Insights / Buying Guide

Exadata X11M 1.5TB: is the rack 2+2 at 3TB of database memory, or 8+6 at 12TB?

Technical overview of Oracle Exadata Database Machine X11M with 1.5TB memory database servers — 1.5TB memory-tier worked example — architecture, 4+3 configuration, technical specifications, and ordering information

Quick Take

Quick Take: Four rack layouts share the 1.5TB memory tier, and the one you quote changes both database memory and disk depth: 2+2 at 3TB, 4+3 at 6TB, storage-heavy 4+6, and 8+6 at 12TB. Everything ships factory-integrated, so the BOM is line items, not loose parts.

Product Overview

Quick Answer: The 1.5TB X11M is Oracle X11M middle memory tier (1.5TB worked example), sitting above the 512GB entry SKU and below the 2.25TB flagship. Every database node pairs 1.5TB of DDR5 with 5th Generation Intel Xeon Scalable silicon, so a four-node rack holds 6TB for In-Memory column stores, oversized SGAs and consolidated estates.

Oracle Exadata Database Machine X11M with 1.5TB memory per database server represents the mid-range memory configuration as a 1.5TB memory-tier worked example, positioned between the 512GB entry-level and the 2.25TB high-end SKU. Each database server is equipped with 1.5TB DDR5 memory and Intel Xeon Scalable 5th Generation processors, providing substantial capacity for Oracle Database In-Memory, large SGAs, and consolidated database workloads.

In a 4+3 configuration, the platform delivers 6TB of total database server memory — sufficient for maintaining large working datasets entirely in memory while supporting mixed OLTP and analytics workloads. The platform supports all Exadata X11M software capabilities including Oracle Database 23ai, Smart Scan offload, Hybrid Columnar Compression, and Storage Indexes.

The 1.5TB memory-tier SKU is factory-integrated with localized configuration services and shares the same rack infrastructure, RoCE fabric, and storage server ecosystem as other Exadata X11M memory tiers, enabling future expansion without infrastructure replacement.

System Architecture

Quick Answer: Three tiers share one rack: Oracle Linux database nodes carrying 1.5TB of DDR5 each, high-capacity storage nodes that mix spinning disk with NVMe flash cache, and a redundant pair of Cisco 9336C v2 switches carrying RDMA traffic at 25GbE per port, with a separate 9348 switch for out-of-band management.

Exadata X11M follows a scale-out architecture with three tiers within a single rack:

Database Servers

Each database server runs Oracle Linux and hosts the Oracle Database software with 1.5TB DDR5 memory. In a 4-node configuration, the platform provides 6TB of total memory — enabling large-scale Oracle Database In-Memory deployments, consolidated database estates, and mixed-workload environments. Each server features dual-port 25GbE RoCE connectivity to the storage fabric.

Storage Servers

Storage servers run Oracle Exadata Storage Server Software with 3 high-capacity (HC) units providing HDD-based bulk storage accelerated by NVMe flash cache. The storage servers handle Smart Scan offload — processing SQL predicate filtering and returning only relevant rows to database servers — which reduces database server CPU consumption by 40-70% for analytics workloads.

RoCE Fabric

Dual Cisco 9336C RoCE switches provide redundant, low-latency connectivity between database and storage servers. A dedicated Cisco 9348 management switch handles out-of-band management. RDMA over Converged Ethernet eliminates TCP/IP overhead, enabling efficient parallel I/O across all storage servers.

Configuration Options

Quick Answer: Four rack layouts ship in this 1.5TB memory-tier SKU: a 2+2 starter at 3TB of database memory, the balanced 4+3 at 6TB, a storage-heavy 4+6 that keeps 6TB but doubles the disk tier, and an 8+6 compute build reaching 12TB for large consolidation or in-memory-heavy estates.

The Exadata X11M 1.5TB memory-tier SKU is available in several configurations. The 4+3 configuration balances compute and storage capacity for mid-range deployments.

Configuration Database Servers Storage Servers Total Memory Typical Workload
2+2 Starter 2 x 1.5TB 2 HC 3 TB Small consolidation, departmental
4+3 Balanced 4 x 1.5TB 3 HC 6 TB Mid-range consolidation, mixed OLTP/IM
4+6 Storage Heavy 4 x 1.5TB 6 HC 6 TB Data warehouse, analytics-heavy
8+6 Compute Optimized 8 x 1.5TB 6 HC 12 TB Large-scale consolidation, in-memory heavy

4+3 Configuration (Balanced): 4 database servers with 1.5TB memory each (6TB total) paired with 3 high-capacity storage servers. This configuration targets mid-range deployments where 6TB of database server memory provides substantial headroom for Oracle Database In-Memory, while 3 HC storage servers deliver adequate backup capacity and Smart Scan throughput for mixed workloads.

Technical Specifications

Quick Answer: Database and storage nodes share 5th Generation Intel Xeon Scalable processors and dual 25GbE RoCE uplinks, but memory splits 1.5TB of DDR5 per database server against 256GB per storage node. High-capacity storage fronts disk with NVMe flash cache, clients attach over 10/25GbE SFP28, and power arrives through single-phase 22kVA PDUs.

Server Node Specifications

Component Database Server (1.5TB) Storage Server (HC)
Processor Intel Xeon Scalable 5th Gen Intel Xeon Scalable 5th Gen
Memory 1.5 TB DDR5 256 GB DDR5
Storage OS: 2x SSD (mirrored) HC: HDD + NVMe flash cache
Network 2x 25GbE RoCE + management 2x 25GbE RoCE + management
Software Oracle Linux + Oracle Database Exadata Storage Server Software

Networking Fabric

Component Specification
RoCE fabric switch Cisco 9336C v2 (2x for redundancy)
Management switch Cisco 9348 v2 (1x)
Fabric speed 25GbE per port, RoCE v2
Client access 10/25GbE SFP28
Cabling QSFP28 passive copper, 1m and 3m

Power and Physical

Specification Detail
PDU 1-phase high voltage 22 kVA, 2P3W-IP44 (APAC/EMEA)
Rack density Full rack with filler panels
Form factor Standard 19" rack, factory-integrated

Features and Benefits

Quick Answer: Smart Scan pushes predicate filtering, column projection and joins down to the storage tier, cutting database CPU load by 40 to 70 percent on analytics queries. Hybrid Columnar Compression shrinks warehouse data 5 to 15 times, Storage Indexes skip irrelevant blocks entirely, and a four-node rack's 6TB of memory holds large In-Memory column stores.

Smart Scan Offload

Storage servers process SQL predicate filtering, column projection, and joins directly — only relevant rows and columns traverse the fabric to database servers. This eliminates I/O bottlenecks and frees database server CPU cycles for transaction processing.

Hybrid Columnar Compression (HCC)

Delivers 5-15x compression ratios for warehouse and archive data, substantially reducing storage requirements and improving scan performance by reducing data volume read from disk.

Oracle Database In-Memory

With 6TB total database server memory in a 4-node configuration, the 1.5TB X11M can maintain large in-memory column stores for real-time analytics, running concurrently with OLTP transactions on the same database without separate copies or ETL pipelines.

Storage Indexes and Columnar Cache

Storage Indexes track min/max values for columns on each storage server, automatically skipping I/O for irrelevant data blocks. The Columnar Cache provides memory-speed access to frequently accessed column data without consuming database server memory.

Flexible Scaling

The 1.5TB configuration shares the same rack and fabric infrastructure as the 512GB and 2.25TB variants, allowing in-rack upgrades to higher memory capacity without replacing the base rack, switches, or storage servers.

Ordering Information

Quick Answer: Every rack ships factory-integrated, so a 4+3 1.5TB build quotes as line items rather than loose parts: the base model family, rack and database-server SKUs carrying 1.5TB nodes, high-capacity storage servers, redundant 9336C fabric switches, 44 QSFP28 copper cables, 72 perpetual Storage Server Software licenses, and configuration plus installation services.

Exadata X11M with 1.5TB memory is ordered as a factory-integrated rack system. Below are the key part numbers for a 4+3 1.5TB memory-tier configuration:

