Quick Take
Quick Take: Freeze fabric CapEx as CLMSWITCH-24NODE-R5×4 + X190212-CS-PE (N9336C)×4, CU1M×4, CU2M×24, MPO×8, LC×16, SFP28×16, and both QSFP28 forms (X65405-N-C×8 + X65405 Ext×8). Do not omit CU2M while arguing switch stickers. Pack and ONTAP One math live only on the AFF A70 BOM page.
Definition: CLMSWITCH Marker vs N9336C Hardware
Quick Answer: A NetApp cluster-fabric RFQ freezes the CLMSWITCH marker, the Cisco N9336C chassis SKU, support/contract qty, and every copper/fiber/optic line before CapEx PO. It is not a drive-pack worksheet and not a single-HA drawer buy. Marker rows are entitlement signals — not physical switches by themselves.
Definition for CapEx: On NetApp CPQ exports, CLMSWITCH-24NODE-R5 is the cluster / SAN / storage switch marker for a 24-node-class fabric entitlement. X190212-CS-PE is the hardware line for Cluster Switch N9336C 12Pt PTSX 10/25/40/100G (Cisco Nexus 9336C-class). Buyers who quote only the Cisco chassis and drop the NetApp marker understate the equal-BOM brief; buyers who quote only the marker have no shippable hardware.
This page answers: how do I RFQ-check the N9336C fabric + optics + cabling CapEx from an AFF A70 lot without rehashing pack math? For 36 packs = 72 drives, ONTAP One Flash 1100 TB, and X50132A iWARP, use the sibling A70 BOM article in Related.
- Fit this page: fabric-only equal-BOM — four switches, Cisco support/contract, full optics and cable counts.
- Boundary: storage capacity ranking, ONTAP One TB meters, or single-HA C60 columns without a topology label.
Numbers Table: Switches×4 + Support + Optics Qty
Quick Answer: Line CLMSWITCH-24NODE-R5×4, X190212-CS-PE×4, HW support×4, DOC-CISCO-CONTRACT×4, then SFP28×16 and both QSFP28 forms (N-C×8 and Ext×8). Soft lead times stay industry estimate / pending confirmation. Switch stickers without optics or copper rows are not an equal fabric BOM for CapEx freeze.
| Part number | Product (short) | Qty | RFQ role |
|---|---|---|---|
| CLMSWITCH-24NODE-R5 | NetApp cluster switch marker (24-node) | 4 | Entitlement / fabric intent |
| X190212-CS-PE | Cluster Switch N9336C 12Pt | 4 | Cisco hardware chassis |
| SVCVN-CON-SNT-9336CFX2-3 | HW SUPP 9336CFX2 / X190212, 8x5xNBD, 3–5Yr | 4 | Support qty only — no prices |
| DOC-CISCO-CONTRACT | Cisco Switch Service Contract | 4 | Contract qty only — no prices |
| X65404-N-C | SFP28 25GbE SR | 16 | 25GbE optic density |
| X65405-N-C | QSFP28 100GbE SR,-C | 8 | NetApp -C optic form |
| X65405 | QSFP28 100GbE SR | Qty 1 / Ext 8 | Dual form — keep on RFQ |
Verified from a 2026 AFF A70 CPQ export (price-stripped). Soft commercial windows for optics and Cisco renewals: industry estimate / pending confirmation — do not invent list or net amounts on the public brief.
Copper & Fiber Cabling Counts (Do Not Omit CU2M×24)
Quick Answer: The same lot ships X-QSFP-100G-CU1M-C×4, X-QSFP-100G-CU2M-C×24, OM4 MPO/MPO×8, and LC–LC OM4×16. CU2M×24 is the largest cable count and the easiest line to cut incorrectly when CapEx pressure hits switch stickers. Equal-BOM fabric RFQs keep every copper and fiber row visible.
| Part number | Product (short) | Qty | Buyer note |
|---|---|---|---|
| X-QSFP-100G-CU1M-C | Cisco QSFP–QSFP 100G CU Passive 1m | 4 | Short copper |
| X-QSFP-100G-CU2M-C | Cisco QSFP–QSFP 100G CU Passive 2m | 24 | Largest copper count — protect on RFQ |
| X66200-2-N-C | Cntlr–Switch OM4 MPO/MPO 2m | 8 | Controller-to-fabric fiber |
| X66250-2-N-C | LC–LC OM4 2m | 16 | Lower-speed / host fan-out |
| X-02659-00-N-C | Rail Kit 4-Post Adj 24–32 | 2 | Install kit (often with switch racking) |
| X800-42U-R6-C | Jumper C13–C14 in-cab | 16 | Power cords — keep with PSU density on storage BOM |
- Do: put copper + fiber on the same RFQ cover sheet as N9336C×4 so peers cannot undercut by shipping “switch-only.”
- Do not: accept a counter-quote that matches four chassis but zeros CU2M or MPO without a topology redesign note.
Pitfall: Mixing X65405 and X65405-N-C Forms
Quick Answer: The export lists X65405-N-C×8 and a bare X65405 line with Ext Qty 8. Treat Ext=8 for RFQ count on the bare SKU. Do not consolidate by deleting one form without written confirmation from the quoting desk — dual lines are a CapEx undercount trap, pending confirmation of packaging intent.
RFQ handling
- Keep both part numbers visible on the equal-BOM brief.
- Annotate “X65405 Ext Qty 8 ≠ Qty 1” so spreadsheet pivots do not collapse the row.
- Ask whether -C and non -C are complementary optics pools or alternate packaging — mark the answer pending confirmation until signed.
- Pair optic counts with SFP28×16 and the copper/fiber tables above so host 25GbE and 100GbE paths stay complete.
Own-route limitation: this checklist freezes SKU math from one CPQ lot. It does not replace Cisco Hardware Universe optic matrices, NetApp cabling guides for a specific ISL distance, or a site survey for rack power density.
Comparison: A70 Fabric vs A50 Fabric vs C60 No Fabric
Quick Answer: This A70-sourced fabric lot and typical A50 MCC-IP peers both show N9336C×4, but A70 uses X50132A iWARP while A50 uses X60134A. A single-HA C60 capacity column usually has zero cluster switches. Equalize switch + optics before CapEx ranking — prices stay off this page.
| Dimension | This A70 fabric lot | Typical A50 fabric peer | Typical C60 single-HA |
|---|---|---|---|
| Cluster marker | CLMSWITCH-24NODE-R5 × 4 | Often present ×4 | Often absent |
| Switch hardware | N9336C (X190212) × 4 | N9336C × 4 | Often 0 |
| MCC-IP adapter (storage side) | X50132A (A70) | X60134A (A50) | Often absent |
| Copper 2m CU | 24 | Peer-dependent | N/A if no fabric |
| QSFP28 dual forms | X65405-N-C + X65405 Ext | Verify peer BOM | N/A |
| Limitation of this page | Does not size ISL distance, usable TB, or FC SAN directors — those need separate worksheets / peer pages. | ||
When the peer is another large NX-OS fabric (for example Nexus 9336C-FX2 + 9364C-GX CWDM4 lots), keep optics families distinct — NetApp-coded X6540x rows are not interchangeable with arbitrary CWDM4 qty without redesign.
Fit / Unfit Decision Boundary
Quick Answer: Fit when CapEx funds MCC-IP or multi-HA cluster fabric with four N9336C switches and a full optics/cable kit. Unfit when the brief is a single-HA drawer, when procurement wants switch stickers only, or when the real question is drive-pack / ONTAP One TB (use the A70 BOM page instead).
Fit
- Multi-HA AFF lots that already list CLMSWITCH×4 and N9336C×4
- Buyers equalizing fabric CapEx across A70 and A50 peers (same switch count, different iWARP SKU)
- Teams catching CU2M / dual QSFP undercounts before PO
Unfit
- Single-HA C60 capacity buys with no fabric intent
- Quotes that match four chassis but zero copper/fiber/optics without a redesign note
- Readers looking for 72-drive pack math or ONTAP One Flash 1100 TB — that is the A70 BOM article
How To Freeze a Fabric-Only Equal-BOM RFQ
Quick Answer: Separate fabric from storage CapEx, line CLMSWITCH×4 with N9336C×4, attach Cisco support and contract qty, freeze CU1M/CU2M/MPO/LC counts, keep both X65405 forms plus SFP28×16, then equalize A50 and C60 peers and mark soft lead times as industry estimate / pending confirmation before the CapEx PO.
- Step 1 — Separate fabric CapEx from storage CapEx. Put switches, optics, and cables on this RFQ column. Send pack math and ONTAP One TB to the AFF A70 BOM checklist.
- Step 2 — Line CLMSWITCH markers and N9336C hardware. Require CLMSWITCH-24NODE-R5×4 and X190212-CS-PE×4 together. The marker is not a chassis substitute.
- Step 3 — Attach Cisco support and contract qty. Keep SVCVN-CON-SNT-9336CFX2-3×4 and DOC-CISCO-CONTRACT×4 as quantity-only lines — no public prices.
- Step 4 — Freeze copper and fiber cable counts. Line CU1M×4, CU2M×24, OM4 MPO×8, and LC×16. Reject “switch-only” counters that silently zero CU2M×24.
- Step 5 — Keep both QSFP28 optic forms plus SFP28. Quote X65405-N-C×8, X65405 Ext Qty 8, and X65404-N-C×16. Flag dual-SKU risk in writing.
- Step 6 — Equalize peers and mark soft lead times. Compare A50 fabric (same N9336C×4, X60134A) vs C60 no-fabric. Soft lead times = industry estimate / pending confirmation.
Frequently Asked Questions
Quick Answer: CLMSWITCH is the NetApp marker and X190212 is the N9336C chassis; keep both X65405 forms; never RFQ switches without CU2M×24 and optics; this page is fabric-only — pack/ONTAP One lives on the A70 article; equalize A50/C60 topology before CapEx ranking.
CLMSWITCH-24NODE-R5 is the NetApp cluster-switch marker (24-node class) that signals fabric entitlement on the CPQ. X190212-CS-PE is the Cisco N9336C 12-port hardware SKU. Quote both: marker×4 and switch×4. The marker alone is not a chassis.
The source BOM lists X65405-N-C×8 and a separate X65405 line with Ext Qty 8. Dropping either form undercounts optics CapEx. Confirm complementary versus alternate packaging with the quoting desk before PO; soft lead times remain industry estimate / pending confirmation.
No. An equal-BOM fabric RFQ must carry CU1M×4, CU2M×24, OM4 MPO×8, LC×16, SFP28×16, and both QSFP28 forms with the four switches. Omitting CU2M×24 while arguing switch stickers is the most common CapEx undercount on this lot.
No. This page freezes cluster-switch, optics, and cabling CapEx only. Pack math (36 packs = 72 drives), ONTAP One Flash 1100 TB, and X50132A iWARP live on the AFF A70 BOM article — link that page for the storage column.
A50 MCC-IP peers often also ship N9336C×4 but use X60134A iWARP, not A70 X50132A. A typical single-HA C60 capacity column has zero N9336C fabric. Equalize switch count and optics before any CapEx ranking; prices stay off this page.
References
Quick Answer: Cite NetApp MetroCluster IP required components for four IP switches, AFF A70/A90 cabling guidance, and Cisco Nexus 9300 / 9336C hardware documentation for optic and port context. Keep all benquan.hk peer pages in the Related appendix only — never duplicate those URLs here.
- NetApp — Required MetroCluster IP configuration components and naming conventions — four IP switches; platform adapter contrast
- NetApp — Cable the AFF A70 or AFF A90 hardware — controller-to-network cabling patterns
- Cisco — Nexus 9300 Series Switches Data Sheet — Nexus 9300 / 9336C-class platform context
- NetApp — AFF A-Series all-flash storage — product family context for fabric-attached AFF CapEx
Key Takeaway
Key Takeaway: Quote fabric CapEx as CLMSWITCH×4 + N9336C×4 + CU2M×24 + dual X65405 forms + SFP28×16 — never switch stickers alone. Equalize A50 (same switches, different iWARP) vs C60 (often no fabric). BENQUAN GLOBAL LIMITED supplies NetApp cluster-switch and Cisco N9336C optics kits with competitive pricing.