Storage / MetroCluster IP

NetApp AFF A50 MetroCluster IP: Is 24 Disks the Minimum?

Buyer question: if AFF A50 uses switches for dual-site MetroCluster IP (MCC-IP), do you need at least 24 disks? Short answer: Yes under the documented four-node minimum with a single mirrored data aggregate per node — and that floor is pool math, not a switch tax.

Quick Take

Quick Take: Yes — for four-node MetroCluster IP with a single mirrored data aggregate per node, NetApp requires at least 24 disks at each site. A CPQ A50 lot with X60134A×4, four N9336C switches, and 48 physical drives (24 packs × 2) clears that floor; a C60 single-HA peer is not an equal column. Switches are fabric, not a disk tax.

Procurement note: every disk, switch, and adapter figure below is taken from NetApp MetroCluster IP documentation. Soft channel prices and lead times are industry estimate / pending confirmation — do not treat 24 disks as production capacity sizing.

Verdict: Yes — 24 Disks per Site Under the Documented Floor

Quick Answer: A four-node MetroCluster IP configuration with a single mirrored data aggregate per node needs a minimum of 24 disks at the site. That NetApp rule answers the AFF A50 switch-based dual-active question when the BOM stays inside that topology. Extra aggregates, media tiers, or eight-node DR groups change the brief — they do not erase the published floor.

MetroCluster IP (MCC-IP) is NetApp’s IP-fabric dual-site synchronous architecture: two clusters, HA pair per site, back-end replication over dedicated MetroCluster IP interfaces, plus a customer-provided cluster peering path. When buyers ask whether AFF A50 “with switches” needs 24 disks, they usually mean this four-node MCC-IP path — not a lone two-node HA pair without MetroCluster.

Definition for CapEx: the 24-disk number is the minimum supported pool/drive configuration at each site for four-node MetroCluster IP when each node carries a single mirrored data aggregate. It is not a fee attached to buying Ethernet switches, and it is not a guarantee of usable terabytes for production. In plain terms: 24 disks is not 24 TB of usable capacity — media size, RAID, and ADP partitions decide TB, not the drive-count floor alone.

  • Fit this page: AFF A50 (or peer AFF) four-node MCC-IP RFQ freezing switch BOM and disk/pool math together.
  • Boundary: two-node HA without MetroCluster; inventing a “switch disk tax”; treating 24 as capacity sizing.
QuestionDocumented answerSource class
Is 24 disks the site minimum?Yes — four-node MCC-IP, single mirrored data aggregate per nodeNetApp required components doc
Why 24?Local + remote pools; ≥7 drives/pool; 3 root + 3 data + 1 spare layoutPool / drive requirements
Do switches drive the count?No — four IP switches are fabric / ISL / intraclusterIP switch requirements
Is 24 enough usable capacity?No — supported floor only; size TB separatelyProcurement boundary

Switches Are Fabric — Not a Disk Tax

Quick Answer: MetroCluster IP requires four IP switches that form two switch storage fabrics and carry the ISL between sites. The same switches also carry intracluster traffic among controllers at each site. Quote those four switches as fabric line items; keep the 24-disk rule on the pool/drive line — never merge them into one “switch tax” story.

NetApp’s required-components guidance is explicit: MCC-IP configurations need four IP switches. Documentation examples name them IP_switch_A_1 / IP_switch_A_2 at site A and IP_switch_B_1 / IP_switch_B_2 at site B. Those switches interconnect the back-end MetroCluster IP fabric and local cluster communication. They are mandatory topology, but they do not multiply drive count.

BOM lineDocumented minimumWhat it buys
IP switches4 total (2 per site)Two fabrics, ISL between sites, intracluster paths
Controller modules4 or 8 (HA pair per site)Dual-site DR group; AFF-only when AFF is used
Disks at each site24 (single mirrored data agg / node)Pool/drive floor for four-node MCC-IP
Shelf presence≥1 shelf per site (minimum supported)Physical drive enclosure baseline
  • Do: freeze switch SKUs, optics/cabling, and ISL distance as their own RFQ block.
  • Do not: tell finance “switches force +24 disks” — that misstates NetApp’s separation of fabric vs pool rules.
  • Do: still reject under-disked quotes that ship four switches with fewer than 24 drives per site under the single-mirrored-aggregate brief.

Pool & Drive Math Behind the 24-Disk Floor

Quick Answer: At each site in four-node MetroCluster IP, every node needs at least one local pool and one remote pool. Each pool needs at least seven drives. With one mirrored data aggregate per node, NetApp states the minimum configuration requires 24 disks at the site. The minimum supported pool layout is three root, three data, and one spare.

The procurement-safe way to brief stakeholders is pool arithmetic, not folklore:

  1. Two nodes per site → each node sees a local pool and a remote pool at that site → four pools per site in the four-node pattern.
  2. ≥7 drives per pool → absolute pool floor before layout rules.
  3. Minimum layout per pool: 3 root + 3 data + 1 spare.
  4. Site roll-up: with a single mirrored data aggregate per node, NetApp publishes 24 disks at the site as the minimum configuration.
  5. Shelf: at least one shelf per site in the minimum supported configuration.
RuleValueUnit / note
TopologyFour-node MetroCluster IPTwo sites · HA pair each
Pools per node (at site)≥1 local + ≥1 remotePool ownership model
Drives per pool≥7Absolute pool floor
Min pool layout3 root + 3 data + 1 sparePer pool
Disks per site (single mirrored data agg / node)24Documented minimum
Shelves per site≥1Minimum supported
RAID families citedRAID-DP / RAID4 / RAID-TECAs supported by ONTAP version
ADP / auto-assignmentFrom ONTAP 9.4+Version-check before RFQ

RAID-DP, RAID4, and RAID-TEC are listed as supported families in the same component guidance; ADP and automatic drive assignment apply from ONTAP 9.4 onward. CapEx teams should version-pin ONTAP on the RFQ rather than assume every ADP layout from a different platform family.

AFF A50 Fabric Ports: X60134A Slot 2 (e2a / e2b)

Quick Answer: For AFF A50 MetroCluster IP, NetApp specifies Gigabit Ethernet adapter X60134A installed in Slot 2, using ports e2a and e2b for the back-end MetroCluster IP interfaces. All controllers in an AFF MetroCluster must be AFF, and every node must run the same ONTAP version.

When the buyer question names AFF A50 specifically, freeze the adapter line before debating optics:

  • Adapter: X60134A
  • Slot: 2
  • Ports: e2a, e2b
  • Platform rule: AFF MetroCluster configurations must use AFF controllers end-to-end (no casual FAS mix without a separate, version-checked design).
PlatformAdapterSlotMCC-IP ports
AFF A50X60134ASlot 2e2a, e2b
Peer note (same adapter family)X60134A also listed for AFF A30 / C30 / C60 / FAS50 class rowsSlot 2Confirm platform row; 25 GbE may need QSA transceiver per doc

Controller count for MCC-IP remains four or eight modules. The A50 adapter row does not change the four-switch fabric rule or the 24-disk site floor under the single-mirrored-aggregate brief.

Worked Example: CPQ A50 BOM vs the 24-Disk Floor

Quick Answer: A price-stripped 2026-08-25 AFF A50 CPQ lot shows X60134A-C×4 plus four N9336C switches — clear MCC-IP fabric intent — and 24× X4028A packs (= 48 physical drives, not 24 SSDs). That drive count exceeds the 24-per-site floor. A peer AFF C60 single-HA lot is not an equal MCC-IP column.

Use this as a procurement sanity check against a real channel BOM (quantities only — no list or net money published here):

SignalA50 CPQ lot (2026-08-25)How it maps to MCC-IP rules
MCC-IP adapterX60134A-C × 4 (2PT 100GbE iWARP)Matches AFF A50 Slot 2 / e2a–e2b fabric adapter family
Switch fabricCLMSWITCH-24NODE-R5 ×4 + X190212-CS-PE (N9336C) × 4Four switches = fabric requirement, not a disk tax
Drive packsX4028A-2-A-C × 24 packsEach pack = 2×15.3TB → 48 physical drives
ONTAP Base FlashSW-ONTAPB-FLASH-A50-C × 734 TBAligns with raw ≈48×15.3 TB — license meter, not pool floor
HA footprintAFF-A50-001 × 4Four-node-class marker — dual-site / multi-HA intent
Vs 24-disk floor48 drives on the lotExceeds the documented 24/site minimum; still size usable TB separately

Pack math hard rule: 24 packs of 2×15.3TB ≠ 24 SSDs. Writing “24 disks” from the pack qty alone understates the physical drive count by half and can falsely look like the exact 24-disk floor.

C60 peer is unequal. The companion capacity lot on the same dual-path brief is a single AFF C60r2 HA: 11× X4030A-CF-2-C packs (= 22 CF drives), SW-ONTAPB-CF-C60-C 675 TB, no X60134A, and no N9336C. Do not treat that C60 column as an MCC-IP equal peer when checking the 24-disk floor — see the A50 vs C60 BOM buying guide for topology equalization.

  • Keep the Yes verdict: four-node MCC-IP with one mirrored data aggregate per node still needs ≥24 disks per site.
  • This A50 lot: fabric lines prove MCC-IP intent; 48 drives clear the floor with margin when read as physical drives.
  • Do not: invent a “switch disk tax,” or claim the C60 HA is the other half of an MCC-IP pair without its own X60134A / switch / drive math.

Half-Shelf Caveat: Slots 0–5 and 18–23

Quick Answer: If you populate only 12 drives in a 24-drive shelf, NetApp requires drives in slots 0–5 and 18–23 for correct automatic assignment, distributed evenly across four quadrants. Wrong bay placement is a common RFQ failure even when the drive count looks right on paper.

Minimum supported configurations often start sparse. Auto-assignment expects balanced quadrants. For half-populated 24-bay shelves:

  1. Install drives in slots 0–5 and slots 18–23.
  2. Keep the four shelf quadrants even — do not pile all media into one end of the chassis.
  3. Re-check ownership after first boot before accepting the delivery as “MCC-IP ready.”

Limitation: This page does not invent alternate bay maps for non-24-bay shelves or for undocumented half-shelf tricks. Follow the NetApp drive-assignment article for platform-specific ADP tables (including AFF A50 internal vs external recommended counts).

Minimum vs Recommended: 24 Is Not Sizing

Quick Answer: Compare the published 24-disk supported minimum with NetApp’s ADP tables that often list 48 drives per site as a minimum recommended layout for AFF A50 external-shelf designs. Use 24 to reject illegal under-builds; use recommended counts and usable-TB modeling to size production CapEx.

LensTypical documented figureHow buyers should use it
Supported minimum (general four-node MCC-IP)24 disks / site with single mirrored data aggregate per nodeHard floor for the topology stated
AFF A50 ADP — minimum supported24 internal drives / site (quarter-shelf auto-assignment)Confirms A50 can sit on the 24 floor when internal media is used
AFF A50 ADP — minimum recommended48 drives / site (external drives only in that table row)Stronger starting point for many dual-shelf designs
Workload capacityNot a fixed disk count in the components docModel usable TB, spare policy, and growth — pending confirmation

Side-by-side, the buyer risk is clear: a quote can be “NetApp-legal” at 24 disks and still be unfit for production latency or capacity. CapEx boards should see both columns on one slide.

Who This Guide Fits — and Who It Does Not

Quick Answer: Use this guide when freezing an AFF A50 (or peer AFF) four-node MetroCluster IP CapEx RFQ that must line up switch fabric and disk-pool minimums. Skip it for two-node-only HA without MetroCluster, for inventing disk floors absent from NetApp docs, or for treating 24 disks as proven production capacity.

Fit

  • Dual-site AFF A50 MCC-IP BOM with four IP switches and documented pool math.
  • Procurement reviews that must answer “is 24 enough to be supported?” with a Yes/No tied to NetApp text.
  • RFQs that separately size usable TB after locking the supported floor.

Unfit

  • Calling 24 a “switch tax” or bundling switch SKUs into drive count folklore.
  • Two-node HA without MetroCluster IP — different topology, different brief.
  • Mixing FAS and AFF rules casually without ONTAP version and platform-row checks.
  • Claiming soft channel prices or lead times as facts — mark industry estimate / pending confirmation.

How to Freeze the AFF A50 MCC-IP RFQ

Quick Answer: Confirm four-node MCC-IP topology, line-item four IP switches, apply the 24-disk site floor with pool layout rules, freeze X60134A Slot 2 e2a/e2b on every A50, then verify half-shelf bay placement before PO. Keep capacity sizing on a separate CapEx worksheet.

  1. Step 1 — Confirm four-node MCC-IP topology. State two sites, HA pair per site, four or eight AFF controllers, and one ONTAP version across the DR group.
  2. Step 2 — Line-item the four IP switches. Quote two switches per site, fabrics, and ISL distance/optics as fabric scope — not as disk justification.
  3. Step 3 — Apply the 24-disk site floor. For a single mirrored data aggregate per node, lock ≥24 disks per site; enforce local + remote pools, ≥7 drives per pool, and 3 + 3 + 1 layout.
  4. Step 4 — Freeze A50 fabric ports. Include X60134A in Slot 2 with e2a/e2b on each AFF A50 controller for MetroCluster IP back-end links.
  5. Step 5 — Check half-shelf slots and capacity boundary. If using 12 drives in a 24-bay shelf, place media in slots 0–5 and 18–23; confirm ≥1 shelf per site; size usable TB separately (24 disks ≠ production capacity, and 24 disks ≠ 24 TB). Re-check ownership within 1 business day of first boot before signing acceptance.

Lead times for A50 MCC-IP hardware remain industry estimate / pending confirmation — do not lock CapEx calendars on an unpublished channel promise. When comparing minimum vs recommended drive counts, keep the TB model on the same slide as the 24-disk legality check so finance never confuses supportability with capacity.

Real-World Deployment Scenarios

Quick Answer: Map the three scenarios below to your workload, facility, and commercial constraints before freezing CapEx. Equal-BOM RFQs should cite which scenario drives the shortlist.

Scenario 1: Block-Only VMware/Oracle Estate (Protocol Bound)

Workload Profile: No NAS requirement; symmetric active-active block is the goal.

Architectural Fit: ASA simplifies the personality; AFF A-Series fits when unified NAS/SAN remains on the roadmap.

Scenario 2: MetroCluster IP Minimums (Sizing Bound)

Workload Profile: Dual-site sync with disk-count floors (e.g., 24-disk class constraints).

Architectural Fit: Freeze disk minimums and Mediator design before CapEx—undersized shelves fail design review late.

Scenario 3: Mixed Protocol Debt (Migration Bound)

Workload Profile: Legacy 7-Mode/NFS shares still exist beside block LUNs.

Architectural Fit: Prefer AFF until file services are retired; forcing ASA early creates parallel arrays.

Frequently Asked Questions

Quick Answer: Yes — 24 disks per site is the NetApp-documented four-node MCC-IP floor with one mirrored data aggregate per node. Switches are a separate four-unit fabric requirement. AFF A50 uses X60134A Slot 2 ports e2a/e2b. Half-shelf builds must use slots 0–5 and 18–23. Twenty-four is not workload sizing.

Yes for four-node MetroCluster IP with a single mirrored data aggregate per node: NetApp documents 24 disks at each site as the minimum supported configuration. The four IP switches are a separate fabric requirement, not the reason for the disk count.

No. MCC-IP requires four IP switches forming two fabrics with ISLs between sites. Disk minimums come from pool and drive rules (local plus remote pools, at least seven drives per pool), not from switch SKUs.

NetApp lists Gigabit Ethernet adapter X60134A in Slot 2 with ports e2a and e2b for AFF A50 MetroCluster IP back-end connectivity. Confirm the same ONTAP version and AFF-only controllers across the configuration.

For correct auto-assignment with 12 drives in a 24-drive shelf, NetApp directs placement in slots 0–5 and 18–23, distributed evenly across the four quadrants. Misplaced drives break automatic pool assignment.

No. Twenty-four is the supported minimum topology floor, not a workload sizing target. NetApp ADP guidance for AFF A50 also lists 48 drives per site as a minimum recommended layout for many external-shelf designs — size usable TB and spare policy separately.

References

Quick Answer: Cite NetApp’s required MCC-IP components page for the 24-disk site floor and four-switch fabric, the drive-assignment article for half-shelf slots and AFF A50 ADP tables, and the MCC-IP hardware interconnection overview for controller and fabric roles. Keep benquan.hk peers in Related only.

Key Takeaway

Key Takeaway: Answer the buyer question with Yes: four-node MCC-IP and one mirrored data aggregate per node → 24 disks per site. A CPQ A50 example (X60134A×4, four switches, 48 drives) proves fabric intent and clears the floor — pack qty ≠ SSD count. BENQUAN GLOBAL LIMITED supplies NetApp AFF A50 MetroCluster IP configurations with competitive pricing.

Not sure your AFF A50 MCC-IP BOM hits the floor?

If you need the four-switch fabric and 24-disk pool floor checked against your dual-site brief before PO, click below for a free compatibility and delivery risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents