MDS 9396T / classic .lic / air-gapped SAN

How do you install four Enterprise .lic files on four air-gapped MDS 9396T switches?

The accepted design is four HOSTID-matched files. The switch does not generate the .lic. SLP RUM is a different queue.

Quick Take

Quick Take: Install four classic Enterprise .lic files by running install license bootflash:<filename> on each MDS 9396T after verifying every file's HOSTID=VDH= line matches that chassis's show license host-id output—copying one license onto four switches is the trap that burns the first window. The accepted pack is four files.

What happened in the hall before FAT on four MDS 9396T?

You already racked the fabric. Typical scene, no named customer: 4 Nov 2026, four MDS 9396T on NX-OS 9.4(4), no Cisco.com from the floor. FAT wants ENTERPRISE_PKG Permanent before that first window closes. Procurement bought M9300ENT1K9 as if one Enterprise line covered the fabric. It does not. A classic MDS .lic is a lock for one chassis, not a fabric token.

The first USB mixed the binds. One stick held FLM2936••••_ENT.lic next to files still meant for FOX2925•••• and FLM2940•••• in another crate. The fourth chassis needed its own file too (VDH=•••••••••••). Opening the text is the diagnosis: the INCREMENT line prints HOSTID=VDH= and it must equal show license host-id on that supervisor. Four chassis, four PAKs on an internet PC, four files, then install license one matching file per bootflash. SLP RUM is the other path only when those four classic files do not exist. List and net pending confirmation. BENQUAN does not issue Cisco licenses; send the four CLI lines and we mark HOSTID gaps in 1 business day.

Copying FLM2936••••_ENT.lic onto the other three bootflash directories is the trap that burns the window. It is not the accepted pack.

Fit: air-gapped SAN FAT that needs Permanent ENTERPRISE_PKG on MDS 9396T. Not fit: retail; asking BENQUAN to mint a Cisco file; Catalyst 9800 / DNA Smart Account (another slug); converting classic to SLP as this page’s job.

How do you know which .lic file belongs to which MDS 9396T chassis?

A classic MDS Enterprise license is a host-locked file: the INCREMENT line carries HOSTID=VDH=, and NX-OS prints the same string from show license host-id. The strings must match character-for-character. A file generated against FLM2936•••• will not Permanent on FOX2925••••.

Four switches require four files. If procurement fulfilled one M9300ENT1K9 PAK four times on software.cisco.com Traditional Licensing, you downloaded four separate .lic files—each bound to the serial you entered. If you see only one .lic on the USB, someone skipped three fulfillments or copied the same file four times. Neither mistake recovers without returning to LRP. Send BENQUAN the four host-id lines and the file texts if you need a match table.

Chassisshow license host-idFile you should see
1VDH=FLM2936••••FLM2936••••_ENT.lic
2VDH=FOX2925••••FOX2925••••_ENT.lic
3VDH=FLM2940••••FLM2940••••_ENT.lic
4VDH=••••••••••••••••••••••_ENT.lic
switch# show license host-id License hostid: VDH=FLM2936••••

Open the file in a text editor. If HOSTID=VDH= equals that chassis, this file installs here. A leftover file for a crate still downstairs is not a spare for this hall.

What happens when you install a mismatched .lic file on the wrong switch?

Treat a mismatch as a failed bind: show license usage never transitions the ENTERPRISE_PKG line from eval or Not Installed to Installed and Permanent. That is a FAT miss, not a later mystery. Open every file in a text editor before copy. Compare HOSTID=VDH= to show license host-id on that chassis. A leftover file for a serial still in another crate is not a spare for this hall.

When should you use Smart Licensing Using Policy instead of classic .lic files?

Only when no classic .lic files exist and you have already purchased M9300ENT1K9 PAKs. SLP shifts the burden from per-switch files to RUM (Resource Usage Measurement) uploads and ACK downloads. Four switches generate four RUM files; CSSM processes each RUM and returns four ACK files. The workflow matches classic in step count but adds CSSM web portal dependencies.

Do not start SLP on FAT night if four classic .lic files are already on the USB. Classic install license is the short path on FAT night. SLP requires license smart transport off, license smart save usage, manual CSSM upload, waiting for ACK generation, downloading ACK to a laptop, copying ACK to bootflash, then license smart import. The round trip takes a CSSM round-trip per chassis when the CSSM portal is responsive, longer if the hall USB policy requires air-gapped file staging through a security workstation.

SLP is the correct path when procurement hands you M9300ENT1K9 SKUs but never completed PAK fulfillment on software.cisco.com, or when Cisco account team confirms your Smart Account is enabled for policy-based licensing and four licenses are already deposited in the virtual account. In every other scenario, fulfilling four PAKs through Traditional Licensing and installing four .lic files is faster and leaves a smaller failure surface.

What is the exact CLI sequence to install a classic Enterprise license on one MDS 9396T?

switch# dir usb1: switch# copy usb1:FLM2936••••_ENT.lic bootflash: switch# install license bootflash:FLM2936••••_ENT.lic switch# show license usage

The output must show:

Feature Ins Lic Status Expiry Date Comments Cnt Cnt -------------------------------------------------------------------------------- ENTERPRISE_PKG - 1 Installed - -

Status "Installed" and Expiry Date "-" (permanent) confirm success. If Status remains "Eval" or "Not Installed," the HOSTID did not match. Run show license host-id and compare against the INCREMENT HOSTID= line inside the .lic file again. If they differ, stop. Do not keep installing the same file on the next three chassis. Find the matching file first.

Repeat the sequence on the other three switches, using each switch's matched .lic file. Do not copy the same file onto four bootflash directories. Each chassis consumes its own license file.

How do you generate a classic .lic file from an M9300ENT1K9 PAK?

You do not generate licenses—Cisco does. Integrators fulfill PAKs through the License Registration Portal (LRP) on software.cisco.com, entering the PAK code and the target switch serial number (VDH= string from show license host-id). The portal validates entitlement and immediately offers a .lic file download. The file is plain text; open it to confirm the HOSTID=VDH= line matches the serial you submitted.

Four switches require four LRP transactions:

  1. Log in to software.cisco.com > Traditional Licensing.
  2. Enter the M9300ENT1K9 PAK code.
  3. When prompted for device serial, paste the VDH= output from switch 1 show license host-id.
  4. Download the .lic file. Rename it to include the last six characters of the serial (example: FLM2936••••_ENT.lic) so you can identify it on a crowded USB.
  5. Repeat for switch 2, 3, 4.

Store all four files on the same USB stick with clear naming. If procurement sent one M9300ENT1K9 line-item expecting it to cover four switches, that is a quoting error—one PAK fulfillment yields one license file for one chassis. Re-order three more PAKs or ask Cisco to split the original PO into four PAK codes before the maintenance window opens.

What do you send BENQUAN when the .lic files are missing or the serials do not match?

Collect four pieces of CLI output and all .lic file contents you currently have:

  1. Run show license host-id on each of the four MDS 9396T switches. Save the CLI line (example: License hostid: VDH=FLM2936••••).
  2. Locate every .lic file on the USB, laptop, or email attachment. Open each in a text editor and copy the INCREMENT HOSTID=VDH= line.
  3. Note the M9300ENT1K9 PAK codes procurement provided (if available) and whether any PAK was already fulfilled on software.cisco.com.
  4. Email the four host-id outputs, the .lic texts, and the PAK status to BENQUAN with subject line "MDS 9396T HOSTID license review – [your RFQ ref]."

BENQUAN marks mismatches and missing fulfillments in one business day, returning a table that maps which .lic (or which unfulfilled PAK) corresponds to which chassis serial. If new PAK fulfillment is required, the reply includes the exact VDH= strings to enter in LRP so you download correctly bound files before the next change window.

Do not wait until the night of FAT to discover a mismatch. Send it before the window, not after the USB is already in the hall.

Can you use one M9300ENT1K9 .lic file across a four-switch fabric?

No. Each switch enforces its own license independently. The ENTERPRISE_PKG feature unlocks Inter-VSAN Routing, FC port-security configurations, and other fabric-wide services, but the license check happens in the local supervisor. A .lic file is not a floating fabric credential—it is a cryptographic binding between one Cisco-issued entitlement and one VDH= serial number.

Integrators sometimes assume a "fabric license" model because SAN switches participate in a single logical fabric. That assumption fails during install license when three of the four switches remain in Eval status while only the serially matched switch transitions to Installed. Confirm on the image: ENTERPRISE_PKG must read Installed and Permanent on every chassis before you call FAT done.

If procurement ordered "one Enterprise license for a four-switch fabric," return to the quote. The correct line-item is four M9300ENT1K9 PAKs or four SLP license deposits in CSSM. BENQUAN confirms SKU quantities and provides a revised BOM within one business day when an RFQ includes fabric topology and switch serial numbers.

How do you install a Smart Licensing Using Policy ACK file after generating RUM?

The SLP workflow on NX-OS 9.4(4) for air-gapped MDS 9396T. Accounting file, not running-config. USB follows hall policy. CSSM: Reports → Usage Data Files → Upload → Virtual Account → Download ACK. Four chassis, four RUM files, four ACK imports.

switch# configure terminal switch(config)# license smart transport off switch(config)# exit switch# copy running-config startup-config switch# license smart save usage all bootflash:all_rum.txt switch# copy bootflash:all_rum.txt usb1: switch# copy usb1:<ack> bootflash: switch# license smart import bootflash:<ack> switch# show license status switch# show license usage

Repeat for the other three switches—four RUM files, four ACK files. Each ACK is switch-specific; importing switch 2's ACK onto switch 3 fails authorization the same way a mismatched classic .lic fails.

Common trap: If license smart save usage all returns "requested item was not found," NX-OS has not consumed any licensed feature and has no usage to report. Cisco documentation and Dell support notes suggest enabling then disabling a feature that consumes ENTERPRISE_PKG (example: feature ivr, copy run start, no feature ivr, copy run start, then retry RUM generation). Do not leave IVR or any trial feature permanently enabled solely to generate RUM. This quirk does not affect classic install license, which is why integrators under time pressure prefer classic .lic files when they already exist.

Key Takeaway

Four MDS 9396T switches require four Enterprise .lic files, each matched to one chassis HOSTID=VDH= serial. Verify show license host-id output against every file's INCREMENT line before you copy to bootflash. Open every file and match HOSTID before copy. A leftover file for another crate is not a spare for this hall.

If .lic files are missing or serials do not align, send BENQUAN four show license host-id outputs plus all .lic texts you currently have. BENQUAN confirms matches and flags missing PAK fulfillments in one business day, so you enter the hall with the correct files on the USB.

Classic install license remains supported on MDS 9396T NX-OS 9.4(4) and is the short path on FAT night. SLP is the alternative when classic .lic files do not exist, but the RUM/ACK cycle adds a CSSM round-trip per chassis and CSSM portal dependencies—reserve it for new deployments where procurement already deposited licenses in a Smart Account, not for FAT night recovery.

BENQUAN GLOBAL LIMITED supplies MDS BOM review and marks HOSTID mismatches within 1 business day. We do not issue Cisco licenses. Price pending confirmation.

FAQ

Four. This field SOP delivered one HOSTID-matched file per chassis. A classic .lic prints HOSTID=VDH=FLM2936••••. Copying one file onto four bootflash directories is a mismatch, not the accepted design.

No. show license host-id only prints the bind key. An internet PC fulfills each PAK in Cisco Traditional Licensing (LRP). BENQUAN does not issue the file.

license smart transport off; license smart save usage all bootflash:all_rum.txt; CSSM upload; license smart import bootflash:<ack>. Four switches, four RUM files. No 9800 file keyword.

The field BOM used M9300ENT1K9. List and net pending confirmation. The SKU does not make one file valid on four serials.

Not if four matching classic .lic files already exist.

Copy the matching file to bootflash, then install license bootflash:<file>. Verify with show license usage.

No. Send four serials and the .lic text. Gap mark-up is 1 business day. Price pending confirmation.

Usage reports are license accounting, not running-config. Still follow hall USB policy.

References

Do you hold four MDS 9396T serials and four .lic files?

Send the four host-id lines and the four file texts. BENQUAN marks HOSTID mismatches within 1 business day. We do not issue Cisco licenses. Price pending confirmation.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents