Quick Take
Quick Take: OCI FastConnect (partner circuit into DRG) and AWS Direct Connect (dedicated or hosted ports) are peer underlay paths for OCI↔AWS estates — not Azure ExpressRoute or hub routing. Dual-cloud buyers often procure both on separate BOM lines. Peer on bandwidth, colo, DRG/VIF scope, and redundancy.
When OCI FastConnect vs Direct Connect Actually Matters
Quick Answer: Use this guide when estates run Oracle databases, Exadata Cloud Service, or licensed Oracle middleware on OCI while application, analytics, or DR tiers sit on AWS. The decision is colo placement, DRG routing, circuit bandwidth, and redundancy — not a generic hyperscaler interconnect bake-off against Azure.
- Not AWS vs Azure: That pairing is a separate RFQ axis — see Direct Connect vs ExpressRoute.
- Not hub routing: Transit Gateway and Virtual WAN are in-cloud routing planes — see Transit Gateway vs Virtual WAN.
- Not SD-WAN overlay: Branch overlay is a separate RFQ — see Prisma SD-WAN vs VeloCloud.
- Oracle gravity: OCI often hosts database and ERP cores; AWS hosts cloud-native apps, data lakes, or DR — private interconnect links both without internet egress for replication traffic.
OCI FastConnect — DRG, Partner Circuit, and Region Mapping
Quick Answer: FastConnect delivers private Layer 2 or routed paths from your colo or Oracle-approved partner into OCI via a Dynamic Routing Gateway. Quote circuit bandwidth tier, provider, peering location, DRG attachment, virtual circuit count, and target OCI Region — each line item bills separately from AWS Direct Connect or SD-WAN SKUs.
| Dimension | What the RFQ must state |
|---|---|
| Connection model | Partner FastConnect (provider-managed circuit) vs colo cross-connect at Oracle peering site — confirm Oracle-approved provider list for your Region |
| Circuit bandwidth | Partner circuit speed tier (1 Gbps through 10 Gbps+ classes) — minimum and burst if provider offers committed vs burstable |
| Peering location | Oracle FastConnect peering site ID aligned with target OCI Region latency and compliance (e.g., Hong Kong, Singapore, Tokyo paths) |
| DRG attachment | Dynamic Routing Gateway ID, route table policy, BGP prefixes advertised and accepted — one DRG can attach multiple virtual circuits |
| Virtual circuit count | Production vs DR circuits, separate VLAN or BGP session per circuit when segmentation requires it |
| OCI Region | Each virtual circuit maps to one OCI Region; multi-Region estates need multiple circuits or hub DRG design |
| Metering dimensions | Partner circuit monthly, OCI FastConnect port hours if applicable, outbound data transfer per GB — model dimensions on the quote |
Partner vs colo honesty
Partner FastConnect uses an Oracle-approved telco or colo provider — you buy circuit bandwidth from the partner who terminates at Oracle peering. Colo cross-connect at a meet-me room gives you direct handoff when you already have presence. Both still require BGP configuration on DRG and redundant design when RTO demands dual circuits.
AWS Direct Connect — Dedicated, Hosted, and OCI Adjacency
Quick Answer: Direct Connect delivers private paths from colo or partner handoff into AWS VPC or Transit Gateway. In OCI↔AWS estates, Direct Connect serves the AWS application tier — quote port speed, connection type, virtual interface count, and target AWS Region on a separate BOM line from FastConnect.
| Dimension | What the RFQ must state |
|---|---|
| Connection type | Dedicated connection vs hosted connection (partner provisions port, you buy virtual connection bandwidth) |
| Port speed | Physical port tier — 1 Gbps, 10 Gbps, 100 Gbps class at Direct Connect location aligned with OCI partner colo when shared meet-me room is possible |
| Virtual interfaces | Private VIF (VPC), transit VIF (Transit Gateway) — count and BGP scope; public VIF only when S3/DynamoDB public endpoint paths are required |
| AWS Region | Each VIF maps to one Region; cross-Region replication from OCI may land in a different Region than primary app tier |
| Shared colo opportunity | When FastConnect partner and Direct Connect location share a facility, one cross-connect demarc may serve both — still two cloud contracts |
| Metering dimensions | Port hours, outbound data transfer per GB, hosted-connection bandwidth tier — itemize separately from FastConnect partner fees |
Transit VIF for multi-VPC AWS
Estates with many AWS VPCs often attach Direct Connect via Transit Gateway rather than per-VPC private VIFs. State TGW attachment, route table policy, and whether OCI-originated prefixes propagate to all VPCs or segmented route tables — hub routing BOM is separate but references the same Direct Connect circuit.
OCI↔AWS Dual-Cloud Reality — Often Both, Not Either
Quick Answer: Estates running Oracle on OCI and applications on AWS simultaneously usually procure FastConnect and Direct Connect on separate BOM lines. Shared colo can reduce cross-connect cost, but each cloud bills its own circuit, DRG or gateway attachment, and egress metering — forcing a false winner wastes negotiation leverage.
- Database on OCI, apps on AWS: Budget two underlay paths — FastConnect virtual circuit plus Direct Connect VIF — even when traffic volumes differ.
- Replication traffic: Oracle Data Guard, GoldenGate, or backup replication across clouds needs private path sizing on both circuits — do not size only the heavier direction.
- Shared colo: One meet-me room can host FastConnect partner handoff and Direct Connect port; cross-connect may be one logical demarc but two provider and cloud contracts.
- DR asymmetry: DR OCI Region or DR AWS Region may need a second circuit — do not assume primary Region path covers failover Region.
- Egress math: OCI and AWS data transfer out meters per Region — model dimensions separately; replication and backup traffic can dominate cross-cloud cost.
Hub Routing vs Underlay — Separate RFQ Lines
Quick Answer: FastConnect and Direct Connect are underlay private circuits. Transit Gateway, Virtual WAN, and OCI DRG route tables are in-cloud routing planes that attach to those circuits. Quote underlay and hub routing on separate BOM rows with explicit circuit and attachment references.
- AWS hub: Transit Gateway vs Virtual WAN — in-cloud hub routing when many VPCs or VNets need centralized policy; transit VIF connects Direct Connect to TGW.
- Azure adjacency: If a third cloud hosts workloads, Direct Connect vs ExpressRoute covers AWS-Azure underlay — add ExpressRoute as a third BOM line, not a substitute for FastConnect.
- SD-WAN overlay: EdgeConnect vs FortiGate SD-WAN — branch overlay selects among DIA, MPLS, and private interconnect; does not replace FastConnect or Direct Connect.
- DEM visibility: ThousandEyes vs Catchpoint — path quality over interconnect and internet; does not provision circuits.
Do not bundle NGFW with interconnect
Cloud NGFW, SASE, and on-prem FortiGate or PA appliance quotes belong on separate BOM rows — see AWS Network Firewall vs VM-Series for AWS VPC inspection. Interconnect lands as referenced underlay transport only.
BOM & Colo Structure — Circuits, Cross-Connect, Redundancy
Quick Answer: A complete OCI↔AWS interconnect BOM itemizes FastConnect partner circuit, Direct Connect port or hosted connection, colo cross-connect, DRG and VIF attachment, dual-circuit redundancy, and separate rows for hub routing, SD-WAN, and NGFW. Missing cross-connect or second path is the most common delivery-risk gap on dual-cloud quotes.
| BOM line | OCI FastConnect | AWS Direct Connect |
|---|---|---|
| Physical layer | Partner circuit or colo cross-connect at Oracle peering site | Dedicated port or hosted partner connection |
| Bandwidth tier | Partner circuit Mbps + DRG virtual circuit count | Port speed + hosted connection Mbps cap |
| Colo / cross-connect | Meet-me cross-connect at FastConnect peering location | Direct Connect location cross-connect (may share facility with FastConnect) |
| Logical layer | DRG attachment, BGP prefixes, route table policy | VIF count, BGP scope, Transit Gateway attachment if used |
| Redundancy | Second virtual circuit or diverse partner path | Second port or second hosted connection in diverse path |
| Separate RFQ rows | TGW/Virtual WAN hub, SD-WAN, NGFW, DEM — reference circuit ID | Same — firewall and overlay on distinct line items |
Lead time risk
Partner circuit provisioning, colo cross-connect work orders, and hosted-connection queues often exceed cloud API provisioning time. State ATP dates on each line — Oracle peering site availability is not the same as end-to-end OCI↔AWS private path ready.
RFQ Checklist — OCI↔AWS Interconnect BOM on One Brief
Quick Answer: Issue one dual-cloud brief carrying FastConnect line items, Direct Connect line items and the colocation cross-connect, keeping hub routing, software-defined wide area networking and firewalls on separate rows. Equalize bandwidth, virtual circuit scope, redundancy design and contract term before comparing providers, and state peak against committed throughput per path.
What to put on the RFQ
- Target OCI Regions and AWS Regions per workload class (DB, app, DR, analytics)
- Required Mbps per path (peak and committed), RTO/RPO for circuit failure
- FastConnect: partner or colo model, circuit bandwidth, peering site, DRG ID, virtual circuit count
- Direct Connect: dedicated vs hosted, port speed, location ID, VIF types and count, TGW attachment if used
- Colo: facility, cross-connect scope, shared meet-me opportunity, diverse path requirement
- Redundancy: dual circuit, dual port, or active-active vs active-standby per cloud
- Replication: GoldenGate, Data Guard, backup, or analytics sync bandwidth in both directions
- Metering: partner circuit monthly, port hours, outbound data transfer — no blended WAN figure
- Separate rows: Transit Gateway hub, SD-WAN overlay, NGFW, SASE, DEM tools
- Lead time: partner ATP, colo work order, quote validity window
Submit the interconnect brief on rfq.html.
Frequently Asked Questions
Quick Answer: FastConnect and Direct Connect are separate underlay circuits, so dual-cloud buyers usually procure both as two columns on one brief rather than picking a winner. Neither replaces in-cloud hub routing, which attaches to those circuits and belongs on its own line. Peer on bandwidth, colocation, circuit scope and redundancy.
For OCI↔AWS dual-cloud estates, yes — but as two BOM columns on one brief, not a single winner. Peer each column on bandwidth, colo, DRG/VIF scope, and redundancy. Do not blend with Azure ExpressRoute unless Azure also hosts production.
No. That guide covers AWS↔Azure underlay. This guide covers OCI↔AWS cross-cloud interconnect — a distinct procurement axis for Oracle-on-OCI plus AWS application tiers.
No. FastConnect and Direct Connect are underlay circuits. Transit Gateway and DRG route tables are in-cloud hub routing that attach to those circuits. Quote on separate RFQ rows.
Submit circuit bandwidth, colo, DRG and VIF intent, target Regions, and redundancy on one brief.
Key Takeaway
Key Takeaway: FastConnect and Direct Connect are peer underlay paths, not substitutes for ExpressRoute, in-cloud hub routing or SD-WAN overlay, so dual-cloud estates usually buy both on separate BOM lines. Compare on DRG attachment honesty, equal bandwidth assumptions and shared colo cross-connect scope, with hub routing and security priced separately. BENQUAN GLOBAL LIMITED supplies cross-cloud interconnect procurement support with competitive pricing.