Part Number Description Qty
7621526 Exadata Database Machine X11M: Model Family (base) 1
7627628 Exadata X11M Rack: two 1.5TB DB servers + Chassis, 1.5TB memory-tier SKU (factory install) 2
7621565 Exadata DB Server X11M 1.5TB + Network Fabric, 1.5TB memory-tier SKU (factory install) 2
7621570 Exadata Storage Server X11M High Capacity + Network Fabric, 1.5TB memory-tier SKU (factory install) 4
7606205 Cisco 9336C RoCE networking fabric switch v2 (factory install) 2
7606207 Cisco 9348 management switch v2 (factory install) 2
7605025 QSFP28 passive copper cable, 3m, 30 AWG 28
7605026 QSFP28 passive copper cable, 1m, 30 AWG 16
7621572 Exadata X11M: Oracle Linux software image for database server (factory install) 2
7621573 Exadata X11M: Oracle Linux software image for storage server (factory install) 2
7100874 1-phase high voltage 22kVA PDU, 2P3W-IP44 (APAC/EMEA) 2
7606295 Engineered Systems 1 RU filler panel v2 50
7604270 Oracle 10/25GbE Dual Rate SFP28 Short Range Transceiver 32

Software Licensing

Part Number Description Qty
L68816 Exadata Storage Server Software — Disk Drive Perpetual 72

Services

Part Number Description
B51555 Exadata Configuration Service (1 rack, up to 2 clusters, 16 VMs, 4 DB homes)
B74194 Standard System Installation Service, Site Audit: Engineered Systems Group II

Note: Part numbers listed here are 1.5TB memory-tier SKUs pending confirmation for the 1.5TB memory configuration. All Exadata configurations are factory-integrated. Contact your Oracle representative or authorized partner for current pricing, availability, and configuration validation.

Warranty, Service and Support

Quick Answer: Coverage comes as Oracle Premier Support for Systems: round-the-clock engineer access, hardware replacement across servers, switches, PDUs and cabling, plus firmware and software updates for the whole stack. Two service line items handle deployment — Exadata Configuration Service for clusters, VMs and database homes, and installation service including the site audit.

Oracle Exadata X11M 1.5TB includes Oracle Premier Support for Systems, providing 24x7 global access to Oracle support engineers, hardware replacement, and software updates. Key support components include:

  • Hardware warranty: Coverage for all rack components including servers, switches, PDUs, and cabling
  • Oracle Premier Support for Systems: Software updates, firmware patches, and technical support for the entire Exadata stack
  • Exadata Configuration Service: On-site configuration assistance including cluster setup, VM partitioning, and database home configuration
  • Standard System Installation Service: Site audit, installation planning, and on-site deployment supervision
  • Premier Support: Oracle Premier Support and ACS hours must be frozen on the worldwide RFQ support center

For more information about Oracle Exadata X11M 1.5TB memory-tier SKU, including current pricing, configuration assistance, and procurement support, contact BENQUAN GLOBAL LIMITED.

Key Takeaway

Key Takeaway: Quote the 4+3 unless measurements say otherwise: it carries 6TB of database memory without paying for the 2.25TB tier, and the 4+6 exists when disk capacity, not memory, is the constraint. BENQUAN GLOBAL LIMITED supplies Oracle Exadata X11M racks with competitive pricing and worldwide shipping.

Frequently Asked Questions

Quick Answer: Buyers usually ask four things: where 1.5TB sits (between the 512GB and 2.25TB tiers), which layout to quote (the balanced 4+3 at 6TB), which platform features carry over (Smart Scan offload and Hybrid Columnar Compression), and how it ships (factory-integrated, under Premier Support for Systems).

Where does the 1.5TB Exadata X11M sit in the memory lineup?

In the middle: between the 512GB entry configuration and the 2.25TB high-end SKU. Each database server carries 1.5TB of DDR5 memory on Intel Xeon Scalable 5th Generation processors, targeting Oracle Database In-Memory and large-SGA consolidation without high-end pricing.

What is the recommended 1.5TB configuration?

The balanced 4+3: four database servers at 1.5TB each (6TB total memory) paired with three high-capacity storage servers, connected over a 2x 25GbE RoCE fabric — sized for mid-range deployments that need substantial in-memory capacity.

What performance features carry over from the Exadata platform?

Smart Scan offload — storage servers execute SQL predicate filtering, column projection and joins so only relevant rows and columns cross the fabric — plus Hybrid Columnar Compression delivering 5-15x ratios on warehouse and archive data, reducing both storage footprint and scan times.

How is the system ordered and supported?

As a factory-integrated rack: lock the X11M model family, the rack SKU with 1.5TB database servers, high-capacity storage servers and the RoCE fabric on one RFQ. Oracle Premier Support for Systems provides 24x7 engineer access, hardware replacement, and firmware and software updates.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents