Data Center / Storage / ONTAP All-Flash / Procurement / Comparison

NetApp AFF A50 vs C60: performance NVMe at 734 TB, or capacity flash at 675 TB?

Performance NVMe (A50) vs capacity flash (C60r2) on the same ONTAP brief. CPQ-aligned lots: 48 drives + X60134A + four N9336C vs one C60 HA with 22 CF drives — equalize HA topology, pack math, ONTAP Base TB, and fabric before ranking.

Quick Take

Quick Take: AFF A50 is performance NVMe; AFF C60 is capacity flash (CF). A CPQ-aligned A50 lot ships 24× X4028A packs (= 48 drives), Flash 734 TB, X60134A×4, and four N9336C switches — not a peer of one C60 HA with 22 CF drives and 675 TB CF. Equalize topology first..

When AFF A50 vs AFF C60 Actually Matters

Quick Answer: Compare NetApp AFF A50 with AFF C60 when both lots stay on ONTAP all-flash hardware and the only open question is performance non-volatile memory express media versus capacity flash economics. It is the wrong page when you are standardized on ASA storage-area-network-only controllers or on FAS hybrid media.

A50 vs C60 RFQs fail when you compare a four-node-class A50 lot (48 drives, X60134A×4, four N9336C) to a single C60 HA (22 CF drives, no fabric) without stating topology, or when ONTAP Base Flash 734 TB is stacked against CF 675 TB as if the meters were identical.
A50
Perf NVMe
C60
Capacity Flash
16wk
Typical Lead
Aug
List Uplift

Same ONTAP brand, different flash economics

A50 and C60 both run ONTAP, SnapMirror, and familiar ops. The fork is media class and licensed TB packaging — performance NVMe packs versus larger capacity-flash packs — plus whether you are buying a multi-node cluster or a single HA pair.

Platform Fork — Performance vs Capacity Flash

Quick Answer: NetApp AFF A50 uses performance drive packs, for example two 15.3TB non-volatile memory express self-encrypting drives. AFF C60r2 uses capacity-flash packs, for example two 30.7TB units. ONTAP Base software follows the media class, so the A50 is metered on Flash terabytes and the C60 on capacity-flash terabytes.

DimensionAFF A50 (perf)AFF C60r2 (capacity)
RoleLatency-sensitive / higher IOPS flashHigher TB density / capacity economics
Example drive packX4028A-2-A-C — 2×15.3TB NVMe4 SEDX4030A-CF-2-C — 2×30.7TB NVMe CF SED
ONTAP Base SKU familySW-ONTAPB-FLASH-A50-C (per TB Flash)SW-ONTAPB-CF-C60-C (per TB CF)
CPQ-aligned reference lot (2026-08-25)AFF-A50-001×4; 24 packs = 48 drives; Flash 734 TB; X60134A×4; N9336C×4Single HA; 11 packs = 22 drives; CF 675 TB; no X60134A; no N9336C
Typical topology in peer lotsFour-node-class footprint + cluster / MCC-IP fabricOne HA system (two controllers)
Cluster fabricCLMSWITCH-24NODE-R5×4 + X190212-CS-PE (N9336C)×4None on the single-HA C60 lot
MCC-IP back-end adapterX60134A-C (2PT 100GbE iWARP)×4Absent — not an MCC-IP equal column
Encryption lineOften NO-DATA-ATREST-ENCRYPTION if SED packs still need OS flag claritySame — confirm SED vs software encryption path

AFF A50 Reference BOM (Four-Node Class + Fabric)

Quick Answer: A CPQ-aligned performance lot (2026-08-25) uses AFF-A50-001×4, twenty-four X4028A-2-A-C packs (= 48 physical drives, not 24 SSDs), SW-ONTAPB-FLASH-A50-C at 734 TB, X60130/132/134/140 ×4 each (including X60134A iWARP), and four N9336C cluster switches. List and net prices omitted — RFQ for commercial terms.

Lot-level AFF A50 hardware (quantities from a price-stripped CPQ screenshot — do not treat as a public list):

SKUDescriptionQtyRole
AFF-A50AFF A50, Model2Model marker
AFF-A50-001AFF A50 HA System (bundle)4Four-node-class HA footprint
AFF-A50A-100-CAFF A50 HA System,-C2Chassis / HA system,-C
X4028A-2-A-CDrive Pack 2×15.3TB NVMe4 SED,-C2448 physical drives (24 packs × 2)
SW-ONTAPB-FLASH-A50-CONTAP Base Package, per TB, Flash, A50,-C734Licensed Flash TB (matches pack raw ≈48×15.3)
X60130A-CI/O Module, 2PT, 100GbE,-C4Cluster / uplink
X60132A-CI/O Module, 4PT, 10/25GbE,-C4Host Ethernet
X60134A-CI/O Module, 2PT, 100GbE iWARP,-C4MetroCluster IP fabric adapter
X60140A-CI/O Module, 4PT, FC Target+Init, 32G SFP,-C4FC host / tape adjacency
X5532A-N-CRail kit, 4-post thin,-C2Rack
X97602A-CPower Supply, 1600W Titanium,-C4PSU
NO-DATA-ATREST-ENCRYPTIONNo Data at Rest Encryption OS flag4Encryption policy line

Cluster fabric (lot-level — four switches, not a single HA drawer):

SKUDescriptionQtyRole
CLMSWITCH-24NODE-R5Switch, NetApp, Cluster / SAN / Storage, 24-Node4Cluster switch marker
X190212-CS-PECluster Switch, N9336C 12Pt PTSX 10/25/40/100G4Cisco N9336C fabric
DOC-CISCO-CONTRACTCisco Switch Service Contract4Switch support paperwork

Optics and copper appear on the same CPQ (QSFP 100G CU 1m/2m, OM4 MPO/LC, 100G SR4, SFP28 SR, QSFP28 SR) — freeze host-port matrix before cutting unused lines. Commercial list/net totals are never published on this page.

What this A50 lot implies

  • Pack math: 24 × X4028A-2-A-C = 48 physical 15.3TB NVMe4 SED drives — never write “24 SSDs.” Raw ≈ 48×15.3 ≈ 734 TB aligns with SW-ONTAPB-FLASH-A50-C qty 734.
  • MCC-IP fabric intent: X60134A-C×4 (100GbE iWARP) plus four N9336C switches is not a lone HA drawer — see the AFF A50 MCC-IP 24-disk floor worked example.
  • Topology mismatch vs C60: four-node-class footprint + fabric vs one capacity HA — label this before any TCO ranking.
  • Mixed host protocols: 100GbE, 10/25GbE, and 32G FC are all present; cut unused I/O only after the host matrix is frozen.

AFF C60 Reference BOM (Single HA Capacity)

Quick Answer: A CPQ-aligned capacity lot is one AFF C60r2 HA system with eleven X4030A-CF-2-C packs (= 22 physical drives), SW-ONTAPB-CF-C60-C at 675 TB, denser 10/25GbE modules, and no X60134A / N9336C fabric. It is not an MCC-IP equal column to the A50 lot. Commercial list totals omitted — RFQ for terms.

SKUDescriptionQtyRole
AFF-C60 / AFF-C60-001AFF C60r2 Model / HA System (bundle)1 / 2Single HA pair markers
AFF-C60A-100-CAFF C60r2 HA System,-C1Chassis / HA system
X4030A-CF-2-CDrive Pack, NVMe SED CF, 2×30.7TB,-C1122 physical CF drives (11 packs × 2)
SW-ONTAPB-CF-C60-CONTAP Base Package, per TB, CF, C60,-C675Licensed CF TB (matches ≈22×30.7)
X60130A-CI/O Module, 2PT, 100GbE,-C2Uplink / HA interconnect adjacency
X60132A-CI/O Module, 4PT, 10/25GbE,-C4Host Ethernet
X60140A-CI/O Module, 4PT, FC Target+Init, 32G SFP,-C2FC
X60134A-CI/O Module, 2PT, 100GbE iWARP,-C0Absent — not MCC-IP back-end on this lot
X190212-CS-PE / CLMSWITCHN9336C / cluster switch markers0Single HA — no cluster fabric
X66211A-05-N-CCable, 100GbE QSFP28–QSFP28 Cu, 0.5m,-C2Short HA / interconnect copper
X66250-5-N-CCable, LC–LC, OM4, 5m,-C24Optical
X65404-N-CSFP28, 25GbE, SR,-C1625GbE optics
X5532A-N-CRail kit, 4-post thin,-C1Rack
X97602A-CPower Supply, 1600W Titanium,-C2PSU
NO-DATA-ATREST-ENCRYPTIONNo Data at Rest Encryption OS flag2Encryption policy line

What this C60 lot implies

  • 22×30.7TB CF SED drives (11 packs × 2) — higher raw density per drive than A50 15.3TB packs; validate workload suitability for capacity flash, not only TB math.
  • 675 TB ONTAP Base CF on one HA pair — do not treat CF TB meters as interchangeable with Flash A50 734 TB without stating media class.
  • No X60134A and no N9336C — this lot is a single-HA capacity column, not an MCC-IP dual-site peer to the A50 fabric build.
  • Topology warning: ranking A50 (48 drives + 4 switches + iWARP) against this C60 HA without labeling the mismatch produces false “C60 cheaper” slides.

How to Equalize the RFQ

Quick Answer: State target usable capacity and the latency tier first, then choose AFF A50 performance media or AFF C60 capacity flash. Separately declare how many high-availability pairs are in scope and whether cluster switches are required. Only then compare ONTAP Base terabytes, input-output modules, optics, deployment service lines and quote validity.

EqualizeA50 lot risk if ignoredC60 lot risk if ignored
Node / HA countAFF-A50-001×4 + fabric looks “more expensive” vs one HATwo controllers look “cheaper” but lack cluster / MCC-IP scale
Media classPerf NVMe priced like capacity flashCF sold into latency-critical VDI / OLTP
Drive pack math24 packs misread as 24 SSDs (true = 48 drives)11 packs = 22 drives — state pack×2 explicitly
ONTAP Base TBFlash 734 TB vs CF 675 TB mixed on one TCO slideSame
Cluster / MCC-IP fabricN9336C×4 + X60134A×4 omitted from peerAssumes free multi-HA / MCC growth without fabric
Host I/OX60130/132/140 ×4 vs C60’s lighter I/O countSame
Deploy servicesMulti-system install under-scoped if peer is single HAUnder-scoped multi-system install

Do not rank on EXW notes alone

Budgetary EXW figures on internal worksheets are not public list and are not a substitute for equal BOM. Freeze topology and media first; then dual-RFQ commercial terms under the same Incoterms and lead-time assumption.

Lead Time & August 2026 List Window

Quick Answer: Representative A50 and C60 configurations in mid-2026 often carry about 16 weeks delivery. Separately, NetApp list updates effective 15 August 2026 reprice open flash BOMs — read the dedicated uplift guide before you let either quote age past the effective date.

  • Lead time: Plan rack, fabric, and cutover against ~16 weeks unless the channel confirms a shorter factory slot in writing.
  • List uplift: NetApp Price Increase August 2026 — high-performance flash and capacity flash move on different percentage tracks; reprice both A50 and C60 lots if the quote crosses the effective date.
  • Hybrid / Keystone adjacency: Hybrid / Keystone pressure — when CapEx flash is deferred into consumption models.

RFQ Checklist — A50 and C60 on One Brief

Quick Answer: One ONTAP brief with usable TB target, latency tier, and HA pair count → A50 performance line → C60 capacity line → equalize ONTAP Base TB, I/O, optics, cluster switches, PS-DEPLOY, lead time, and list-price validity date on both quotes.

What to put on the RFQ

  • Media tier: performance NVMe (A50) vs capacity flash CF (C60) — state primary choice and alternate
  • Topology: number of HA pairs; multi-node cluster yes/no
  • Drive packs: SKU, drives per pack, SED, total drive count
  • ONTAP Base: Flash A50 TB vs CF C60 TB on the same usable-capacity target
  • I/O modules: 100GbE, 10/25GbE (2PT vs 4PT), 32G FC — host port matrix
  • Optics / copper: QSFP 100G length, SFP28 SR qty, LC OM4 qty
  • Cluster switches: N9336C (or equivalent) qty + Cisco/NetApp support paperwork
  • Rails, PSUs, power cords, encryption OS flag
  • Professional services: PS-DEPLOY-STD-ONTAP-M (or sized equivalent) per system
  • Lead time assumption (e.g. 16 weeks) and quote validity vs August list window
  • Incoterms (e.g. EXW) and destination — commercial only, not for public list publication

Submit the dual-path brief on rfq.html.

Which Part Numbers Should You Freeze on the RFQ (1 SKUs)?

Quick Answer: When quoting AFF C30 and sibling configurations across these 1 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.

Ordering SKUKey Configuration & BoundaryAdjacent BOM Lines to Freeze
AFF C302U 24 SSD slots, dual HA controllers, 128 GB, ONTAP 9.16.1+, C-Series QLC. Not C60 and not A50.AFF C30 HA pair, QLC SSD PIDs per HWU, 100GbE / 25GbE / FC per drawing, NS224 when growth is drawn

Frequently Asked Questions

Quick Answer: NetApp AFF A50 wins latency-sensitive workloads on performance media, while AFF C60 wins on capacity-flash density. Equalize high-availability pair count, ONTAP Base media class and cluster fabric before ranking total cost of ownership. Confirm the roughly sixteen-week lead time and the August 2026 list validity on every commercial quote.

Neither is universal. Pick A50 for performance NVMe workloads and C60 for capacity-flash economics. Equalize usable TB, latency tier, and node topology before ranking.

Only if you label the topology mismatch. A CPQ A50 lot with AFF-A50-001×4, 48 drives, X60134A×4, and four N9336C switches is not a peer of a single C60 HA with 22 CF drives and no fabric. Normalize growth plan or quote both as explicit options.

No. SW-ONTAPB-FLASH-A50-C and SW-ONTAPB-CF-C60-C follow different media families. State media class when you compare licensed TB.

Plan about 16 weeks for representative mid-2026 A50 / C60 configurations unless your channel confirms a shorter slot in writing.

Submit one RFQ with media, drive packs, ONTAP Base TB, I/O, switches, and deploy services.

Key Takeaway

Key Takeaway: AFF A50 vs AFF C60 is a performance-NVMe versus capacity-flash ONTAP fork — and the CPQ peer lots mismatch topology (48 drives + X60134A + four N9336C vs 22 CF drives, no fabric). Freeze pack math (24 packs ≠ 24 SSDs), media class, and fabric before ranking. BENQUAN GLOBAL LIMITED supplies NetApp AFF A50 and AFF C60 with competitive pricing.

Not sure your AFF BOM is optimal?

If A50 vs C60 media class, HA pair count, ONTAP Base TB, cluster switches, or 16-week lead time are unclear, click below for a free compatibility and delivery risk assessment. Fast BOM validation from a global free-port logistics hub.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents