Quick Take
Quick Take: NVIDIA RTX PRO 6000 Blackwell is three Editions only: Server, Workstation, and Max-Q Workstation. Put each Edition on its own RFQ line. Server bandwidth is 1597 GB/s; Workstation and Max-Q are 1792 GB/s. Do not mix H200 PCIe, RTX 6000 Ada, or RTX 6000D on that line. Labs prefer one Workstation or two to four Max-Q cards.
Family Definition and Naming Traps
Quick Answer: PRO 6000 on an RFQ is the NVIDIA RTX PRO 6000 Blackwell family: three Editions, 96 GB GDDR7 ECC, PCIe Gen 5 x16, four DisplayPort 2.1, and no NVLink. An OEM partner MPN is the same GPU, not a fourth SKU. RTX 6000 Ada, RTX 6000D, H200 PCIe, and GeForce 5090 stay on separate lines.
Definition: The NVIDIA RTX PRO 6000 Blackwell family is a three-Edition professional GPU line. Shared silicon across Server, Workstation, and Max-Q Workstation is 96 GB GDDR7 ECC, PCIe Gen 5 x16, and 4 DisplayPort 2.1. There is no NVLink. Multi-GPU is PCIe only. Do not write an 8-card PRO 6000 bill of materials as B300, HGX, or NVL.
Partner SKUs from PNY, Lenovo, Dell, or HP are the same GPU under a partner MPN. Cite PNY VCNRTXPRO6000BQ-PB only as proof that the partner code must match the Edition. Do not treat a channel sticker as a quotation. Shorthand PRO6000 is not a locked SKU until the Edition name and a part number sit on the line.
Names that are not an Edition of this family:
- RTX 6000 Ada — previous Ada generation.
- RTX 6000D — China-channel name with no official family row and no official datasheet.
- H200 PCIe / H200 NVL — Hopper datacenter GPU; different SKU and chassis certification.
- Dell SN6000 — a storage appliance name, not this GPU.
- GeForce RTX 5090 — consumer board, not RTX PRO.
China is a dual-track RFQ lock (96 GB family listed plus the 6000D channel name), not a fourth Edition. Do not invent a China Edition row on the spec table.
Official Three-Edition Table
Quick Answer: Official family rows are Server, Workstation, and Max-Q Workstation. Server board power is 400 to 600 W configurable with 1597 GB/s. Workstation is 600 W at 1792 GB/s. Max-Q is 300 W at 1792 GB/s. Do not invent a China Edition row or copy 1.79 TB/s onto Server.
The bandwidth trap is the one that breaks otherwise clean bills of materials. Server Edition is 1597 GB/s. Workstation and Max-Q are 1792 GB/s. An older selection guide that prints 1.79 TB/s on Server Edition is mixing the desktop cards onto the datacenter row. Keep the three rows below as the only official family columns.
| Item | Server Edition | Workstation Edition | Max-Q Workstation |
|---|---|---|---|
| Memory | 96 GB GDDR7 ECC | 96 GB GDDR7 ECC | 96 GB GDDR7 ECC |
| Memory bandwidth | 1597 GB/s | 1792 GB/s | 1792 GB/s |
| Board power | 400–600 W configurable | 600 W | 300 W |
| Form / cooling | Air: dual-slot FHFL passive. Liquid: single-slot FHXL | 5.4 in × 12 in dual-slot; Double Flow Through | 4.4 in × 10.5 in dual-slot; active blower |
| Family table size | 4.4 in × 10.5 in dual-slot / passive (air) | See form row | See form row |
| Compute class | 24,064 CUDA; 188× 4th-gen RT; FP4 4 PFLOPS | Same class 96 GB | Same class 96 GB |
| Aux power | CEM5; card does not ship the cable | 1× PCIe CEM5 16-pin | Active board in a workstation PSU plan |
| Official density note | RTX PRO Server 2 / 4 / 8 GPU | Desktop 1 GPU starting point | Up to 4 GPU in a workstation |
| NVLink | None — PCIe only | None — PCIe only | None — PCIe only |
Do not invent NVIDIA or PNY 900-* codes beyond the two part numbers named on this page. Soft channel corridors are industry estimate / pending confirmation and are not printed here.
Server Edition — Air FHFL versus Liquid FHXL
Quick Answer: Server Edition is one GPU with two thermal SKUs. Air is dual-slot FHFL passive and needs chassis airflow plus a system-specific CEM5 cable. Liquid is single-slot FHXL and needs an MGX 6U loop, not a desktop motherboard. Lock air versus liquid on the RFQ before quantity.
Same Edition, two thermal SKUs. The RFQ must lock cooling before it locks quantity. Air is Dual-Slot FHFL passive. The chassis must blow air through the card. The card does not include the auxiliary power cable. Lenovo LP2263 states that a field install needs the system-specific cable. Liquid is Single-Slot FHXL. It needs an MGX 6U liquid loop. It is not a desktop motherboard and not a random 2U white box.
NVIDIA P/N used on Lenovo LP2263 (updated 2026-07-28): 900-2G153-2700-030. Lenovo option 4X67B09287 / feature CBK8. Description: 96 GB PCIe Gen5 Passive. Lenovo text: Controlled, which means the GPU is not offered in certain markets, as determined by the US Government. Slot-power cap feature CHWT equals 450 W when a 2U chassis cannot take 600 W times N. Do not invent other NVIDIA 900-2G153-* variants.
- Air lock: Dual-Slot FHFL passive + chassis airflow + system CEM5 cable + GPU count.
- Liquid lock: Single-Slot FHXL + MGX 6U loop + GPU count. Not a tower board.
- Power lock: 400–600 W configurable; write CHWT 450 W when the 2U envelope requires it.
RTX PRO Server Systems — OEM and Certified ODM
Quick Answer: Buy Server Edition as an NVIDIA RTX PRO Server from a certified OEM or ODM chassis, not as HGX or B300 NVL. Five shipping OEMs are Cisco, Dell, HPE, Lenovo, and Supermicro. Lock chassis part number, GPU 900-2G153-2700-030 or OEM equivalent, count 2, 4, or 8, and air or liquid on one line-set.
Category name: NVIDIA RTX PRO Server (SIGGRAPH / COMPUTEX). Not HGX. Not B300 NVL. Official density language is 2 / 4 / 8 GPUs. 4U eight-GPU systems are orderable. Mainstream 2U dual-GPU arrives later. Liquid FHXL is MGX 6U, separate from air-cooled 2U / 4U / 5U. When the same chassis is also certified for H200 NVL or L40S, the GPU row must be a separate line. Do not default to 8 GPUs. Do not put Workstation or Max-Q cards on an RTX PRO Server BOM. A partner name is not a certified SKU.
Five OEM heroes (retrieved 2026-08-28)
| OEM | Systems | Cap / notes |
|---|---|---|
| Lenovo ThinkSystem | SR675 V3 / SR675i V3 (3U, up to 8, Hybrid AI 285); SR650a V4 / SR650i V4 (2U: 600 W full power up to 2; CHWT 450 W up to 4) | GPU option 4X67B09287 / CBK8 = NVIDIA 900-2G153-2700-030, Controlled. SR650 V4 (no “a”) and SR680a B200 line do not support this card. |
| Dell PowerEdge | XE7745 / XE7740 (certified, about 8 GPU; may also certify H200 NVL — lock the GPU line); R7725 (2U, dual GPU); also R770 / R7715 | Do not assume every PowerEdge takes this card. |
| HPE ProLiant | DL380a Gen12 (hero); DL385 Gen11; DL345 Gen12; edge e930t | Hitachi HA8000V / DL380a Gen12 is the same platform rebadge — align to the HPE row. |
| Cisco UCS | C240 M8; C845A M8 AI; blades X210c M7 / M8 | Lock the GPU line if the chassis also takes other accelerators. |
| Supermicro | SYS-522GA-NRT (5U / 8); SYS-422GL-NR (4U / 8); AS-5126GS-TNRT2 (5U / 8); also SYS-521GE-TNRT, SYS-221GE-NR, SYS-212GB-FNR | See the RTX PRO 6000 AI Factory datasheet. Confirm the catalog row before PO. |
Greater-China factory / ODM — named is not certified
NVIDIA SIGGRAPH / COMPUTEX named Advantech, AAEON, Aivres, ASRock Rack, ASUS, Compal, Foxconn / Ingrasys, GIGABYTE, Inventec, MiTAC, MSI, Pegatron, QCT, Wistron, and Wiwynn. Named is not a certified orderable SKU. The Certified Systems directory already lists RTX PRO 6000 Blackwell Server Edition as of 2026-08-28:
- Leadtek WinFast GS5850T / GS5852T / GS5855T
- ASUS ESC8000A-E13P
- GIGABYTE G494-ZB4-AAP2
- QCT QuantaGrid D75E-4U
- Inventec P5000AG7 (news also mentions P4000 — do not treat P4000 as certified unless the catalog row exists)
- Pegatron AS205-2T1, AS400-2A1, AS400-2A1-CX8
- Compal SX420-2A
- MSI S6053G480RAU8, S3063G290RAU4
Partner announced, catalog row may still be missing: Aivres KR6268 (6U / 8, company news); Ingrasys MGX 8-GPU liquid. Write “partner announced; confirm Certified Systems before PO.” Do not treat Advantech AIR-420 / IPC-730 as Server Edition systems — those rows are certified for Workstation / Max-Q.
Mainland brand mis-lock: Inspur / Nettrix / H3C / xFusion Certified Systems rows are still A100-era (examples already in the directory: NF5280M6, X620 G40, UniServer R4900 G5, FusionServer 2288H V6). Channel “YuanNao + RTX Pro 6000 series” may be 6000D or an uncertified retrofit. Do not invent new NF / X6 part numbers. RFQ rule: full certified system name + GPU 900-2G153-2700-030; if they cannot produce both, split the line and mark pending confirmation.
Workstation Edition
Quick Answer: Workstation Edition is the 600 W desktop card: 5.4 by 12 inches, dual-slot, Double Flow Through, one PCIe CEM5 16-pin, and 1792 GB/s. Marketplace MPN 900-5G144-2500-000 is an existence proof only. Do not invent sibling 900-star codes. Do not drop this active card into a passive server chassis.
Workstation Edition is the 600 W professional desktop board. Official size is 5.4 inches by 12 inches, dual-slot, Double Flow Through, with one PCIe CEM5 16-pin. Memory bandwidth is 1792 GB/s on the same 96 GB GDDR7 ECC class as Max-Q. Marketplace MPN 900-5G144-2500-000 is an existence example for Workstation. It is not a license to invent sibling 900-* codes.
Fit a single-card lab, a design studio, or a 70B quantized / QLoRA desktop when the chassis can take Double Flow Through and a 16-pin feed. Unfit: stuffing this active card into a passive server chassis, or treating four Workstation cards as a small-entity default. One 600 W card usually needs a dedicated circuit and a 1200 W-class PSU. Two times 600 W no longer looks like a lab tower.
Max-Q Workstation Edition
Quick Answer: Max-Q Workstation Edition is the 300 W active-blower card at 1792 GB/s in a 4.4 by 10.5 inch dual-slot board. NVIDIA positions it for up to four GPUs in one workstation. It is the density path for a tight office circuit. It is not a Server Edition thermal SKU and does not belong on an RTX PRO Server BOM.
Max-Q is the official density design for a workstation that must hold more than one card without four times 600 W on an office circuit. Board power is 300 W. Form is 4.4 inches by 10.5 inches, dual-slot, active blower. Bandwidth stays 1792 GB/s. Official positioning is up to 4 GPU in a workstation. Keep Max-Q off an RTX PRO Server line and off a passive-air Server chassis.
If the buyer wants four Workstation cards in one tower, stop and re-run the lab tree. Four times 600 W is a different facility conversation than four times 300 W. Max-Q exists so that conversation can stay on a workstation, not on an uncertified 2U.
Chassis and Feed
Quick Answer: Passive Server Edition cards use chassis air as the cooler; liquid FHXL will not power on without a loop. Workstation 600 W needs a Double Flow Through tower and a dedicated circuit. Do not default four or eight Workstation cards. One 600 W card usually wants a 1200 W-class PSU; four times 600 W is not a lab tower.
Do not invent rack kilowatts. The only watt figures on this page are the official single-card values: 300 W, 600 W, and 400–600 W configurable. Qualitative feed notes follow from those numbers plus chassis airflow or a liquid loop.
- Passive Server air: the chassis is the cooler. Generic 2U, industrial PC, or Workstation active-card logic equals thermal throttle or slot damage.
- Liquid FHXL: no loop, no power-on. MGX 6U, not a desktop board.
- Workstation 600 W: Double Flow Through chassis, CEM5 16-pin, dedicated circuit, 1200 W-class PSU for one card.
- Max-Q 300 W: official path to 2–4 GPU in one tower on a tighter office circuit.
- Eight times 600 W Server: a data-hall project, not a small entity. Still not HGX.
Lenovo field-add still requires the system cable table. White boxes have no such table. Write PSU headroom as N times 600 W plus CPU, and write the CEM5 cable as its own line when the card ships without it.
RFQ by Edition Without Mixing H200 PCIe, RTX 6000 Ada, or RTX 6000D
Quick Answer: Keep the three Editions, H200 PCIe, and RTX 6000 Ada on separate columns. 6000D is a do-not-mix channel name with no official family row. Server bandwidth is 1597 GB/s; Workstation and Max-Q are 1792 GB/s. H200 is Hopper HBM; Ada is the previous generation. Do not substitute across those columns.
This comparison exists so a buyer can RFQ an NVIDIA RTX PRO 6000 Blackwell by Edition — Server, Workstation, or Max-Q — without mixing H200 PCIe, RTX 6000 Ada, or RTX 6000D on the same line. 6000D is a column only to mark “do not mix.” Teardown and press figures for 6000D stay off the main spec table.
| Dimension | Server Edition | Workstation | Max-Q | H200 PCIe | RTX 6000 Ada | 6000D (do not mix) |
|---|---|---|---|---|---|---|
| Family | RTX PRO 6000 Blackwell | Same family | Same family | Hopper datacenter | Previous Ada generation | Channel name, not a family row |
| Memory class | 96 GB GDDR7 ECC | 96 GB GDDR7 ECC | 96 GB GDDR7 ECC | HBM — see H200 page | Ada generation memory | No official datasheet |
| Bandwidth | 1597 GB/s | 1792 GB/s | 1792 GB/s | Hopper HBM class | Ada class | Do not paste press numbers here |
| Board power | 400–600 W | 600 W | 300 W | Separate RFQ line | Separate RFQ line | Split the line |
| Cooling / form | FHFL air or FHXL liquid | DFT dual-slot | Active blower | Datacenter chassis cert | Ada workstation / server SKUs | Unknown official form |
| NVLink | None | None | None | NVL SKUs exist on H200 | Not this family | Not this family |
| RFQ rule | Own line + P/N | Own line + P/N | Own line + P/N | Own line | Own line | Own line; demand official P/N |
If the same Dell XE7745 or XE7740 chassis is also certified for H200 NVL, lock the GPU line. A chassis name is not a GPU SKU. Official H200 contrast: NVIDIA H200.
China RFQ Lock — Three Tracks
Quick Answer: China RFQs often run two name sets in parallel. Track A is the official 96 GB three Editions. Track B is the channel name 6000D. Track C is loose-card SI assembly that is not NVIDIA-Certified. They are not interchangeable. If Controlled blocks a 96 GB Server PO, open a new line; do not silently substitute.
China RFQs often run two name sets in parallel. Track A is the official 96 GB three Editions (Workstation / Max-Q / Server). Track B is the channel name 6000D. They are not interchangeable. Do not write “China only has 6000D.”
Track A — 96 GB family
NVIDIA China blog 2025-03-18 (GTC) announced RTX PRO Blackwell Server Edition, Workstation Edition, and Max-Q Workstation Edition. The nvidia.cn Workstation PDF and architecture white paper list WS / Max-Q at 96 GB / 1792 GB/s. Dealer copy that prints “Server Edition” (96 GB, 1597 GB/s, passive, 600 W) only proves the names exist in channel language. License, quota, and whether a real PO can close remain pending confirmation.
Track B — 6000D split line
The NVIDIA family page and nvidia.cn have no 6000D product row at the same level as the three Editions, and no official datasheet. If the RFQ says 6000D, split the line, demand an official P/N, and do not substitute Server / Workstation / Max-Q. Do not put teardown memory or CUDA counts on the main spec table. Compliance-cluster context already lives on the existing GPU selection guide; this page only locks how the China RFQ is written.
Track C — loose-card SI assembly (not Certified)
Some SIs buy a loose Server Edition card (passive, no fan) and drop it into a house 2U / 4U chassis. That is a third RFQ line. It is not an NVIDIA RTX PRO Server and must not appear in the Certified Systems table. Write loose P/N 900-2G153-2700-030 (or OEM equivalent) + chassis model / U-height / airflow + PSU and CEM5 cable + GPU count + “not NVIDIA-Certified.”
How a China site can buy Server Edition on the official path only: NPN / OEM / certified ODM system BOM. Lenovo marks the GPU Controlled. Global OEM systems are public; whether a China legal entity can place the PO on Dell XE7745, Supermicro 8-GPU, or MGX liquid remains pending confirmation. Official buy entry: nvidia.cn data-center where-to-buy (NPN / OEM / certified server directory) and nvidia.cn workstation where-to-buy. RFQ lock: full Edition name + NVIDIA / OEM P/N + air or liquid + chassis airflow / power cable + GPU count.
If a channel quote says “Server Edition” but cannot produce 900-2G153-2700-030 (or Lenovo 4X67B09287 / equivalent OEM code), treat it as another line — often 6000D or Workstation mislabeled. When Controlled blocks the PO, do not silently substitute 6000D or Workstation for the Server line; open a new RFQ. License and quota remain pending confirmation. This page does not publish gray inbound steps, third-party list prices, or stock counts.
Lab and Small-Entity Feasibility
Quick Answer: A university or studio brief should start on the desktop side: one 600 W Workstation, or two to four 300 W Max-Q cards. Open a Server conversation only if the rack already moves air for a 600 W passive board. Treat a house-built chassis as a named POC line, and do not ask this family for NVLink training.
Audience: university groups, startup proofs of concept, design studios, single-node inference teams. The question is which Edition, how many cards, and whether power and compliance can carry — not whether a small shop can tighten screws. Watts below are official single-card figures only.
| Need | Feasible path | Unfit |
|---|---|---|
| Desktop 1 GPU, display, 70B quant / QLoRA | Workstation Edition (600 W) + large enough DFT chassis and 16-pin | Server passive card in a generic tower |
| Same tower, 2–4 GPUs, tight office circuit | Max-Q (300 W, official max 4) | 4× Workstation (4× 600 W) for a small entity |
| Existing rack airflow designed for 600 W passive | Server Edition 1–2 GPU (certified 2U such as SR650a V4 / R7725, or loose-card assembly with airflow and cable on the RFQ) | 8 cards in a generic 2U, or calling it HGX |
| Tender needs authorized channel + factory warranty | NPN / certified OEM·ODM / Leadtek·PNY workstation cards | Anonymous SI box (high RMA risk; mark unfit for tender) |
| China site, Controlled blocks 96 GB Server | Do not silently substitute 6000D or Workstation. 6000D = new line; WS / Max-Q that can be bought = lock by Edition. License pending confirmation | Mixing 6000D onto the Server line |
| NVLink / 8-GPU training vs HGX | This family cannot do it. Multi-GPU is PCIe only | Writing PRO 6000 as B300 / NVL |
Small-entity power, qualitative only: 1× 600 W workstation usually needs a dedicated circuit and a 1200 W-class PSU; 2× 600 W no longer looks like a lab tower; 4× 300 W Max-Q is the official density design; 8× 600 W Server is a data-hall project, not a small entity. Do not invent rack kilowatts from those single-card figures.
Fit and Unfit
Quick Answer: Fit a certified RTX PRO Server when factory warranty and a named OEM chassis are mandatory. Fit a lab tower for one Workstation or two to four Max-Q cards. Unfit: eight loose cards in a generic 2U, calling the box HGX, mixing 6000D onto Server, or treating a partner name as a certified SKU.
- Fit — certified system: Cisco, Dell, HPE, Lenovo, or Supermicro hero, or a Certified Systems ODM row, with GPU
900-2G153-2700-030(or OEM equivalent), count 2 / 4 / 8, and air or liquid on one line-set. - Fit — lab POC: 1× Workstation 600 W, or 2–4× Max-Q 300 W, or Server 1–2 GPU only when 600 W passive airflow already exists.
- Fit — loose-card SI: 1–2 GPU lab only, declared “not NVIDIA-Certified,” with P/N, airflow, and CEM5 cable on the RFQ.
- Unfit — production cluster or compliance tender on an SI white box.
- Unfit — 8 loose cards in a generic 2U called XE7745, SR675, or HGX.
- Unfit — Workstation or Max-Q cards on an RTX PRO Server BOM.
- Unfit — 6000D, Ada, or H200 sharing the PRO 6000 line.
- Unfit — inventing NF / X6 codes or treating YuanNao copy as a locked P/N.
How to Lock the RFQ
Quick Answer: Six steps: lock the full Edition name, decide desktop versus rack if you are a lab, split certified chassis from loose-card SI if Server, freeze part number plus count plus air or liquid, open a new 6000D line when Controlled blocks 96 GB Server, then send the locked BOM to RFQ.
- Step 1 — Lock the Edition name in full. Write Server, Workstation, or Max-Q Workstation. Reject Ada, 6000D, and H200 on the same line.
- Step 2 — If the buyer is a lab or small entity, decide desktop versus rack first. Prefer Workstation 1× or Max-Q 2–4× versus Server 1–2× when passive-card airflow already exists.
- Step 3 — If Server: certified OEM / ODM chassis or a loose-card SI line. Never both on one SKU. Loose-card must say “not NVIDIA-Certified.”
- Step 4 — Lock NVIDIA / OEM P/N, GPU count, and cooling. Use
900-2G153-2700-030or the partner equivalent. Count is 2 / 4 / 8 — do not default to 8. Write air versus liquid, airflow, and the CEM5 cable. - Step 5 — China: if Controlled blocks 96 GB Server, open a new line for 6000D. Do not substitute. License remains pending confirmation.
- Step 6 — Send the locked BOM to RFQ. Submit the split Edition lines for a compatibility and delivery risk review.
Common Traps and Loose-Card Risk Checklist
Quick Answer: Eight loose-card risks repeat on most failed POs: cooling, power and CEM5 cable, SKU impersonation, Controlled delivery, missing certification, no NVLink, mechanical pitch, and treating a white box as XE7745 or SR675. Demand 900-2G153-2700-030 or the OEM equivalent on the Server line.
Common naming traps sit above the loose-card list: PRO6000 without an Edition, OEM MPN treated as a new GPU, 1.79 TB/s copied onto Server, default 8 GPU, Workstation cards in a passive chassis, and 6000D silently filling a Server row.
Loose-card risk checklist (extractable, not slogans):
- Cooling. Server Edition is passive; chassis air is the cooler. Generic 2U, industrial PC, or Workstation active-card logic equals thermal throttle or slot damage. Liquid FHXL without a loop will not power on.
- Power. Up to about 600 W per card (configurable 400–600 W). The card ships without the aux cable; length is system-specific. Seat the CEM5 16-pin. Write PSU headroom as N × 600 W + CPU. Eight-card white boxes often fail PSU and PDU together.
- SKU impersonation. Box says Server Edition but the card is Workstation, Max-Q, or 6000D. No
900-2G153-2700-030(or OEM equivalent) means another line. Check 1597 versus 1792 GB/s, passive versus active, and 96 GB versus channel 6000D on receipt. - Controlled / delivery. Lenovo states some markets are not offered. Having a card is not legal clearance or factory warranty. No bypass steps. License remains pending confirmation.
- Not certified. Not an NVIDIA-Certified RTX PRO Server. Driver, vGPU, AI Enterprise, and factory RMA are often refused. Failure becomes three-way blame (card / chassis / cable).
- No NVLink. Multi-GPU is PCIe only. Eight loose cards are not HGX / B300 and are not XE7745 / SR675 airflow or riser topology.
- Mechanics. FHFL dual-slot 10.5 inches. Wrong pitch, riser, or bracket height will not seat. Even Lenovo field-add requires the system cable table; white boxes have no such table.
- Fit / unfit. 1–2 GPU proof of concept with 600 W passive airflow can be discussed. A production cluster, a compliance tender, 8 cards in a generic 2U, or calling the box certified is unfit.
Real-World Deployment Scenarios
Quick Answer: Map the three scenarios below to your workload, facility, and commercial constraints before freezing CapEx. Equal-BOM RFQs should cite which scenario drives the shortlist.
Scenario 1: Enterprise R&D Lab Inference (TCO Bound)
Workload Profile: Finance/manufacturing teams run local LLM inference without a full HGX hall.
Architectural Fit: RTX PRO 6000 Blackwell workstations or 4U multi-GPU boxes cut facility CapEx versus H100/H200 pods when batch latency SLAs are softer.
Scenario 2: Shared Training Bursts (Capability Bound)
Workload Profile: Occasional fine-tunes collide with daytime inference.
Architectural Fit: Separate schedules or move heavy train to DC GPUs; PRO cards optimize inference $/token more than peak MFU training.
Scenario 3: Multi-Site Edge Branches (Logistics Bound)
Workload Profile: Regional offices need air-cooled inference without CDU projects.
Architectural Fit: Prefer PRO / PCIe form factors with standard PDU budgets; reserve liquid HGX for the central pod.
Frequently Asked Questions
Quick Answer: PRO6000 is shorthand for the three-Edition Blackwell family, not a single SKU. Labs buy Workstation or Max-Q first. Loose-card SI is a third line with eight named risks. 6000D is not the China Edition. 900-2G153-2700-030 is the Server Edition GPU used on Lenovo LP2263.
PRO6000 is shorthand for the NVIDIA RTX PRO 6000 Blackwell family. It is not a single SKU. Write the full Edition name — Server, Workstation, or Max-Q Workstation — plus the NVIDIA or OEM part number before you treat the line as locked.
Choose Server Edition for a certified rack chassis or a declared loose-card SI line. Choose Workstation Edition for one 600 W desktop card. Choose Max-Q Workstation Edition for 300 W density up to four GPUs in one tower. Do not put two Editions on one SKU row.
Labs should prefer one Workstation card or two to four Max-Q cards. Discuss Server Edition at one or two GPUs only when 600 W passive airflow already exists. Loose-card assembly can be a proof of concept, never the default for a certified system or a tender.
Yes, as a third RFQ line only. Write loose part number 900-2G153-2700-030 or the OEM equivalent, chassis model, U-height, airflow, PSU and CEM5 cable, GPU count, and the words not NVIDIA-Certified. It is not an RTX PRO Server.
The repeating failures are cooling, power and CEM5 cable length, SKU impersonation, Controlled delivery, missing certification, no NVLink, mechanical pitch, and calling a white box a certified XE7745 or SR675. Demand the Server Edition part number on receipt.
No, not when the tender requires an authorized channel and factory warranty. Use an NPN, certified OEM or ODM system, or a Leadtek or PNY workstation card. Mark an anonymous SI box unfit for tender and keep it off the certified column.
The official path is an NPN, OEM, or certified ODM system BOM. Lenovo marks GPU 900-2G153-2700-030 Controlled. License, quota, and whether a named global chassis can take a local PO remain pending confirmation. Do not publish a gray inbound path.
No. 6000D is a channel name with no official family row and no official datasheet. China still lists the 96 GB three Editions. If the RFQ says 6000D, split the line and demand an official part number. Do not substitute Server, Workstation, or Max-Q.
No. Official RTX PRO Server density language is two, four, or eight GPUs. Do not default to eight. Mainstream 2U dual-GPU systems arrive later than 4U eight-GPU systems. Labs should not treat eight cards as the starting quantity.
It is the NVIDIA part number used on Lenovo LP2263 for RTX PRO 6000 Blackwell Server Edition, 96 GB, PCIe Gen 5, passive. Lenovo option 4X67B09287 / feature CBK8 maps to that GPU. Do not invent other 900-2G153 variants.
References
Quick Answer: Confirm Editions on the NVIDIA family page and the Server, Workstation, and Max-Q product pages. Confirm certified chassis on NVIDIA-Certified Systems and Lenovo LP2263. Confirm RTX PRO Server density on the SIGGRAPH newsroom note. H200 is contrast only. On-site articles stay in Related.
- NVIDIA — RTX PRO 6000 Blackwell family
- NVIDIA — RTX PRO 6000 Blackwell Server Edition
- NVIDIA — RTX PRO 6000 Workstation Edition
- NVIDIA — RTX PRO 6000 Max-Q Workstation Edition
- NVIDIA Newsroom — RTX PRO Servers at SIGGRAPH (2025-08-11)
- NVIDIA-Certified Systems catalog
- Lenovo Press LP2263 — Server Edition PCIe Gen5 GPU
- NVIDIA — data-center where to buy (NPN / OEM / certified servers)
- NVIDIA H200 (contrast only — not this family)
Primary numeric sources: NVIDIA Edition pages and datasheets, Certified Systems, and Lenovo LP2263, retrieved 2026-08-28. Soft license and local PO paths remain pending confirmation.
Key Takeaway
Key Takeaway: Freeze the Edition name, NVIDIA or OEM part number, GPU count, and air versus liquid before CapEx. Certified RTX PRO Server and loose-card SI assembly stay on split lines. 6000D is a parallel China track, not a fourth Edition. BENQUAN GLOBAL LIMITED supplies RTX PRO 6000 Blackwell Editions with competitive pricing.