ZDLRA RA26: does the first rack start at 2 compute servers and 3 storage cells?

Freeze an Oracle Zero Data Loss Recovery Appliance RA26 CapEx BOM beside Exadata production racks — base 2+3, RA26 vs RA26-Z usable capacity, redundancy mode, client network, PDU, and RFQ line items. Not a ZDLRA vs RMAN platform bake-off.

Quick Take

Quick Take: ZDLRA RA26 protects Exadata and Oracle Database estates with real-time redo and incremental-forever virtual fulls. CapEx starts at 2 compute + 3 storage, then grows storage cells (RA26 or RA26-Z) to 17 per rack. Freeze usable TB, redundancy, network, and PDU on one BOM before order.

Base Rack (= 2 Compute + 3 Storage)

Quick Answer: Every RA26 rack keeps two compute servers for Recovery Appliance software HA. Capacity starts at three storage servers and expands by adding storage servers only — not by adding compute nodes. Plan client network and PDU with the base rack, not as afterthoughts.

ZDLRA BOMs fail when quotes omit redundancy mode (usable TB halves under high redundancy), mix RA26 and RA26-Z without stating class, or treat the recovery appliance as a substitute for Exadata production cells on the same CapEx line.
2+3
Base Rack
17
Max Storage / Rack
1.9 PB
Full RA26 Usable
BOM
Freeze Before CapEx

Base infrastructure (every RA26 / RA26-Z rack):

  • 2× Recovery Appliance compute servers (fixed count)
  • 3× storage servers minimum (RA26 or RA26-Z class)
  • 2× RoCE Network Fabric Switches
  • 2× redundant PDUs (phase/voltage matched to site)
  • 1× management network switch
  • Client access network for protected databases (10/25 GbE typical; 100 GbE options)

Optional: Fibre Channel HBAs for tape/SAN adjacency where compliance requires it.

When This Checklist Matters

Quick Answer: Use this page when you already chose ZDLRA for Oracle protection and need every CapEx line frozen — especially beside an Exadata refresh. Skip it if you still need ZDLRA versus RMAN versus third-party platform selection, or only need RA26 hardware specs depth.

RA26 vs RA26-Z — Usable Capacity

Quick Answer: Oracle publishes RA26 and RA26-Z storage-server classes with different usable TB steps. Under normal redundancy, a base RA26 rack is about 332 TB usable; each added RA26 cell about 112 TB. RA26-Z base is about 164 TB; each added cell about 56 TB. High redundancy roughly halves those figures — always state mode on the RFQ.

Published guidance (normal redundancy) RA26 RA26-Z
Base rack (3 storage) ~332 TB usable ~164 TB usable
Per added storage server ~112 TB usable ~56 TB usable
Full rack (17 storage) ~1.9 PB usable ~943 TB usable
High redundancy (approx.) ~72 TB / cell; ~1.2 PB full ~36 TB / cell; ~605 TB full
Multi-rack cluster Up to 14 full racks (~26.6 PB) Up to 14 full racks (~13.2 PB)

Sizing rule of thumb

Model protected database size × retention × change rate, then apply incremental-forever / virtual-full efficiency — do not size ZDLRA as if every full backup is stored every night. Confirm policy retention and replication to a second ZDLRA before freezing cell count.

Network, PDU & Scale-Out

Quick Answer: Protected databases reach ZDLRA on a dedicated client Ethernet path so redo and backup traffic stay off production LAN contention. Internal RoCE stays inside the appliance. Wrong PDU phase or undersized client bandwidth is a common delivery delay after CapEx approval.

BOM decision What to freeze
Client network 10/25 GbE SFP28 baseline; dual-port 100 GbE when estate throughput requires it
Internal fabric Dual RoCE switches (factory) — do not omit from multi-vendor quotes
FC option 32 Gb FC HBAs only if tape/SAN adjacency is on the brief
PDU 1-phase or 3-phase; HV/LV; region plug standard
In-rack growth Add storage servers toward 17; follow Oracle population rules
Multi-rack Cluster up to 14 full racks when single-rack usable TB is insufficient

BOM Line Items to Freeze

Quick Answer: Treat ZDLRA CapEx as seven hardware and service buckets plus a separate protection-policy brief for databases. Keep the Exadata production BOM on its own CapEx column — recovery usable TB is not a substitute for Smart Scan cells or database-server memory.

  1. Model family: ZDLRA RA26 base / factory rack integration
  2. Compute: 2× compute servers (standard on every rack)
  3. Storage: count × RA26 or RA26-Z; state normal vs high redundancy
  4. Fabric: 2× RoCE switches + management switch
  5. Client / optional FC: adapters, optics, cabling to Exadata/client network
  6. Power: 2× PDUs — phase, voltage, region
  7. Services: Premier Support for Systems, configuration/ACS, shipping
  8. Adjacency (separate CapEx): Exadata elastic BOM; optional second ZDLRA for replication
Example shapes Storage servers Notes
Entry / base 3 Minimum; pick RA26 or RA26-Z + redundancy
Mid growth 6–9 Common step after first retention year
Near-full rack 12–17 Confirm power/cooling and population slots
Multi-rack Cluster when single-rack usable TB or throughput ceiling binds

RFQ Checklist — Beside Exadata CapEx

Quick Answer: One data protection brief should equalize estate size, recovery objectives, retention days, RA26 class and redundancy mode, storage server count with a growth path, client network class, power distribution and lead time. Put Exadata production and ZDLRA recovery as two capital columns sharing identical protected-database license assumptions.

  1. Estate: database count/size, Exadata vs standalone, change rate, retention days
  2. RPO/RTO: real-time redo requirement vs backup-cycle only
  3. Class: RA26 vs RA26-Z; normal vs high redundancy
  4. Counts: storage servers now + 3–5 year growth path
  5. Network: client GbE class; FC yes/no; optics/cabling
  6. Power: PDU phase/voltage; rack RU and cooling
  7. Replication: second ZDLRA / remote site yes/no
  8. Exadata column: link to elastic BOM if production refresh is concurrent
  9. Delivery: factory lead time, install, protection-policy cutover window

Frequently Asked Questions

Quick Answer: Start from the 2+3 base, pick RA26 or RA26-Z with an explicit redundancy mode, then freeze client network and PDU. Size usable TB from retention and change rate — not from nightly full-backup folklore — and keep Exadata production CapEx on a separate line.

Two compute servers and three storage servers, plus dual RoCE switches, redundant PDUs, and a management switch. Grow capacity by adding storage servers up to 17 per rack.

RA26 for larger usable TB per cell; RA26-Z for smaller capacity steps. Always state normal vs high redundancy — high redundancy roughly halves usable capacity.

No. ZDLRA is the recovery plane. Exadata cells serve production Smart Scan I/O. Budget both racks when refreshing a mission-critical Oracle estate.

Oracle documents that replacing older storage servers with newer ones while keeping existing backups online is not supported without re-image. Plan generation swaps as migration projects, not hot swaps.

Submit one RFQ with the BOM checklist above.

Key Takeaway

Key Takeaway: ZDLRA RA26 CapEx wins or loses on usable-TB honesty — RA26 vs RA26-Z, redundancy mode, storage count, and network/PDU completeness — beside a separate Exadata production BOM. BENQUAN GLOBAL LIMITED supplies Oracle ZDLRA RA26 with competitive pricing and configuration support for global buyers.

Not sure your ZDLRA backup BOM is complete?

If RA26 vs RA26-Z, redundancy mode, usable TB, client network, or Exadata adjacency CapEx is unclear, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents