Insights / Buying Guide

Exadata X11M 512GB: eight nodes at 4TB total, or 18TB if each node is 2.25TB?

Technical overview of Oracle Exadata Database Machine X11M with 512GB memory database servers — China market SKU — architecture, 8+6 configuration options, technical specifications, and ordering information

Quick Take

Quick Take: The 512GB tier is the cost-optimized entry into Exadata X11M: eight database servers give 4TB of memory in total, against 18TB if each node carried 2.25TB. That suits consolidating 20 to 40 databases with moderate in-memory demand, on the same rack and RoCE fabric as richer variants.

Product Overview

Quick Answer: Oracle's entry China-market X11M tier puts 512GB of DDR5 in each database node, which is why an eight-node rack totals 4TB rather than the 18TB a 2.25TB build reaches. Nodes ride dual 25GbE RoCE links to the storage tier and run Oracle Database 23ai with the full Exadata software stack.

Oracle Exadata Database Machine X11M is Oracle's latest generation engineered system, purpose-built for running Oracle Database. The 512GB memory per database server variant is the standard configuration for the China market, balancing memory capacity and cost efficiency for enterprise database consolidation. Each database server is equipped with 512GB DDR5 memory, Intel Xeon processors, and dual 25GbE RoCE connectivity to the storage fabric.

This China market SKU is factory-integrated with localized configuration and installation services, supporting Oracle Database 23ai with full Smart Scan offload, Hybrid Columnar Compression (HCC), Oracle Database In-Memory, and all Exadata software capabilities. The platform is ideal for mid-to-large scale database consolidation where 4TB of total database server memory in an 8-node configuration provides ample capacity for mixed OLTP and analytics workloads.

The 512GB configuration shares the same rack infrastructure, RoCE fabric, and storage server options as higher-memory Exadata X11M variants, providing a clear upgrade path to 2.25TB per node without rack or fabric replacement.

System Architecture

Quick Answer: One rack holds three tiers: Oracle Linux database nodes at 512GB DDR5 apiece, six high-capacity storage nodes whose NVMe flash cache fronts bulk disk, and a redundant Cisco 9336C RoCE fabric with a dedicated 9348 switch for out-of-band management. Smart Scan filtering at the storage tier cuts fabric traffic 40 to 70 percent.

Exadata X11M follows a scale-out architecture with three tiers within a single rack:

Database Servers

The database servers run Oracle Linux and host the Oracle Database software. Each database server in the 512GB configuration is equipped with 512GB DDR5 memory and Intel Xeon processors. In an 8-node configuration, the platform delivers 4TB of total database server memory for in-memory database processing and large SGA allocations. The 512GB configuration is well-suited for workloads requiring moderate in-memory capacity with cost-efficient scaling.

Storage Servers

Storage servers run Oracle Exadata Storage Server Software and handle all I/O operations. In the 8+6 configuration, 6 high-capacity (HC) storage servers provide HDD-based bulk storage accelerated by NVMe flash cache. Storage servers process SQL predicate filtering (Smart Scan) directly, returning only relevant rows to the database servers — reducing network I/O by 40-70% for analytics workloads.

RoCE Fabric

The internal network uses RDMA over Converged Ethernet (RoCE) with dual Cisco 9336C switches for redundancy, providing low-latency, high-bandwidth connectivity. A dedicated Cisco 9348 management switch handles out-of-band management. The RoCE fabric enables RDMA-based Smart Scan offload and eliminates TCP/IP overhead for database-to-storage communication.

Configuration Options

Quick Answer: Four layouts are published, all built from 512GB database nodes: a 2+3 entry rack at 1TB of database memory, a 4+4 balanced rack at 2TB, the compute-optimized 8+6 at 4TB that China deployments usually take, and an 8+8 variant that keeps 4TB while adding two storage nodes.

Exadata X11M with 512GB memory database servers is available in multiple configurations:

Configuration Database Servers Storage Servers Total Memory Typical Workload
2+3 Entry 2 x 512GB 3 HC 1 TB Small consolidation, departmental
4+4 Balanced 4 x 512GB 4 HC 2 TB Mid-range consolidation
8+6 Compute Optimized 8 x 512GB 6 HC 4 TB Large consolidation, mixed OLTP/DW
8+8 Balanced 8 x 512GB 8 HC 4 TB Balanced compute and storage

8+6 Configuration (Compute Optimized): 8 database servers with 512GB memory each (4TB total) paired with 6 high-capacity storage servers. This is the primary configuration for the China market, offering compute-optimized scaling for enterprises consolidating 20-40 databases with moderate in-memory processing requirements.

Technical Specifications

Quick Answer: Both node types run 5th Generation Intel Xeon Scalable processors behind two 25GbE RoCE ports, but memory differs: 512GB of DDR5 per database server against 256GB per storage server. Storage nodes pair NVMe flash cache with high-capacity disk, clients land on 10/25GbE SFP28, and each rack feeds from single-phase 22kVA PDUs.

Server Node Specifications

Component Database Server (512GB) Storage Server (HC)
Processor Intel Xeon Scalable 5th Gen Intel Xeon Scalable 5th Gen
Memory 512 GB DDR5 256 GB DDR5
Storage OS: 2x SSD (mirrored) HC: HDD + NVMe flash cache
Network 2x 25GbE RoCE + management 2x 25GbE RoCE + management
Software Oracle Linux + Oracle Database Exadata Storage Server Software

Networking Fabric

Component Specification
RoCE fabric switch Cisco 9336C v2 (2x for redundancy)
Management switch Cisco 9348 v2 (1x)
Fabric speed 25GbE per port, RoCE v2
Client access 10/25GbE SFP28
Cabling QSFP28 passive copper, 1m and 3m

Power and Physical

Specification Detail
PDU 1-phase high voltage 22 kVA, 2P3W-IP44 (APAC/EMEA)
Rack density Full rack with filler panels
Form factor Standard 19" rack, factory-integrated

Features and Benefits

Quick Answer: Six capabilities matter on this tier: Smart Scan offload, Hybrid Columnar Compression at 5 to 15 times, In-Memory column stores across the 4TB an eight-node rack provides, Storage Indexes that skip irrelevant blocks, a Columnar Cache held in flash, and China localization covering Chinese-language support and local power and cabling standards.

Smart Scan Offload

Storage servers process SQL predicate filtering, column projection, and joins directly — only relevant rows and columns traverse the fabric to database servers. This reduces database server CPU consumption and eliminates I/O bottlenecks for analytics workloads.

Hybrid Columnar Compression (HCC)

Delivers 5-15x compression ratios for warehouse and archive data, substantially reducing storage requirements and improving scan performance by reducing data volume read from disk.

Oracle Database In-Memory

With 4TB total database server memory in an 8-node configuration, the 512GB X11M can maintain significant working datasets entirely in memory using Oracle's In-Memory column store (IM column store) — enabling real-time analytics on the same data used by OLTP transactions.

Storage Indexes and Columnar Cache

Storage Indexes track min/max values for columns on each storage server, automatically skipping I/O for irrelevant data blocks. The Columnar Cache stores frequently accessed column data in flash memory, providing memory-speed access without consuming database server memory.

RoCE Fabric with RDMA

RDMA over Converged Ethernet eliminates TCP/IP overhead for database-to-storage communication, reducing latency for Smart Scan operations and enabling efficient parallel I/O across all storage servers.

China Market Localization

The 512GB China market SKU includes localized configuration services, Chinese-language documentation support, and factory integration optimized for China data center requirements — including compliance with China-specific power and cabling standards.

Ordering Information

Quick Answer: Exadata X11M with 512GB memory is ordered as a factory-integrated rack system. For an 8+6 China-market deployment, lock the model family, rack with two 512GB DB servers, HC storage servers, RoCE fabric, and Premier Support line items on the same RFQ before factory integration.

Exadata X11M with 512GB memory is ordered as a factory-integrated rack system. Below are the key part numbers for an 8+6 configuration for China market deployment:

Part Number Description Qty
7621526 Exadata Database Machine X11M: Model Family (base) 1
7627629 Exadata X11M Rack: two 512GB DB servers + Chassis, China SKU (factory install) 1
7621564 Exadata DB Server X11M 512GB + Network Fabric, China SKU (factory install) 6
7621570 Exadata Storage Server X11M High Capacity + Network Fabric, China SKU (factory install) 6
7606205 Cisco 9336C RoCE networking fabric switch v2 (factory install) 2
7606207 Cisco 9348 management switch v2 (factory install) 1
7605026 QSFP28 passive copper cable, 1m, 30 AWG 8
7605025 QSFP28 passive copper cable, 3m, 30 AWG 28
7621572 Exadata X11M: Oracle Linux software image for database server (factory install) 1
7621573 Exadata X11M: Oracle Linux software image for storage server (factory install) 1
7100874 1-phase high voltage 22kVA PDU, 2P3W-IP44 (APAC/EMEA) 1
7606295 Engineered Systems 1 RU filler panel v2 11
7604270 Oracle 10/25GbE Dual Rate SFP28 Short Range Transceiver 32

Software Licensing

Part Number Description Qty
L68816 Exadata Storage Server Software — Disk Drive Perpetual 72

Services

Part Number Description
B51555 Exadata Configuration Service (1 rack, up to 2 clusters, 16 VMs, 4 DB homes)
B74194 Standard System Installation Service, Site Audit: Engineered Systems Group II

Note: Part numbers listed here are China market SKUs. Some components may differ from international Exadata X11M configurations. All Exadata configurations are factory-integrated. Contact your Oracle representative or authorized partner for current pricing, availability, and configuration validation.

Warranty, Service and Support

Quick Answer: Premier Support for Systems covers the rack: 24x7 engineer access, replacement parts for servers, switches, PDUs and cabling, plus firmware and software updates across the stack. Deployment adds Exadata Configuration Service for cluster, VM and database-home setup, installation service with a site audit, and Chinese-language support through Oracle China.

Oracle Exadata X11M 512GB includes Oracle Premier Support for Systems, providing 24x7 global access to Oracle support engineers, hardware replacement, and software updates. Key support components include:

  • Hardware warranty: Coverage for all rack components including servers, switches, PDUs, and cabling
  • Oracle Premier Support for Systems: Software updates, firmware patches, and technical support for the entire Exadata stack
  • Exadata Configuration Service: On-site configuration assistance including cluster setup, VM partitioning, and database home configuration
  • Standard System Installation Service: Site audit, installation planning, and on-site deployment supervision
  • China-localized support: Chinese-language technical support and localized documentation available through Oracle China support center

For more information about Oracle Exadata X11M 512GB China market SKU, including current pricing, configuration assistance, and procurement support, contact BENQUAN GLOBAL LIMITED.

Key Takeaway

Key Takeaway: Take the 8+6 rack when consolidation is compute-heavy and the working set fits inside 4TB; move to 8+8 only when storage throughput rather than memory is the limit. A later jump to 2.25TB per node needs no fabric change. BENQUAN GLOBAL LIMITED supplies Oracle Exadata X11M systems with competitive pricing.

Frequently Asked Questions

Quick Answer: Four questions matter here: the 512GB tier suits estates consolidating 20 to 40 databases, the standard 8+6 rack delivers 4TB of database memory against six storage nodes, Smart Scan offload keeps filtering work in the storage tier, and the RFQ must carry rack, servers, fabric and support as separate lines.

Who is the 512GB Exadata X11M configuration for?

It is the standard, cost-optimized entry point for the X11M generation in the China market — organizations consolidating 20-40 Oracle databases with mixed OLTP and analytics workloads that want Exadata engineering without maximum-memory investment.

What does the 8+6 configuration provide?

Eight database servers at 512GB DDR5 each — 4TB of total database server memory — plus six high-capacity storage servers with HDD and NVMe flash cache, all on Intel Xeon Scalable 5th Generation processors with a 2x 25GbE RoCE fabric.

How does Exadata offload work in this configuration?

Storage servers execute SQL predicate filtering, column projection and joins directly, so only relevant rows and columns traverse the fabric to database servers — reducing database CPU consumption and removing I/O bottlenecks for analytics — while Hybrid Columnar Compression yields 5-15x ratios on warehouse data.

What should the RFQ include?

Lock everything before factory integration on a single RFQ: the X11M model family, the rack with 512GB database servers, high-capacity storage server line items, the RoCE fabric, and Oracle Premier Support for Systems covering 24x7 support, hardware replacement, and software and firmware updates.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents