Quick Take
Quick Take: This AFF A70 CPQ lot is a four-node-class footprint (AFF-A70-001×4) with 36× X4028A-2-A-C packs (= 72 physical drives), ONTAP One Flash 1100 TB, X50132A-C×4 iWARP, X50130B×12, X50133A×4, and four N9336C switches. Do not treat 36 packs as 36 SSDs or paste A50 X60134A onto A70.
Definition: What This AFF A70 BOM Is (and Is Not)
Quick Answer: An AFF A70 BOM RFQ freezes controller HA count, drive-pack quantity converted to physical SSDs, ONTAP One per-TB Flash entitlement, MCC-IP iWARP adapters, host Ethernet modules, and four cluster switches before CapEx PO. It is not a single-HA capacity column and not a drop-in twin of an AFF A50 X60134A fabric lot.
Definition for CapEx: NetApp AFF A70 is a mid-to-high AFF controller class that appears in MetroCluster IP (MCC-IP) documentation with adapter X50132A in Slot 2 (ports e2a / e2b). A CPQ export that already lines four HA-system rows, four N9336C switches, and iWARP modules is signaling multi-HA / fabric-capable procurement — not a lone two-controller drawer.
This page answers the buyer question: how do I RFQ-check an AFF A70 lot that mixes ONTAP One Flash, dense NVMe packs, and N9336C fabric without mixing up pack qty and SSD count? Soft commercial terms stay off the page; only part numbers, quantities, and published NetApp topology rules remain.
- Fit this page: CapEx freeze for A70 four-node-class + fabric switches + ONTAP One Flash + SnapMirror Cloud / S3 entitlements.
- Boundary: ranking vs single-HA C60 without a topology label; treating 36 packs as 36 drives; assuming A50 adapter SKUs on A70.
Drive Pack Math: 36 Packs = 72 Drives (~1102 TB Raw)
Quick Answer: X4028A-2-A-C is a pack of 2×15.3TB NVMe4 SED. Qty 36 therefore means 72 physical drives, not 36 SSDs. Raw media ≈72×15.3≈1102 TB, which lines up with SW-ONTAPO-FLASH-A70-C at 1100 TB on this lot — verify usable TB and spare policy on a separate worksheet.
CPQ buyers commonly misread the pack SKU as one SSD per line. The product description itself carries the multiplier: Drive Pack 2X15.3TB. Freeze the worksheet in three columns before any peer ranking:
| Metric | Value | Procurement note |
|---|---|---|
| Pack SKU | X4028A-2-A-C | 2×15.3TB NVMe4 SED per pack |
| Pack quantity | 36 | CPQ Ext Qty = 36 |
| Physical drives | 72 | 36 × 2 — never quote as 36 SSDs |
| Raw media (industry estimate) | ≈ 1102 TB | 72 × 15.3 TB; pending confirmation of usable / ADP layout |
| ONTAP One Flash entitlement | 1100 TB | SW-ONTAPO-FLASH-A70-C qty aligns to pack raw |
- Do: write “36 packs / 72 drives / ~1100 TB Flash entitlement” on every A70 RFQ cover sheet.
- Do not: compare pack qty to an A50 lot’s pack qty without converting both sides to physical drives first.
Price-Stripped CPQ BOM: Controllers, Packs, Power
Quick Answer: The 2026 CPQ lot opens with AFF-A70×2, AFF-A70-001 HA System×4, AFF-A70A-100-C×2, then 36 drive packs and eight 2000W Titanium PSUs. SupportEdge and Cisco contract rows stay on the RFQ as quantity-only lines — list and net amounts omitted from this public checklist.
| Part number | Product (short) | Qty | RFQ flag |
|---|---|---|---|
| AFF-A70 | AFF A70 Model | 2 | Model parent |
| AFF-A70-001 | AFF A70 HA System | 4 | Four-node-class footprint |
| AFF-A70A-100-C | AFF A70 HA System,-C | 2 | HA system -C row |
| X4028A-2-A-C | Drive Pack 2×15.3TB NVMe4 SED | 36 | = 72 drives |
| X50200A-C | PSU 2000W Titanium | 8 | Power density |
| NO-DATA-ATREST-ENCRYPTION | No Data at Rest Encryption OS | 4 | Policy lock — see note below |
| CS-G1A-SE-BASIC | SupportEdge Basic | 2 | Support — no prices |
| CS-NBD-DELIVERY-INC-A | NBD Parts Delivery included | 2 | Support — no prices |
Optics, Cables, Rails & Power Cords (Full Qty Table)
Quick Answer: This lot carries CU1M×4, CU2M×24, OM4 MPO×8, LC×16, SFP28 SR×16, QSFP28-N-C×8, plus a second QSFP28 line X65405 Ext Qty 8 (dual SKU with X65405-N-C), rail kits×2, and C13–C14 jumpers×16. Freeze every cable/optic row on the RFQ — do not argue switch stickers while omitting CU2M×24.
| Part number | Product (short) | Qty / Ext | RFQ flag |
|---|---|---|---|
| X-QSFP-100G-CU1M-C | Cisco QSFP–QSFP 100G CU Passive 1m | 4 | Short copper |
| X-QSFP-100G-CU2M-C | Cisco QSFP–QSFP 100G CU Passive 2m | 24 | Largest cable count — easy to omit |
| X66200-2-N-C | Cntlr–Switch OM4 MPO/MPO 2m | 8 | Fiber to fabric |
| X66250-2-N-C | LC–LC OM4 2m | 16 | Host / lower-speed fan-out |
| X65404-N-C | SFP28 25GbE SR | 16 | Pairs with 10/25GbE modules |
| X65405-N-C | QSFP28 100GbE SR,-C | 8 | NetApp -C optic form |
| X65405 | QSFP28 100GbE SR (non -C) | Qty 1 / Ext 8 | Dual line — keep both; treat Ext=8 for RFQ |
| X-02659-00-N-C | Rail Kit 4-Post Adj 24–32 | 2 | Rack install |
| X800-42U-R6-C | Jumper C13–C14 in-cab | 16 | Power cords with PSU density |
- X65405 vs X65405-N-C: the export shows both forms. Do not drop either line when consolidating BOMs. For CapEx count, use Ext Qty 8 on the bare X65405 row plus the separate X65405-N-C×8 — ask the quoting desk whether they are complementary or alternate packaging (pending confirmation).
- Pitfall: quoting N9336C×4 alone while cutting CU2M×24 or optics collapses the equal-BOM fabric story. See the dedicated fabric/optics RFQ page in Related for switch-side equal-BOM steps.
I/O Adapters: X50132A iWARP ≠ A50 X60134A
Quick Answer: This lot ships X50132A-C×4 (2PT 100GbE iWARP), X50130B-C×12 (2PT 100GbE), and X50133A-C×4 (4PT 10/25GbE). NetApp maps AFF A70 MCC-IP to X50132A Slot 2 e2a/e2b. AFF A50 peers use X60134A — different SKU family on the same port names; do not substitute across platforms.
| SKU | Role | Qty | Buyer check |
|---|---|---|---|
| X50132A-C | 2PT 100GbE iWARP | 4 | MCC-IP back-end; Slot 2 e2a/e2b on A70 |
| X50130B-C | 2PT 100GbE | 12 | Host / cluster Ethernet density |
| X50133A-C | 4PT 10/25GbE | 4 | Lower-speed host fan-out |
| A50 peer (do not paste) | X60134A iWARP | — | A50 Slot 2 only — wrong on A70 RFQ |
- Platform row: AFF A70 / FAS70 / AFF C80 → X50132A Slot 2 → e2a, e2b (NetApp required MCC-IP components).
- Peer trap: A50 / A30 / C60 class rows use X60134A. Same port names (e2a/e2b) do not make the SKUs interchangeable.
Cluster Fabric: N9336C×4 + CLMSWITCH×4
Quick Answer: The export lines CLMSWITCH-24NODE-R5×4 and X190212-CS-PE (Cluster Switch N9336C 12Pt)×4, plus Cisco HW support and DOC-CISCO-CONTRACT×4. Four switches mark fabric intent for multi-HA / MCC-IP-capable CapEx — not a free upgrade hidden inside drive packs or the ONTAP One Flash meter.
| Part number | Product | Qty |
|---|---|---|
| CLMSWITCH-24NODE-R5 | Cluster switch marker (24-node class) | 4 |
| X190212-CS-PE | Cluster Switch N9336C 12Pt PTSX 10/25/40/100G | 4 |
| SVCVN-CON-SNT-9336CFX2-3 | HW SUPP 9336CFX2 / X190212, 8x5xNBD, 3–5Yr | 4 |
| DOC-CISCO-CONTRACT | Cisco Switch Service Contract | 4 |
When equalizing against an AFF A50 peer that also carries four N9336C units, keep adapter SKUs distinct (A70 X50132A vs A50 X60134A) even if switch count matches. When equalizing against a single-HA C60 with zero N9336C, label the topology mismatch before any $/TB debate — commercial figures stay off this page.
ONTAP One Flash 1100 TB + SnapMirror Cloud + S3
Quick Answer: SW-ONTAPO-FLASH-A70-C at qty 1100 is ONTAP One Package per TB Flash for A70 — not ONTAP Base Flash. Add SW-SMIRROR-CLD-ONTAP-ONE×1 and SW-S3-SM-ONTAP-ONE×1 so SnapMirror Cloud tiering and S3 protocol entitlements do not silently drop off the CapEx PO cover sheet.
| Software SKU | Meaning | Qty | Vs A50 peer note |
|---|---|---|---|
| SW-ONTAPO-FLASH-A70-C | ONTAP One Package /TB Flash A70 | 1100 | A50 peer often shows ONTAP Base Flash (e.g. 734 TB) — different meter |
| SW-SMIRROR-CLD-ONTAP-ONE | SnapMirror Cloud (ONTAP One) | 1 | Cloud replication entitlement |
| SW-S3-SM-ONTAP-ONE | S3 (ONTAP One) | 1 | Object protocol entitlement |
- Align TB to packs: 1100 TB entitlement tracks ~1102 TB raw from 72×15.3TB media — good RFQ hygiene, still not usable capacity.
- Name the package: ONTAP One vs ONTAP Base changes feature entitlement language on the quote; keep the SKU prefix visible (ONTAPO vs ONTAPB).
Comparison: A70 Lot vs A50 / C60 Peers
Quick Answer: Same-vendor A50 fabric lots share four N9336C switches but use X60134A and often ONTAP Base Flash with fewer packs (e.g. 48 drives). A C60 single-HA capacity column without iWARP or N9336C is not an equal CapEx column — equalize topology before ranking.
| Dimension | This AFF A70 lot | Typical A50 fabric peer | Typical C60 single-HA peer |
|---|---|---|---|
| HA footprint | AFF-A70-001 × 4 | AFF-A50-001 × 4 | Single HA |
| Physical drives | 72 (36 packs × 2) | 48 (24 packs × 2) example | 22 CF drives example |
| Software meter | ONTAP One Flash 1100 TB | ONTAP Base Flash ~734 TB | ONTAP Base CF ~675 TB |
| MCC-IP adapter | X50132A × 4 | X60134A × 4 | Often absent |
| Cluster switches | N9336C × 4 | N9336C × 4 | Often 0 |
| Limitation of this page | Does not size usable TB, ADP spare policy, or dual-site ISL distance — those need a separate worksheet. | ||
Own-route limitation: this A70 checklist freezes SKU math and fabric intent; it does not replace Hardware Universe slot maps, ISL design, or performance sizing for a specific workload mix.
Fit / Unfit Decision Boundary
Quick Answer: Fit when CapEx explicitly funds A70 multi-HA, ONTAP One Flash near 1100 TB, X50132A fabric adapters, and four N9336C switches. Unfit when the brief is a single-HA C60 capacity buy, or when procurement still thinks 36 packs equal 36 SSDs or that A50 X60134A drops into A70 slots.
Fit
- Four-node-class AFF A70 RFQ with fabric switches already on the brief
- Buyers who need ONTAP One Flash + SnapMirror Cloud + S3 entitlements on one CapEx PO
- Teams comparing A70 to A50 fabric peers and willing to keep adapter SKUs distinct
Unfit
- Ranking this lot against a single-HA C60 without labeling topology mismatch
- Treating 36× X4028A packs as 36 drives in any TCO table
- Assuming A50 X60134A (or C60 absence of iWARP) is valid on an A70 MCC-IP RFQ
How To Freeze This AFF A70 RFQ (Step by Step)
Quick Answer: Confirm the four-node-class footprint, convert 36 packs to 72 drives and align ONTAP One 1100 TB, freeze X50132A (not X60134A), quote host Ethernet modules separately, lock four N9336C switches, freeze the full optics/cable/rail/power-cord table (including both X65405 forms), then confirm encryption stance plus SnapMirror Cloud and S3 entitlements before PO.
- Step 1 — Confirm four-node-class footprint. Line AFF-A70, AFF-A70-001×4, and AFF-A70A-100-C so CapEx matches multi-HA intent rather than a single HA drawer.
- Step 2 — Convert packs to physical drives. Write 36× X4028A-2-A-C = 72 drives; align SW-ONTAPO-FLASH-A70-C 1100 TB to ~1102 TB raw; keep usable TB on a separate sheet.
- Step 3 — Freeze A70 MCC-IP adapter SKU. Require X50132A-C×4 for Slot 2 e2a/e2b. Reject any paste of A50 X60134A onto the A70 column.
- Step 4 — Line-item host Ethernet density. Quote X50130B-C×12 and X50133A-C×4 apart from iWARP fabric adapters so host fan-out is not buried.
- Step 5 — Lock four N9336C cluster switches. Require X190212-CS-PE×4 and CLMSWITCH-24NODE-R5×4; keep Cisco support/contract qty visible without publishing prices.
- Step 6 — Freeze optics, cables, rails, and power cords. Line CU1M×4, CU2M×24, MPO×8, LC×16, SFP28×16, both QSFP28 forms (X65405-N-C×8 and X65405 Ext×8), rails×2, C13–C14×16; do not omit CU2M while arguing switch stickers.
- Step 7 — Confirm encryption stance + ONTAP One cloud/S3. Sign off on NO-DATA-ATREST-ENCRYPTION×4 intent; confirm SW-SMIRROR-CLD-ONTAP-ONE and SW-S3-SM-ONTAP-ONE; mark soft lead times as industry estimate / pending confirmation.
Frequently Asked Questions
Quick Answer: Thirty-six packs equal 72 drives; A70 MCC-IP uses X50132A not A50 X60134A; four N9336C switches mark fabric intent; keep both X65405 optic forms and confirm NO-DATA-ATREST-ENCRYPTION×4 before PO; software is ONTAP One Flash 1100 TB plus SnapMirror Cloud and S3 lines.
No. Each X4028A-2-A-C is a drive pack of 2×15.3TB NVMe SED. Thirty-six packs equal 72 physical drives. Raw media is roughly 72×15.3 ≈ 1102 TB, which aligns with the ONTAP One Flash 1100 TB entitlement on this CPQ lot.
No. NetApp lists X50132A in Slot 2 (ports e2a/e2b) for AFF A70 MetroCluster IP. AFF A50 uses X60134A in Slot 2. Do not paste A50 adapter SKUs onto an A70 RFQ.
Four X190212-CS-PE (N9336C 12-port) plus four CLMSWITCH-24NODE-R5 markers signal cluster / MCC-IP fabric intent on a multi-HA footprint. Treat them as fabric line items, not as a substitute for drive-pack math or ONTAP One TB.
SW-ONTAPO-FLASH-A70-C at 1100 TB is ONTAP One Package per TB Flash for A70 — not ONTAP Base. The lot also carries SW-SMIRROR-CLD-ONTAP-ONE (SnapMirror Cloud) and SW-S3-SM-ONTAP-ONE (S3) as single ONTAP One entitlement lines.
No. This A70 CPQ is a four-node-class footprint with fabric switches and ONTAP One Flash. A single-HA C60 capacity column without X50132A / N9336C is not an equal peer — equalize HA count and fabric before ranking CapEx.
The CPQ export shows X65405-N-C×8 and a separate X65405 line with Ext Qty 8. Treat both as RFQ-visible optics forms; do not drop either when consolidating. Confirm with the quoting desk whether they are complementary or alternate packaging before PO.
It is an OS entitlement line that disables data-at-rest encryption on each of four HA-system rows. SED drive packs alone do not prove encryption-on. Security must confirm the stance is intentional before CapEx freezes.
References
Quick Answer: Cite NetApp’s required MCC-IP components page for AFF A70 X50132A Slot 2 e2a/e2b, AFF A70/A90 install cabling guidance, and ONTAP licensing docs for ONTAP One versus Base package naming. Keep all benquan.hk A50 peer pages in the Related appendix only.
- NetApp — Required MetroCluster IP configuration components and naming conventions — AFF A70 X50132A Slot 2 e2a/e2b; AFF A50 X60134A contrast; four IP switches
- NetApp — Cable the AFF A70 or AFF A90 hardware for network and storage connectivity — controller I/O slot context and cluster cabling patterns
- NetApp — AFF A-Series all-flash storage — product family context for AFF A70 CapEx briefs
- NetApp — ONTAP licensing overview (ONTAP One vs Base) — package naming and feature entitlement language on RFQs
Key Takeaway
Key Takeaway: Freeze the A70 RFQ as AFF-A70-001×4, 36 packs = 72 drives, ONTAP One Flash 1100 TB, X50132A×4 (not X60134A), N9336C×4, plus SnapMirror Cloud and S3 lines. Equalize topology before any A50/C60 ranking. BENQUAN GLOBAL LIMITED supplies NetApp AFF A70 configurations with competitive pricing.