Enterprise Storage / All-Flash Array / ONTAP / Scale-Out

NetApp AFF: can you swap an A250 quote for an A900, or do the drive ceiling and shelf change?

ONTAP all-flash systems from entry AFF A250 through midrange A400 and high-end A800/A900 — NVMe host connectivity, multiprotocol data services, and cluster scale-out.

Quick Take

Quick Take: Four AFF controller tiers look interchangeable on a datasheet and are not: drive ceilings, protocol personality and shelf type all change with the tier you pick. This page maps A250 through A900 against real workloads and lists the six line items that make two NetApp quotes comparable.

Model Ladder

Quick Answer: Four controller tiers scale from the A250 entry system to the A900 high end, each clustering to 24 nodes. Drive ceilings separate them: 576 SSDs on the A250, 2,880 on the compact A800, 5,760 on the A400 and A900. Those are cluster maxima, not per-HA-pair, so confirm the live successor SKU when quoting.

Scale-out and capacity maxima follow NetApp AFF A-Series datasheets / Hardware Universe (effective capacity includes efficiency assumptions). Confirm ONTAP version, ASA vs AFF personality, and media type on the quote. BENQUAN GLOBAL LIMITED supplies NetApp systems and SupportEdge. Related: Pure FlashArray //X & //C, PowerStore vs Pure vs NetApp, HPE MSA 2060, SKU Lookup. Request a quote.

Platform Role Scale-out (typ.) Max SSDs* Max effective*
AFF A250Entry all-flash2–24 nodes576~35 PB
AFF A400Midrange2–24 nodes5,760~702.7 PB
AFF A800Compact high-end2–24 nodes2,880~316.3 PB
AFF A900High-end2–24 nodes5,760~702.7 PB

*Cluster-level datasheet maxima. Per HA-pair raw examples: A400 up to ~14.7 PB, A800 up to ~6.6 PB (Hardware Universe). Newer AFF C-Series / successor SKUs may replace names — lock the exact controller on the RFQ.

SAN vs NAS limits: Maximum HA pairs for SAN can be lower than NAS on the same platform. Design the protocol personality early.

Overview

Quick Answer: Every AFF system is an active-active HA pair running ONTAP, so block and file protocols come off the same controllers instead of two products. SnapMirror handles replication, FabricPool tiers cold blocks to object storage, and nodes join or leave a cluster without taking the array offline.

Protocols & Media

Quick Answer: Hosts attach over NVMe/FC or NVMe/TCP alongside conventional FC, iSCSI, NFS and SMB, so one array can serve block and file from the same controllers. Back-end media is the real fork: NS224 shelves carry NVMe drives while DS224C-class shelves carry SAS SSDs. Fix the host protocol before sizing adapters.

  • Host: NVMe/FC, NVMe/TCP, FC, iSCSI, NFS, SMB, S3 (where licensed/configured)
  • Shelves: NS224 (NVMe), DS224C / related SAS SSD shelves
  • A400 example I/O: dense 100GbE / 25GbE / 32Gb FC via PCIe + mezzanine options
  • A800: 4U HA with onboard drive slots for compact high-end footprints
  • A900: highest RAS / performance tier; latency as low as ~100 µs on NVMe designs (vendor claim)

Use Cases

Quick Answer: Databases, VDI, virtualization, EDA/media (A800), and multiprotocol enterprise file + block with SnapMirror DR. AFF A400 HA pair with NS224 for mixed OLTP and VMware — most common midmarket BOM. AFF A800 when rack density and high IOPS matter (EDA, M&E, dense VDI).

Midrange enterprise AF

AFF A400 HA pair with NS224 for mixed OLTP and VMware — most common midmarket BOM.

Compact high performance

AFF A800 when rack density and high IOPS matter (EDA, M&E, dense VDI).

Vs Pure FlashArray

Choose AFF for ONTAP ecosystem and large clusters; Pure for Evergreen simplicity — see FlashArray //X & //C.

Buying Checklist

Quick Answer: Lock six things before a NetApp quote is comparable: the controller tier, usable capacity after efficiency assumptions, protocol personality and NVMe host path, HA-pair count with a growth path, the ONTAP software entitlement, and SupportEdge coverage including spare shelves and optics. Missing entitlements are the usual budget surprise.

  1. A250 vs A400 vs A800/A900 (or current successor)
  2. Usable capacity and efficiency assumptions
  3. SAN, NAS, or unified; NVMe host path
  4. Number of HA pairs / cluster growth path
  5. ONTAP One / Enterprise software entitlement
  6. SnapMirror, SnapCenter, FabricPool / cloud tier
  7. SupportEdge and spare shelves/optics

Search NetApp parts on SKU Lookup.

Frequently Asked Questions

Quick Answer: Choose AFF when you need unified NAS and SAN under ONTAP; pick the ASA personality for block-only estates and MSA-class arrays only for entry SAN. Because NetApp refreshes controllers often, treat A250 through A900 as a capability ladder and verify the live Hardware Universe part number on every quote.

NetApp documents the AFF A-Series on docs.netapp.com. This page is the RFQ ladder — A250 through A900 cluster maxima — so you size an ONTAP pair before opening Hardware Universe. Confirm the live controller SKU and ASA versus AFF personality on the quote.

ASA is NetApp’s SAN-optimized all-flash personality. AFF is the multiprotocol A-Series line. Pick based on block-only vs unified NAS+SAN needs.

Yes — NetApp refreshes controllers regularly. Treat A250/A400/A800/A900 as a capability ladder and confirm the live Hardware Universe SKU on every quote.

MSA is entry/mid SAN simplicity. AFF is enterprise ONTAP with richer data services and scale-out. See MSA 2060 for smaller SAN BOMs.

Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: Pick the tier from the drive ceiling and node count you will reach in three years, not from today's usable TB — then hold that shortlist while you equalize ONTAP entitlement and SupportEdge across bidders. BENQUAN GLOBAL LIMITED supplies NetApp AFF A-Series arrays with competitive pricing and worldwide shipping.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents