Insights / Buying Guide

Exadata X11M datasheet: do eight database servers at 2.25TB each give you 18TB of memory?

Technical overview of Oracle Exadata Database Machine X11M with 2.25TB memory database servers — architecture, configuration options, technical specifications, and ordering information

Quick Take

Quick Take: Oracle Exadata Database Machine X11M with 2.25TB memory database servers delivers 18TB total database server memory in an 8-node configuration, paired with high-capacity storage servers for enterprise database consolidation. The platform supports Oracle Database 23ai, Smart Scan offload, Hybrid Columnar Compression, and RDMA over Converged Ethernet (RoCE) fabric. This guide covers technical specifications, architecture, configuration options, and ordering part numbers.

Technical Specifications

Quick Answer: Both node types run 5th Generation Intel Xeon Scalable processors and two 25GbE RoCE ports, but memory is asymmetric: 2.25TB of DDR5 in a database server against 256GB in a storage server. Storage nodes front high-capacity disk with NVMe flash cache; clients attach at 10/25GbE and racks draw single-phase 22kVA PDUs.

Server Node Specifications

Component Database Server Storage Server (HC)
Processor Intel Xeon Scalable 5th Gen Intel Xeon Scalable 5th Gen
Memory 2.25 TB DDR5 256 GB DDR5
Storage OS: 2x SSD (mirrored) HC: HDD + NVMe flash cache
Network 2x 25GbE RoCE + management 2x 25GbE RoCE + management
Software Oracle Linux + Oracle Database Exadata Storage Server Software

Networking Fabric

Component Specification
RoCE fabric switch Cisco 9336C (2x for redundancy)
Management switch Cisco 9348 (1x)
Fabric speed 25GbE per port, RoCE v2
Client access 10/25GbE SFP28
Cabling QSFP28 passive copper, 1m and 3m

Power and Physical

Specification Detail
PDU 1-phase high voltage 22 kVA, 2P3W-IP44 (APAC/EMEA)
Rack density Full rack with filler panels (11x 1RU)
Form factor Standard 19" rack, factory-integrated

System Architecture

Quick Answer: Three tiers fill one rack. Oracle Linux database nodes scale to 2.25TB of DDR5 each, reaching 18TB across eight nodes. Storage nodes come two ways — high-capacity disk with NVMe flash cache, or Extreme Flash all-NVMe — and Cisco 9336C switches carry the RoCE fabric that makes Smart Scan offload possible.

Exadata X11M follows a scale-out architecture with three tiers within a single rack:

Database Servers

The database servers run Oracle Linux and host the Oracle Database software. Each database server is equipped with Intel Xeon processors and large memory configurations — up to 2.25TB per server using DDR5 memory. In a fully configured rack, database servers provide 18TB of total memory across 8 nodes for in-memory database processing.

Storage Servers

Storage servers run Oracle Exadata Storage Server Software and handle all I/O operations. They are available in two variants:

  • High Capacity (HC): Large-capacity HDD-based storage with NVMe flash cache for cost-effective bulk storage
  • Extreme Flash (EF): All-NVMe flash storage for maximum IOPS performance

RoCE Fabric

The internal network uses RDMA over Converged Ethernet (RoCE) with Cisco 9336C switches, providing low-latency, high-bandwidth connectivity between database and storage servers. RoCE enables Smart Scan offload — Exadata's signature capability where storage servers process SQL predicates directly, returning only relevant rows to the database servers.

Configuration Options

Quick Answer: Database and storage node counts need not match, which is why four published layouts span very different ratios: 8+6 compute-optimized at 18TB of database memory, 6+6 balanced at 13.5TB, 8+8 balanced at 18TB, and 12+12 at 27TB for mission-critical estates. Storage-heavy racks suit warehouse scans.

Exadata X11M racks can be configured asymmetrically — database servers and storage server counts need not match. This flexibility allows optimization for compute-heavy or storage-heavy workloads.

8+6 Configuration (Compute Optimized): 8 database servers with 2.25TB memory each (18TB total) paired with 6 high-capacity storage servers. This configuration suits enterprises consolidating 40+ databases where compute headroom and memory capacity for Oracle Database In-Memory are the primary requirements.

