Quick Take
Quick Take: A tender BOM that says "servers, switches, storage" buys you three different kits and a price comparison that means nothing. Write 9 fields on every line — function, performance floor, quantity with units, interfaces and optics, licence term, power and cooling, warranty, delivery window, acceptance test — add a deviation table, and ask for one alternative column. Then bids differ in price and delivery, not in what is being bought.
You are not writing paperwork. You are deciding what the evaluation committee will be able to compare. Spend two hours on the BOM now, or spend a tender round re-running it later. Send us the draft clauses and we will mark the lines that will come back incomparable, before the tender opens.
What goes wrong when the RFQ uses the biggest Gbps on the PDF?
Quick Answer: You award on an easy test. Production turns every blade on.
Two vendors quote “10 Gbps.” One measured UDP firewall forwarding. The other published Threat Prevention with TLS inspection. Finance picks the cheaper unit price per gigabit. After cutover, latency climbs and new sessions fail — the box was never sized for the blades you enabled.
GSC already sends “ngfw throughput” and “firewall throughput calculator” queries to BENQUAN’s sizing helper. This article is the RFQ rulebook behind that helper: which datasheet row is eligible for award, and which numbers must sit beside it.
Brand bake-offs (Fortinet vs Palo Alto vs Check Point) stay on existing buying guides. Here you only decide the metric.
Datasheet rows — what they usually mean
Quick Answer: Same appliance, stacked numbers; only one matches your profile.
| Row name (typical) | Usually measures | Use for sizing? |
|---|---|---|
| Firewall / max throughput | Forwarding, often UDP large packets, services off/min | No — not award metric |
| NGFW throughput | App-ID / DPI mix (vendor-defined) | Only if footnotes = your blades |
| Threat Prevention / Protection | IPS + malware + related blades | Default yes |
| IPS throughput | IPS-focused path | If IPS-only profile |
| SSL / TLS inspection or decryption | Decrypt path | Required if you decrypt |
| IPSec / SSL VPN | Tunnel overlay | Separate from edge NGFW path |
Illustrative naming varies by vendor — always read the dated datasheet. Independent RFC 9411 / NetSecOPEN profiles disclose feature state; use them to sanity-check, not to invent Mbps for an untested SKU. Mbps pending confirmation.
What “real” NGFW throughput means for procurement
Quick Answer: Capacity with your inspection profile on — not the marketing ceiling.
Definition: for buying and tendering, real NGFW throughput is the sustained forwarding rate when the security features you will enable are on, under a traffic mix close to production (including TLS decrypt if planned). It is not the maximum firewall Gbps printed at the top of the datasheet.
Like rating a truck by towing capacity with the trailer attached, not by top speed empty on a test track. Empty-track numbers sell brochures; trailer numbers move freight.
Palo Alto community sizing guidance states the same rule of thumb: size on Threat Prevention throughput. Fortinet materials label the analogous deeper row Threat Protection. Different words — same procurement idea.
Lock the metric on the RFQ, 6 steps
Quick Answer: Features → one row → CPS/sessions → footnote parity → headroom → named metric on the line.
- Step 1 — List features that stay on day one — IPS, app control, antivirus, URL, sandbox, SSL decrypt — if it will be enabled, it must be in the sizing row.
- Step 2 — Circle one datasheet row per vendor — Threat Prevention/Protection, plus decryption if in scope. Strike through headline firewall Gbps for award math.
- Step 3 — Add CPS and session ceilings — Write expected new connections/sec and concurrent sessions beside Gbps.
- Step 4 — Normalize footnotes before brand compare — Packet size, protocol mix, blades on/off — if footnotes differ, prices are not comparable.
- Step 5 — Apply headroom to your measured peak — Size against 95th-percentile demand with growth; many teams plan ~2× peak as a planning heuristic — confirm on project traffic, pending confirmation.
- Step 6 — Put the metric name on the RFQ line — Require vendors to quote the same named row and attach the datasheet page/date used.
Small first step: open the best datasheet on your desk. Highlight the Threat Prevention/Protection row and the SSL row. If the RFQ still cites only “firewall throughput,” rewrite that line before you compare price.
Who must use the deep row — who can simplify?
Quick Answer: Full NGFW with TLS decrypt: deep row mandatory. Simple stateful edge with no decrypt: still avoid UDP-only marketing peaks.
Internet edge with TLS inspection. Decryption throughput (or Threat Prevention with decrypt on) is the binding number. Pair HA so failover does not strand CPS.
OT or low-TLS segments. Threat Prevention without decrypt may suffice — still document blades on the RFQ so sellers cannot swap in a firewall-only figure.
- Fit: any RFQ naming Gbps; multi-vendor bake-off; calculator users who need award language.
- Not fit: pure cloud NGFW SKUs sized only in vCPU/credit terms with no appliance datasheet; already-awarded single SKU refresh with measured production headroom.
Throughput comparison traps
Quick Answer: UDP vs TCP, mixed footnotes, ignoring CPS, awarding on headline Gbps.
| Trap | What happens | Fix |
|---|---|---|
| Award on firewall Gbps | Blades-on collapse | Threat Prevention/Protection row |
| Cross-brand without footnotes | Apples vs UDP | Same blades, same mix |
| Ignore SSL row | Decrypt kills capacity | Require decrypt metric |
| Gbps only | CPS exhaustion | Add CPS + sessions |
| Average bandwidth | Peaks drop sessions | 95th percentile + headroom |
| Unsigned datasheet date | Stale SKU row | Page + date on RFQ |
Frequently Asked Questions
Quick Answer: A tender BOM is the issuer's pricing baseline: same lines, same units, same licence years. Bidders answer with a deviation table, and the committee compares lines, not totals.
Use the row that matches the features you will run in production — usually Threat Prevention (Palo Alto naming) or Threat Protection (Fortinet naming), and the SSL/TLS inspection or decryption row if you decrypt. Ignore headline “firewall throughput” for sizing awards.
Firewall/UDP large-packet tests measure forwarding with advanced services off or minimized. Threat Prevention runs IPS, malware and app control; SSL inspection adds decrypt/re-encrypt cost. Industry explainers often cite multi-fold gaps (e.g. ~10 Gbps firewall vs ~2 Gbps threat+SSL on the same class of claims) — treat as illustration, pending confirmation on your dated datasheet.
Not always. Some vendors publish a separate “NGFW” mix and a deeper Threat Prevention/Protection number. Read the footnote: which blades were on, packet size, and whether traffic was UDP or HTTP/app mix. Align the footnote before you compare two brands.
New connections per second and concurrent sessions. Short-lived flows can exhaust setup rate while bandwidth sits at a fraction of rated throughput. Put CPS and max sessions next to the Gbps row on the RFQ.
Both are inputs, not awards. Calculators assume a mix. Independent methods (RFC 9411 / NetSecOPEN-style) state which features were enabled — compare that profile to yours. Prefer same-lab, same-feature comparisons over marketing UDP peaks.
Yes. Send 95th-percentile bandwidth, TLS ratio, required blades and HA plan. We return which datasheet rows to lock on the RFQ within 1 business day. Use the interactive helper at /firewall-sizing-calculator.html for a first pass; Mbps pending confirmation.
References
Quick Answer: Buyer behaviour figures come from the G2 and TechnologyMatch 2026 surveys; tender scale from DoNews award tracking for the first seven months of 2026. Checked 21 October 2026.
Key Takeaway
Key Takeaway: Size and RFQ NGFWs on Threat Prevention/Protection — and SSL decryption when in scope — not headline firewall Gbps. BENQUAN maps datasheet rows to your feature list within 1 business day; Mbps pending confirmation.