Insights / Buying Guide

LPO vs CPO: does a 1.6T module spend 8 to 12 watts on the DSP before the switch ASIC starts?

How four optical module architectures — LPO, LRO, NPO, and CPO — tackle the power, signal integrity, and density challenges of high-speed data center interconnects, and what their adoption means for the optical supply chain

Quick Take

Quick Take: Four optical architectures now compete for the same switch port: pluggable with DSP, LPO, LRO, and package-integrated NPO or CPO. The separator is power. A 1.6T module spends 8 to 12 watts on its DSP alone, and a 64-port switch burns over 1.6 kW on optics before the ASIC powers up.

1. Why Optical Module Architecture Is Evolving

Quick Answer: Power, not bandwidth, forces the change. A 1.6T pluggable burns 25 to 30 watts, of which the DSP alone takes 8 to 12, so a 64-port switch spends more than 1.6 kW on optics before its ASIC draws anything. Dense AI cluster designs cannot absorb that overhead.

Quick Summary: As optical module line rates scale from 800G to 1.6T and beyond, DSP power consumption, driver currents, and thermal dissipation are pushing the limits of pluggable form factors. Four architectural approaches are emerging — LPO (Linear Pluggable Optics, DSP-less at module), LRO (Linear Receiver Optics, partial retiming), NPO (Near Package Optics, optical engine near switch ASIC), and CPO (Co-Packaged Optics, optics co-packaged with switch ASIC). Each trades off power savings against system complexity, link budget margin, and ecosystem readiness. This article analyzes the technology trade-offs, product timelines, and value chain implications across the optical interconnect industry.

In high-density AI cluster deployments, each switch row hosts dozens of ports. The cumulative power of all optical modules directly impacts data center power distribution and cooling system design. At 1.6T per module, DSP alone can consume 8-12W, with total module power exceeding 25-30W. When a switch supports 64 such ports, the optical interconnect power exceeds 1.6 kW per switch — before accounting for the switching ASIC itself. This is the fundamental driver behind the search for lower-power optical interconnect architectures.

2. LPO and LRO: DSP Reduction Strategies

Quick Answer: Both strip DSP silicon out of the module to save power. LPO goes furthest, keeping only a linear driver and transimpedance amplifier and leaning on host SerDes for compensation, which cuts module power 30 to 50 percent but tightens the link budget. LRO keeps receive-side retiming, buying back margin and multi-vendor interoperability.

2.1 LPO — Linear Pluggable Optics

LPO removes the DSP from the module entirely, relying on the host system's SerDes and link design to perform signal compensation. The module contains only a linear driver and TIA (transimpedance amplifier), without clock data recovery (CDR) or retiming logic. This can reduce per-module power by 30-50% compared to DSP-based designs.

The trade-off is tighter link budget requirements and reduced interoperability. System-level co-design between the switch ASIC vendor and the module supplier becomes critical. LPO performance varies significantly with cable length, PCB trace quality, and connector insertion loss, making it more suitable for controlled environment deployments within a single rack or row.

2.2 LRO — Linear Receiver Optics

LRO is a middle-ground approach that retains partial retiming or receiver-side equalization. The transmitter side removes the DSP, while the receiver incorporates limited DSP or CDR functionality. This provides better link margin than full LPO while still achieving meaningful power savings versus traditional DSP-based modules.

LRO addresses the primary weakness of LPO — link budget — by cleaning up the received signal before it reaches the host. Industry consensus suggests LRO will find earlier adoption in multi-vendor environments where full LPO interoperability is harder to guarantee.

2.3 Adoption Outlook

Both LPO and LRO require closer collaboration between switch ASIC vendors (Broadcom, Marvell, NVIDIA) and optical module manufacturers. Their deployment is expected to begin in targeted data center environments — specific distances, specific switch platforms, and controlled link conditions — before broader adoption. Customer validation cycles and real-world field data will determine how quickly these approaches expand beyond initial deployments.

3. NPO and CPO: Bringing Optics Closer to the Switch ASIC

Quick Answer: Both move the optics toward the switch die. NPO mounts a separately assembled optical engine on or beside the ASIC substrate, shortening high-speed traces while keeping some serviceability. CPO puts the engine inside the ASIC package and removes the PCB from the high-speed path, at the cost of package-level rework when optics fail.

3.1 NPO — Near Package Optics

NPO places the optical engine on the same substrate or very near the switch ASIC package but does not integrate it into the same package. The optical engine, silicon photonics die, and external laser source are assembled as a separate component adjacent to the switch ASIC. This shortens the high-speed electrical trace distance on the PCB while maintaining some degree of modularity.

NPO represents an intermediate step between pluggable modules and full co-packaging. It reduces PCB trace losses and improves signal integrity without requiring the full system redesign that CPO demands.

3.2 CPO — Co-Packaged Optics

CPO integrates the optical engine directly into the same package as the switch ASIC, eliminating the PCB as a medium for high-speed electrical signals. The optical engine, silicon photonic integrated circuit, fiber array, and external laser source are all assembled into a single package with the switch die.

This is the most architecturally aggressive approach. It requires redesign of:

  • Optical engine and silicon photonics chip integration
  • External continuous-wave (CW) laser sourcing and fiber attachment
  • Thermal management for co-packaged optical and electronic components
  • Package-level testing and rework processes
  • Field service and repair (failed optics require ASIC package rework)

3.3 Key Product Announcements

NVIDIA Spectrum-X Photonics: Delivers up to 409.6 Tb/s aggregate bandwidth for Ethernet fabric, planned for H2 2026 availability. Quantum-X Photonics targets InfiniBand platforms.

Broadcom: Third-generation CPO platform advancing to 200 Gb/s per lane, supporting scale-up domains exceeding 512 GPU nodes.

Marvell: 1.6T PAM4 DSP with 8-channel 200 Gb/s electrical interface, designed for next-generation CPO and pluggable architectures.

These announcements mark the transition of CPO from research labs into concrete system product roadmaps.

4. Industry Value Chain Reallocation

Quick Answer: Value moves from finished modules to components. Where a supplier once shipped a complete OSFP or QSFP-DD part, CPO splits the revenue across optical engines, external continuous-wave lasers, fiber arrays, connectors, and packaging. Winning that work demands silicon photonics, precision optical coupling, wafer-level test, and joint link design with the ASIC vendor.

In the pluggable module era, the value chain is straightforward: optical module manufacturers deliver standardized OSFP or QSFP-DD form factors. In the CPO era, the module's value is disaggregated into optical engines, external CW lasers, fiber arrays, connectors, and packaging. This creates opportunities for precision optics and photonics component suppliers, but requires module manufacturers to develop new capabilities in silicon photonics, advanced packaging, and system-level co-design.

Technology System Objective Key Capabilities Required
LPO / LRO Reduce DSP power, strengthen link and system co-design Linear driver design, host SerDes integration, system-level link budget analysis
NPO Shorten electrical path, optical engine near package Silicon photonics, precision optical coupling, fiber array assembly
CPO Co-package optics with switch ASIC for density and efficiency Advanced packaging, co-designed thermal, wafer-level testing, rework
External CW Laser Provide high-power continuous-wave light source for SiPh/CPO High-power laser diode manufacturing, wavelength stability, fiber coupling

5. CPO Industrialization Timeline

Quick Answer: CPO moves through three gates: prototypes proving coupling efficiency and thermal stability, customer qualification with small-volume shipments judged on yield and field reliability, then volume deployment. Most suppliers sit between the first two gates today, with announced platforms targeting late 2026 into 2027 and broader delivery across 2027 and 2028.

Three Phases

CPO industrialization follows a predictable three-phase pattern:

  • Phase 1 — Prototypes and Demonstrations: Technology feasibility is proven. Metrics: optical coupling efficiency, thermal stability, and reliability data.
  • Phase 2 — Customer Qualification and Early Production: System validation begins with lead customers. Small-volume shipments. Metrics: yield, cost, and field reliability.
  • Phase 3 — Volume Deployment: Financial impact becomes material. Standardized supply chain. Metrics: production volume and revenue contribution.

Current status for CPO across the industry is between Phase 1 and Phase 2 for most suppliers, with product announcements targeting H2 2026 to 2027 for initial deployments.

Concurrent Technology Paths

From 2026 to 2027, three technology paths will coexist:

  • Pluggable 1.6T — continues as the primary volume driver, leveraging existing manufacturing infrastructure
  • LPO / LRO — first to enter targeted deployment in controlled environments
  • CPO — gradually introduced at leading system platforms, starting with highest-density switch nodes

The revenue realization timeline differs for each path. Pluggable 1.6T revenue is already material. LPO/LRO revenue begins in targeted deployments during 2026-2027. CPO system-level revenue becomes visible as head platforms move from qualification to initial deployment.

Timeline Summary: 2026 pluggable 1.6T provides baseline revenue. LPO/LRO enters targeted environments. CPO enters product qualification. By 2027-2028, CPO begins volume delivery at leading switch platforms, and 3.2T architecture decisions will determine whether CPO becomes the dominant approach for next-generation clusters.

6. How CPO Changes Order Patterns

Quick Answer: Purchasing stops being a catalogue exercise. Instead of a form factor and a line rate delivered as a swappable unit, buyers commit to custom optical engines matched to one switch ASIC, narrow-linewidth laser modules, precision-aligned fiber assemblies, and wafer-level test services. Expect multi-quarter joint qualification before any volume commitment.

In the pluggable module era, orders are standardized: specific form factor (e.g., OSFP), specific data rate, delivered as a complete, swappable unit. CPO changes this fundamentally. Orders shift to:

  • Custom optical engines — designed for specific switch ASICs and system architectures
  • External CW laser modules — high-power, narrow-linewidth sources for silicon photonics
  • Fiber array and connector assemblies — precision-aligned for package-level integration
  • Packaging and test services — including wafer-level photonic testing and burn-in

This means module manufacturers must extend capabilities to optical engine design, silicon photonics assembly, and system-level qualification. Component suppliers in precision optics, fiber arrays, and laser diodes gain more direct engagement with system customers. The qualification cycle lengthens — multi-quarter joint design and validation become standard before volume commitments.

7. Conclusion

Quick Answer: These four architectures coexist rather than compete, each sitting at a different point on the trade-off between power, link margin, modularity, and density. Plan for pluggable 1.6T to carry mainstream volume, LPO and LRO to fill power-constrained rows, and CPO to take the densest switch nodes as 2027 and 2028 volume arrives.

LPO, LRO, NPO, and CPO are not competing technologies serving the same end. They represent different points on a spectrum of architectural trade-offs: power vs. link margin, modularity vs. density, ecosystem readiness vs. performance ceiling. The industry is likely to sustain multiple approaches simultaneously, with CPO serving the highest-density switch nodes, LPO/LRO filling specific power-optimized deployments, and pluggable 1.6T carrying mainstream volume.

The value chain shift — from complete modules to disaggregated optical components — rewards companies that can demonstrate precision optical manufacturing, silicon photonics integration capability, and system-level co-design expertise. For data center operators evaluating infrastructure choices, the key observation is that CPO is no longer a laboratory concept. Product announcements and qualification timelines from leading switch ASIC vendors demonstrate that CPO has entered the industrialization phase, even as pluggable 1.6T continues to drive current-generation deployments.

Note: This analysis is based on publicly available company announcements, annual and quarterly financial reports, and industry publications. It provides an industry-technology perspective and should not be construed as investment advice. Market adoption timelines and revenue contributions depend on factors including manufacturing yield improvements, customer qualification cycles, and data center infrastructure upgrade schedules.

Frequently Asked Questions

Quick Answer: Power is the forcing function: a 1.6T DSP burns 8-12W inside a 25-30W module budget. LPO drops the DSP and needs host SerDes co-design, LRO keeps receive-side retiming for link margin, and NPO or CPO moves optics next to or inside the ASIC package as volume arrives in 2027-2028.

What is LPO vs LRO vs NPO vs CPO?

Four optics architectures for cutting 1.6T module watts. LPO drops the DSP and needs host SerDes; LRO keeps receive retiming for margin; NPO sits the engine beside the switch ASIC; CPO puts optics in the ASIC package. They coexist through 2027–2028 rather than one replacing pluggables.

Why is the industry moving beyond DSP-based pluggable optics?

Power. At 1.6T per module the DSP alone consumes 8-12W of a 25-30W total budget; a 64-port switch carries over 1.6kW in optical modules before the ASIC. DSP power, driver currents and laser heating collectively exceed what dense AI cluster switch designs can accommodate.

What is the difference between LPO and LRO?

LPO removes the DSP entirely — the module keeps only a linear driver and TIA, relying on host SerDes and link design for signal compensation, cutting per-module power by 30-50%. LRO retains partial retiming on the receive side, trading some of that saving for link margin and interoperability.

How do NPO and CPO differ?

NPO places the optical engine on the same substrate or immediately adjacent to the switch ASIC as a separately assembled component, shortening high-speed electrical traces while preserving some serviceability. CPO integrates optics into the same package as the ASIC, maximizing density and power efficiency at the cost of modularity.

When does CPO reach volume, and does it replace pluggables?

Product qualification is underway in 2026, with volume delivery on leading switch platforms expected in 2027-2028; 3.2T architecture decisions will determine whether CPO dominates. The approaches coexist: CPO serves the highest-density switch nodes while pluggables, LPO and LRO persist in other environments — plan orders accordingly.

Key Takeaway

Key Takeaway: Decide the architecture before the switch, not after. LPO forces host SerDes co-design; NPO and CPO turn any optics failure into package-level rework and add separate laser sourcing to the BOM. Pluggable 1.6T stays the safe default for mainstream rows. BENQUAN GLOBAL LIMITED supplies 800G and 1.6T optical transceivers with competitive pricing.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents