining on backup data, and offloading validation and reporting workloads to the appliance.

Centralized Management

Oracle Enterprise Manager and the Recovery Appliance command-line interface provide unified management across all protected databases. Administrators can configure protection policies, monitor redo transport lag, track backup validation results, and manage retention policies from a single console.

Ordering Information

Quick Answer: The rack ships factory-integrated, so components cannot be bought piecemeal. A 2+3 build lists base unit 7632605, two database-server and three storage-server Linux images, base rack 7632633, two Cisco 9336C fabric switches, Cisco 9348 management switching, PDUs, optics and cabling, plus 72 perpetual disk-drive software licenses under L100698.

ZDLRA RA26 is ordered as a factory-integrated rack system. Below are the key part numbers for a 2+3 balanced configuration:

Part Number Description Qty
7632605 ZDLRA RA26: Model Family (base unit) 1
7632637 RA26: Oracle Linux software image for database server (factory install) 2
7632638 RA26: Oracle Linux software image for storage server (factory install) 3
7632633 RA26 Base Rack (factory install) 1
7606205 Cisco 9336C RoCE networking fabric switch v2 (factory install) 2
7606207 Cisco 9348 management switch v2 (factory install) 2
7605025 QSFP28 passive copper cable, 3m, 30 AWG 20
7605026 QSFP28 passive copper cable, 1m, 30 AWG 16
7606295 Engineered Systems 1 RU filler panel v2 58
6443A 1-phase high voltage 22kVA PDU, 2P3W-IP44 (EMEA/APAC) 2
7605565 Oracle Dual Port 100 Gb Ethernet Adapter v2 8
7116972 Oracle Storage 32 Gb FC PCIe low profile HBA, dual-port (Qlogic) 4
7604270 Oracle 10/25 GbE Dual Rate SFP28 Short Range Transceiver 16

Software Licensing

Part Number Description Qty
L100698 Oracle Zero Data Loss Recovery Appliance Software — Disk Drive Perpetual 72

Services

Part Number Description
B82258 Oracle Zero Data Loss Recovery Appliance Configuration Service
B74194 Oracle Standard System Installation Service, Site Audit: Engineered Systems Group II

Note: Part numbers listed here are for reference. All ZDLRA configurations are factory-integrated — individual components cannot be ordered separately. Contact your Oracle representative or authorized partner for current pricing, availability, and configuration validation.

Warranty, Service and Support

Quick Answer: Every RA26 includes Oracle Premier Support for Systems: 24x7 access to Oracle engineers, hardware replacement, firmware and software updates covering the whole stack. Deployment is handled by the ZDLRA Configuration Service, which registers protected databases and sets protection policies, and by the Standard System Installation Service covering site audit and on-site supervision.

Oracle ZDLRA RA26 includes Oracle Premier Support for Systems, providing 24x7 global access to Oracle support engineers, hardware replacement, and software updates. Key support components include:

  • Hardware warranty: Coverage for all rack components including servers, switches, PDUs, and cabling
  • Oracle Premier Support for Systems: Software updates, firmware patches, and technical support for the entire ZDLRA stack
  • ZDLRA Configuration Service: On-site configuration assistance including initial setup, protected database registration, and protection policy configuration
  • Standard System Installation Service: Site audit, installation planning, and on-site deployment supervision
  • ACS services: Oracle Advanced Customer Services available for enhanced support levels and proactive monitoring

For more information about Oracle ZDLRA RA26, including current pricing, configuration assistance, and procurement support, contact BENQUAN GLOBAL LIMITED.

Key Takeaway

Key Takeaway: ZDLRA RA26 removes the backup window and validates every block on ingest, so recovery failures surface long before you need the restore. The 2+3 balanced rack lands near 180 TB usable backup capacity, which suits medium-to-large Oracle estates. BENQUAN GLOBAL LIMITED supplies the Oracle Zero Data Loss Recovery Appliance RA26 with competitive pricing.

Frequently Asked Questions

Quick Answer: RA26 is Oracle's sixth-generation backup appliance for Oracle Database, reaching zero data loss by taking redo within seconds of each commit. The 2+3 build pairs two database servers with three storage servers for roughly 180 TB usable. Storage and compute scale independently, and the system arrives factory-integrated with Premier Support.

What is Oracle ZDLRA RA26?

The sixth-generation purpose-built data protection appliance for Oracle Database environments. Unlike generic storage plus third-party backup software, it is an engineered system integrating database-aware backup, recovery and validation in a single appliance — eliminating traditional backup windows entirely.

How does ZDLRA achieve zero data loss?

Real-time redo transport: every committed transaction is transmitted to the appliance within seconds, closing the data-loss window inherent in periodic backup schedules. In the event of a primary database failure, recovery restores to the exact point of failure.

What does the 2+3 configuration provide?

Two database servers running the Recovery Appliance software stack (redo transport, orchestration, automated backup validation and corruption detection) paired with three storage servers using large-capacity HDD plus NVMe cache — approximately 180TB of usable backup capacity for medium-to-large Oracle Database estates.

How does RA26 scale as backup requirements grow?

Asymmetrically: database server and storage server counts scale independently within the rack over the RoCE fabric, so capacity-heavy estates add storage servers without paying for unneeded compute. The system is ordered factory-integrated, with Oracle Premier Support for Systems included.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents