Quick Take
Quick Take: A tender BOM that says "servers, switches, storage" buys you three different kits and a price comparison that means nothing. Write 9 fields on every line — function, performance floor, quantity with units, interfaces and optics, licence term, power and cooling, warranty, delivery window, acceptance test — add a deviation table, and ask for one alternative column. Then bids differ in price and delivery, not in what is being bought.
You are not writing paperwork. You are deciding what the evaluation committee will be able to compare. Spend two hours on the BOM now, or spend a tender round re-running it later. Send us the draft clauses and we will mark the lines that will come back incomparable, before the tender opens.
What goes wrong when a DE4200H quote skips the base unit?
Quick Answer: You end up comparing an iSCSI-only 2U12 quote against an FC 2U24 quote and calling the cheaper one a saving.
It usually starts with a real request: a buyer asks two suppliers for “a Lenovo DE4200H with a DE240S shelf”. Both reply fast. One priced the 2U12 base with base iSCSI ports; the other priced the 2U24 base with Fibre Channel cards and the mirroring licence. The second quote looks 30% expensive. It is mostly a different array.
Entry SAN is where this hurts most, because the headline price is small enough that nobody re-checks the configuration line by line. Then the shelf arrives with the wrong drive size, or the FC fabric has nothing to plug into, or the first snapshot-retention review discovers the 512-snapshot tier was never licensed.
This page is the six-line check that prevents that: base unit, shelf math, host card, licences, SSD cap, dated specs. Run it before you ask anyone — including us — for a DE4200H price.
The DE4200H numbers that decide the quote (Lenovo Press, verified)
Quick Answer: Dual controllers, up to 300K read IOPS, 96 drives max, 512 snapshots only with the licence.
| Item | Verified figure | Why it moves the quote |
|---|---|---|
| Controllers | Dual active-active, 32 GB memory each (64 GB system) | Same on both base units — not a differentiator |
| Performance (vendor spec) | Up to 300,000 random read IOPS, 109,000 write IOPS (4K); 9.2 GB/s read, 2.7 GB/s write (64K) | Enough for most entry SAN; above this, step up a model |
| Base units | 7DCA = 2U12 LFF; 7DCQ = 2U24 SFF | Fixes drive size, starting count and shelf math |
| Expansion | Up to 3 shelves (DE240S 2U24 / DE120S 2U12), 96 drives max, 1.47 PB raw | Growth past 96 drives = DE6600 conversation |
| Host ports | Base 4× 10/25 Gb iSCSI; HIC adds 16/32 Gb FC, 12 Gb SAS, Base-T | Unnamed HIC = iSCSI-only quote |
| Software | DDP, SSD read cache (≤5 TB), base snapshots standard; 512 snapshots + async mirroring (FC, ≤32 pairs) optional licences | The two lines most often missing from “cheap” quotes |
| SSD rules | Max 24 SSDs; no HDD/SSD mixing inside a volume group or pool | Designs above the cap need rework, not discount |
Source: Lenovo Press LP2071 product guide (software 11.90R2), checked 2026-10-22. Lenovo markets the design as 99.9999% availability — that is the vendor's design figure, not a supplier promise.
What the DE4200H is — and where it stops
Quick Answer: A SANtricity block array for predictable entry SAN. File services or ONTAP features point at the DM series instead.
Definition: the Lenovo ThinkSystem DE4200H is an entry hybrid SAN array running SANtricity — dual active-active controllers, Dynamic Disk Pools, block access over iSCSI, Fibre Channel or SAS. It is built to be simple, fast for its class and cheap to expand to 96 drives.
Think of it as a well-built block-only workhorse: it stores volumes for VMware clusters, databases, backup targets and video surveillance, and it does not try to be a file server. The moment your requirement says NFS/SMB shares or ONTAP data services, you have left DE territory — that is the DM series (for example DM5100F), a different quote entirely.
The step-up line matters too. Within the DE family, the DE6600 class takes over when drive counts, IOPS or shelf growth outgrow the 96-drive ceiling. Quoting a DE4200H against a 200-drive growth plan produces a cheap first year and an expensive forklift in year two.
The DE4200H RFQ check, 6 steps
Quick Answer: Base unit, shelf math, host card, licences, SSD cap, dated specs — in that order.
- Step 1 — Fix the base unit first — Choose 7DCA 2U12 (large drives, capacity-leaning) or 7DCQ 2U24 (small drives, performance-leaning) and write the machine type on the RFQ. Every later number depends on it.
- Step 2 — Do the shelf math out loud — Base drives plus up to three DE240S/DE120S shelves, 96 drives maximum. State today's count and the growth count separately — they can point at different base units.
- Step 3 — Name the host card — Base is 10/25 Gb iSCSI. If the fabric is Fibre Channel or SAS, the HIC is a priced line; write the speed (16/32 Gb FC) next to it.
- Step 4 — List the licences the design actually uses — Base snapshots included; 512-snapshot tier and FC asynchronous mirroring are optional. Write “not required” explicitly if unused, so nobody prices them in or leaves them out by accident.
- Step 5 — Cap the SSD lines — At most 24 SSDs per system, and HDDs and SSDs never mix inside one volume group or pool. If the design shows more, it needs a rework, not a discount.
- Step 6 — Date the numbers — Specifications above are Lenovo Press LP2071 (software 11.90R2), checked 2026-10-22. Ask every bidder to confirm the same software level and delivery date on the quote.
Small first step: take your best current quote and highlight only the machine type. If it says “DE4200H” without 7DCA or 7DCQ, the quote is not finished — send it back before you compare anything else on the page.
Who should buy DE4200H — and who should not?
Quick Answer: Block-only, under 96 drives, predictable growth: yes. File services, ONTAP features, 200-drive plans: no.
Regional VMware or database cluster. Two or three hosts, FC or iSCSI fabric, 20–60 drives of mixed HDD and SSD tiers. This is the centre of the DE4200H envelope, and the six-field check usually turns three vague quotes into three comparable ones within a day.
Surveillance or backup target on the 2U12 base. Large NL-SAS drives in the 7DCA with DE120S shelves give cheap terabytes with dual-controller protection. Performance demands are modest; capacity per rack unit is the whole game.
- Fit: block-only workloads, ≤96 drives over the system's life, one fabric (iSCSI or FC), snapshot needs inside the licensed tier you actually priced.
- Not fit: file services or ONTAP feature requirements (quote DM series), growth clearly past 96 drives (quote DE6600 class), all-flash performance targets (quote an all-flash model, not 24 SSDs in a hybrid chassis).
DE4200H quoting traps we keep seeing
Quick Answer: Wrong base, silent HIC, unlicensed features — all cheap to fix on paper, expensive after delivery.
| Trap | What happens | Fix |
|---|---|---|
| Base unit not named | 2U12 and 2U24 quotes compared as if identical | Machine type (7DCA/7DCQ) on every quote line |
| HIC left silent | FC fabric, iSCSI-only array delivered | Name the card and speed, or write “iSCSI base only” |
| 512 snapshots assumed included | Retention policy fails at first review | Licence tier as a priced line, or “not required” in writing |
| Async mirroring assumed | DR design has no replication | FC-only, licensed both ends — price both ends |
| More than 24 SSDs designed | Configuration invalid at build time | Cap SSDs, split pools, or move to all-flash model |
| HDD+SSD in one pool | Pool cannot be built as drawn | Separate volume groups/pools per media type |
Frequently Asked Questions
Quick Answer: A tender BOM is the issuer's pricing baseline: same lines, same units, same licence years. Bidders answer with a deviation table, and the committee compares lines, not totals.
Same controllers, different drive geometry. 7DCA is the 2U12 large-form-factor base (3.5-inch bays); 7DCQ is the 2U24 small-form-factor base (2.5-inch bays). The choice fixes which drives you can start with and how the three expansion shelves add up — up to 96 drives per system (Lenovo Press LP2071). Quote the machine type, not just “DE4200H”.
Up to 96 drives with three expansion enclosures (DE240S 2U24 SFF or DE120S 2U12 LFF, mixed up to three total), up to 1.47 PB raw, 512 volumes and 256 hosts (Lenovo Press LP2071, software 11.90R2). If your growth plan passes roughly 96 drives, you are in DE6600 territory — say so before anyone quotes.
Base ports are 4× 10/25 Gb iSCSI per enclosure (2 per controller). Fibre Channel 16/32 Gb, 12 Gb SAS and 1/10 GbE Base-T come on host interface cards (HICs). A quote that never names the HIC has priced the base iSCSI only — the most common reason two DE4200H quotes are not quoting the same array.
Partly. Dynamic Disk Pools, SSD read cache (up to 5 TB), base snapshots, volume copy and thin provisioning are standard. Scaling snapshots to 512 and asynchronous mirroring (Fibre Channel only, up to 32 pairs) are optional licences. If your design uses either, both must appear as priced lines on both sides of the comparison.
Different operating systems, different jobs. The DE series runs SANtricity: block-only SAN, simple and fast for VMware, databases and surveillance. The DM series runs ONTAP: unified file and block with a richer data-management stack. Pick DE when the requirement is block storage done cheaply and predictably; pick DM when file services or ONTAP features are in the requirement.
Yes. Send target capacity, drive type, host interface and the expansion plan. BENQUAN returns the base unit, shelves, HIC and licence lines as one dated quote within 1 business day. Configuration prices are pending confirmation until that quote is issued; the figures on this page are Lenovo Press specifications, checked 2026-10-22.
References
Quick Answer: Buyer behaviour figures come from the G2 and TechnologyMatch 2026 surveys; tender scale from DoNews award tracking for the first seven months of 2026. Checked 21 October 2026.
- Lenovo Press LP2071 — ThinkSystem DE4200H product guide: controllers, 300K/109K IOPS, 96 drives, 1.47 PB, HIC and licence maximums (software 11.90R2)
- Lenovo Press LP2071 (PDF) — machine types 7DCA/7DCQ and CTO codes 7DCACTO1WW / 7DCQCTO1WW
- Lenovo Docs — ThinkSystem DE Series hardware installation and maintenance guide: shelf and cabling rules
Key Takeaway
Key Takeaway: A DE4200H quote is comparable only when it names the base unit (7DCA or 7DCQ), the shelf math, the host card and the licence tier. BENQUAN checks those six fields against Lenovo Press figures and returns a dated quote within 1 business day; configuration prices are pending confirmation until issued.