Symmetric Configurations: Equal counts of database and storage servers (e.g., 6+6, 8+8, 12+12) for balanced workloads where storage throughput must scale proportionally with compute.

Storage-Heavy Configurations: More storage servers than database servers for data warehouse and analytics workloads where Smart Scan throughput and storage capacity are the bottleneck.

Configuration Database Servers Storage Servers Total Memory Typical Workload
8+6 Compute Optimized 8 x 2.25TB 6 HC 18 TB Database consolidation, mixed OLTP/DW
6+6 Balanced 6 x 2.25TB 6 HC 13.5 TB General purpose, mid-range consolidation
8+8 Balanced 8 x 2.25TB 8 HC 18 TB Large-scale consolidation, data warehouse
12+12 Balanced 12 x 2.25TB 12 HC 27 TB Mission-critical, extreme performance

Product Overview

Quick Answer: Exadata X11M is Oracle's current engineered system: database nodes, storage nodes and an RDMA over Converged Ethernet fabric delivered as one integrated rack. This generation lifts memory to 2.25TB per database server, so eight nodes carry 18TB — enough to consolidate hundreds of databases and run large in-memory processing on the same platform.

Oracle Exadata Database Machine X11M is Oracle's latest generation engineered system, purpose-built for running Oracle Database. It combines database servers, high-capacity or extreme performance storage servers, and a high-speed RoCE (RDMA over Converged Ethernet) fabric into a single, integrated platform. The X11M generation introduces support for up to 2.25TB memory per database server, enabling large-scale in-memory database processing and consolidation of hundreds of databases onto a single system.

The Exadata X11M platform is available in multiple configurations to match workload requirements — from extreme-performance OLTP with flash-optimized storage servers to high-capacity configurations for data warehousing and consolidated database estates. All configurations share the same software stack, management tooling, and Oracle support framework.

Features and Benefits

Quick Answer: Smart Scan pushes filtering, projection and joins into the storage tier and cuts database CPU use 40 to 70 percent on analytics. Hybrid Columnar Compression reaches 5 to 15 times using columnar layout for bulk scans and row layout for point queries, while 2.25TB nodes hold In-Memory column stores alongside OLTP.

Smart Scan Offload

Exadata's signature capability. Storage servers process SQL predicate filtering, column projection, and joins directly — only relevant rows and columns traverse the fabric to database servers. This reduces database server CPU consumption by 40-70% for analytics workloads and eliminates I/O bottlenecks.

Hybrid Columnar Compression (HCC)

Delivers 5-15x compression ratios for warehouse and archive data. HCC uses a hybrid model: columnar format for bulk operations and row format for point queries. This substantially reduces storage requirements and improves scan performance by reducing the data volume read from disk.

Oracle Database In-Memory

With 2.25TB per database server, Exadata X11M can maintain large working datasets entirely in memory using Oracle's In-Memory column store (IM column store). This accelerates real-time analytics on the same data used by OLTP transactions — without separate copies or ETL pipelines.

Storage Indexes and Columnar Cache

Storage Indexes track min/max values for columns on each storage server, automatically skipping I/O for irrelevant data blocks. The Columnar Cache stores frequently accessed column data in flash memory, providing memory-speed access without consuming database server memory.

RoCE Fabric with RDMA

RDMA over Converged Ethernet eliminates TCP/IP overhead for database-to-storage communication. This reduces latency for Smart Scan operations and enables efficient parallel I/O across all storage servers.

Single-Vendor Lifecycle Management

Oracle Exadata is a fully engineered system — hardware, software, firmware, and networking are designed, tested, and supported by Oracle. This eliminates multi-vendor integration issues and provides a single support contract for the entire database infrastructure stack.

Ordering Information

Quick Answer: An 8+6 rack quotes as factory-integrated line items: the rack SKU with its first two 2.25TB database servers, six more database servers, six high-capacity storage servers, two 9336C fabric switches and one 9348 management switch, 36 QSFP28 copper cables, 32 SFP28 transceivers, and 72 perpetual Storage Server Software licenses.

Exadata X11M is ordered as a factory-integrated rack system. Below are the key part numbers for a compute-optimized 8+6 configuration:

Part Number Description Qty
7627627 Exadata X11M Rack: 2x 2.25TB DB servers + Chassis (factory install) 1
7621566 Exadata DB Server X11M 2.25TB + Network Fabric (factory install) 6
7621570 Exadata Storage Server X11M High Capacity + Network Fabric (factory install) 6
7605026 QSFP28 passive copper cable, 1m, 30 AWG 8
7606205 Cisco 9336C RoCE networking fabric switch v2 (factory install) 2
7606207 Cisco 9348 management switch v2 (factory install) 1
7605025 QSFP28 passive copper cable, 3m, 30 AWG 28
7621573 Oracle Linux software image for storage server (factory install) 1
7621572 Oracle Linux software image for database server (factory install) 1
7606295 Engineered Systems 1RU filler panel v2 11
7100874 1-phase HV 22kVA PDU, 2P3W-IP44 (EMEA/APAC) 1
7604270 Oracle 10/25GbE Dual Rate SFP28 Short Range Transceiver 32

Software Licensing

Part Number Description Qty
L68816 Exadata Storage Server Software — Disk Drive Perpetual 72

Services

Part Number Description
B51555 Exadata Configuration Service (1 rack, up to 2 clusters, 16 VMs, 4 DB homes)
B74194 Standard System Installation Service, Site Audit: Engineered Systems Group II

Note: Part numbers listed here are for reference. All Exadata configurations are factory-integrated — individual components cannot be ordered separately. Contact your Oracle representative or authorized partner for current pricing, availability, and configuration validation.

Warranty, Service and Support

Quick Answer: Coverage runs through Oracle Premier Support for Systems — 24x7 engineer access, hardware replacement for servers, switches, PDUs and cabling, plus firmware and software updates. Deployment services cover cluster, VM and database-home configuration and a site audit, and Advanced Customer Services can add proactive monitoring for higher support tiers.

Oracle Exadata X11M includes Oracle Premier Support for Systems, providing 24x7 global access to Oracle support engineers, hardware replacement, and software updates. Key support components include:

  • Hardware warranty: Coverage for all rack components including servers, switches, PDUs, and cabling
  • Oracle Premier Support for Systems: Software updates, firmware patches, and technical support for the entire Exadata stack
  • Exadata Configuration Service: On-site configuration assistance including cluster setup, VM partitioning, and database home configuration
  • Standard System Installation Service: Site audit, installation planning, and on-site deployment supervision
  • ACS services: Oracle Advanced Customer Services available for enhanced support levels and proactive monitoring

For more information about Oracle Exadata X11M, including current pricing, configuration assistance, and procurement support, contact BENQUAN GLOBAL LIMITED.

Key Takeaway

Key Takeaway: X11M's 2.25 TB database servers carry the highest memory per node of any Exadata generation, which is what makes 40-plus database consolidation practical on one rack. The asymmetric 8+6 layout buys compute headroom where in-memory processing dominates. BENQUAN GLOBAL LIMITED supplies Oracle Exadata X11M database and storage servers with competitive pricing.

Frequently Asked Questions

Quick Answer: Four answers buyers look for: the 2.25TB per node ceiling is the highest of any Exadata generation, racks can be asymmetric so compute and storage scale independently, Smart Scan removes 40 to 70 percent of database CPU load on analytics, and the 8+6 layout targets estates of 40 or more databases.

What distinguishes the 2.25TB Exadata X11M configuration?

The highest memory capacity per node of any Exadata generation: up to 2.25TB of DDR5 per database server. The compute-optimized 8+6 configuration delivers 18TB of total database server memory for large-scale consolidation and heavy in-memory processing.

How flexible are X11M rack configurations?

Asymmetric by design — database server and storage server counts need not match, so racks can be optimized compute-heavy or storage-heavy. The 8+6 compute-optimized layout pairs eight 2.25TB database servers with six high-capacity storage servers.

How much CPU does Smart Scan offload save?

For analytics workloads, pushing SQL predicate filtering, column projection and joins down to the storage servers reduces database server CPU consumption by 40-70% while eliminating I/O bottlenecks — only relevant rows and columns cross the RoCE fabric.

What consolidation scale does this configuration target?

Enterprises consolidating 40 or more Oracle databases with significant in-memory processing requirements. Ordering is factory-integrated — rack, 2.25TB database servers, high-capacity storage servers and fabric on one order — backed by Oracle Premier Support for Systems with 24x7 access and hardware replacement.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents