Enterprise Storage / All-Flash SAN / Databases / VMware

NetApp ASA: is there one NFS or SMB share in scope, and does that mean the quote is AFF?

All-flash SAN built on ONTAP — FC, iSCSI, NVMe/FC, and NVMe/TCP with symmetric active-active multipathing for mission-critical block workloads without NAS complexity.

Quick Take

Quick Take: NetApp ASA is ONTAP with the file half removed: the same snapshots, replication, and ransomware tooling, but block only. That makes the first procurement question binary — one NFS or SMB share in scope moves the quote to AFF, and no amount of controller sizing changes that answer.

Model Ladder

Quick Answer: Six current models climb in two form factors: A20, A30 and A50 sit at roughly 2U, while A70, A90 and A1K move to 4U for more slots and controller headroom. The A50 is the usual FlexPod midpoint. C-Series covers QLC capacity tiers; treat A150 through A900 as refresh-matching only.

Specs summarize NetApp ASA product pages, datasheets, and Hardware Universe–class limits (exact drive counts, PCIe cards, and ONTAP minima vary by SKU). Always lock the BOM in HWU. Related: AFF A-Series, Pure FlashArray, PowerStore T, IBM FlashSystem, SKU Lookup. Request a quote.

Current A-Series* Form factor (typical) Role
ASA A20~2UEntry SAN performance
ASA A30~2UMid SMB / departmental SAN
ASA A50~2UBalanced enterprise SAN (common FlexPod pick)
ASA A70~4UHigher performance / slot density
ASA A90~4UDemanding low-latency block
ASA A1K~4UTop A-Series performance tier

*Confirm chassis, drive bay, and core/memory counts in NetApp Hardware Universe for the exact P/N.

Also in portfolio Notes
ASA C-SeriesCapacity-optimized all-flash SAN (QLC-class economics) for denser, warmer datasets
Prior A150 / A250 / A400 / A800 / A900Still documented for install/maintain; use for refresh matching or secondary quotes only
12
Max nodes*
64G
Max FC class*
200G
Max Ethernet*
SAN
Block focus

*Published scale/protocol ceilings for current ASA A-Series families — model-dependent.

Overview

Quick Answer: NetApp ASA is the block-only branch of the ONTAP family: same snapshot, replication and ransomware tooling, but tuned for SAN rather than mixed file and block duty. Symmetric active-active paths remove ALUA path-preference tuning from host builds. Quote new estates on the A20 through A1K ladder under ONTAP 9.16.

ASA targets organizations that want NetApp resiliency and Snap* data protection without operating a unified NAS/SAN controller. Symmetric active-active multipathing simplifies host path design versus asymmetric ALUA-style layouts. FlexPod and other Cisco UCS–based designs commonly pair ASA with X-Series or rack servers for SQL/Oracle/VMware SAN boots.

Generation note: New quotes should start on the refreshed A20 / A30 / A50 / A70 / A90 / A1K ladder (ONTAP 9.16-class). Legacy A150–A900 systems remain widely deployed — do not mix generations casually without SE validation.

Protocols & Scale

Quick Answer: Four block transports are supported — Fibre Channel and iSCSI for installed estates, NVMe over FC and over TCP where latency budgets are tight. Clusters grow to six HA pairs, twelve controllers in total. Plan the fabric alongside the array: 32G or 64G FC, or 25/100/200GbE leaf ports.

  • Block protocols: Fibre Channel, iSCSI, NVMe/FC, NVMe/TCP.
  • Multipathing: symmetric active-active for simplified host connectivity.
  • Scale-out: up to 12 nodes (6 HA pairs) on current A-Series documentation paths.
  • Host fabric: pair with 32/64G FC or 25/100/200GbE leaves (e.g., CX 8325, Extreme 7520/7720, Nexus).
  • Efficiency: NetApp publishes high effective-capacity ratios with storage efficiency — size usable capacity from workload assessment, not marketing PBe alone.

Use Cases

Quick Answer: ASA earns its keep where block latency is the contract: Oracle, SQL Server, and Epic-class OLTP land on A50 through A1K over FC or NVMe/FC with SnapCenter handling copies, while ESXi estates attach over iSCSI or NVMe/TCP and gain simpler failover from symmetric paths.

Mission-critical databases

A50–A1K with NVMe/FC or FC for consistent sub-ms latency and SnapCenter integration.

VMware / hyperconverged-adjacent SAN

iSCSI or NVMe/TCP to ESXi; symmetric paths reduce failover complexity.

ASA vs AFF vs FlashArray / PowerStore

Unified needs → AFF. Block Pure/Dell compares → FlashArray, PowerStore.

Capacity-heavy SAN

Evaluate ASA C-Series when QLC density beats TLC TCO for warm block data.

Buying Checklist

Quick Answer: Confirm the estate is genuinely block-only first, because a single NFS or SMB requirement moves the quote to AFF. From there the sequence is controller tier, transport, shelf media, then the ONTAP release the chosen model requires. Price professional services for cutover rather than absorbing it internally.

  1. Block-only confirmed (else quote AFF)
  2. A20–A1K performance tier vs C-Series capacity
  3. FC vs iSCSI vs NVMe/FC vs NVMe/TCP
  4. Drive shelves, media (TLC/QLC), and growth to 12-node cluster
  5. Host HBA/NIC speeds and optics
  6. ONTAP version minimum for the chosen model
  7. SnapCenter / SnapMirror / ransomware recovery design
  8. Support entitlement and Professional Services for cutover

Search NetApp parts on SKU Lookup.

How to Order an ASA: Four Steps From IOPS Profile to RFQ

Quick Answer: NetApp ASA is a block-only SAN family spanning 6 models in 2U and 4U form factors, so ordering well means measuring IOPS and latency first, matching controller and host-port count second, confirming the SAN-only boundary third, and only then issuing matched RFQ columns with dated lead times.

Step 1 — Measure before you pick. Capture real IOPS, latency targets, and read-write mix for 2 to 4 representative weeks, then size the controller with roughly 20 percent headroom over that measured peak — the A50-to-A90 choice is a performance assessment, never a model-number guess. Step 2 — Match ports and slots. Count required 200GbE or FC host ports per controller and verify slot headroom on the 4U A70/A90/A1K chassis before freezing. Step 3 — Respect the SAN-only line. ASA has no production NFS or SMB role — any NAS requirement moves that column to AFF, and pretending otherwise is the most common mixed-protocol mistake. Step 4 — RFQ on equal meters. Issue one brief covering controllers, ports, drive mix, and support years; expect 14 to 35 business days door-to-dock per line and keep both vendor columns under 80 percent PDU load assumptions so power comparisons stay honest.

RFQ checklist before you PO

Quick Answer: Freeze model and option SKUs, support or subscription years, ship-by date, and HA or spare needs on one dated ATP before you compare channel prints. Use the checklist below, validate lines on SKU Lookup when the brand is indexed, then open a BOM risk RFQ — soft channel prices stay industry estimate or pending confirmation.

  • Model / MPN lines — chassis and options matching this page (not a vague family name).
  • Quantities + HA — single unit vs pair; spare FRUs if required.
  • Support / subscription years — tier and term on the same quote as hardware.
  • Ship-by / quote validity — lock reprice-until-ship language when memory or list cliffs apply.
  • Acceptance — Service Tag / serials vs PO; reject surprise third-party parts without paperwork.

Free Compatibility & Delivery Risk Assessment · NetApp SKU Lookup

Frequently Asked Questions

Quick Answer: These answers settle two recurring decisions: platform fit and controller sizing. ASA has no production NAS role, so any NFS or SMB requirement points to AFF instead. Between A50 and A90, choose on measured IOPS, latency targets and host port count — a performance assessment, not the model number.

The official ASA family datasheet is ds-4254-asa.pdf (netapp.com). This page is the RFQ ladder — A20 through A1K form factor and SAN role — so you can pick a model before opening the PDF. Lock the BOM in Hardware Universe.

ASA is positioned as SAN/block-optimized. If you need production NAS protocols on the same controllers, quote AFF (or a separate file platform) instead of forcing ASA outside its design center.

Start from IOPS/latency and host port density. A50 is a frequent mid-enterprise/FlexPod fit; A90/A1K when ultra-low latency and higher controller resources dominate. Size with a NetApp performance assessment, not model name alone.

Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: Pick the tier from measured IOPS, latency targets, and host port density, then confirm the exact part number in NetApp Hardware Universe before signing, because bays, cards, and ONTAP minima shift by SKU. Budget cutover services explicitly. BENQUAN GLOBAL LIMITED supplies NetApp ASA A-Series arrays with competitive pricing.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents