Networking / Data Center Fabric / Spine-Leaf

QFX5220: 32 ports of 400GbE in 1U, or 128 ports of 100GbE in 4U?

12.8 Tbps Broadcom Tomahawk 3 spine-and-leaf switch — QFX5220-32CD (1U, 32x 400GbE QSFP56-DD) and QFX5220-128C (4U, 128x 100GbE QSFP28), 64 MB buffer, Junos OS Evolved, for very large IP fabrics and metro.

Quick Take

Quick Take: The Juniper QFX5220 is a 12.8 Tbps Tomahawk 3 spine-and-leaf switch. The 1U QFX5220-32CD packs 32x 400GbE QSFP56-DD; the 4U QFX5220-128C packs 128x 100GbE QSFP28. Both run Junos OS Evolved with 64 MB buffer for large IP fabrics and metro..

Key extractable numbers

QFX5220 class specs on this page: 12.8 Tbps Tomahawk 3 fabric. The 1U QFX5220-32CD packs 32× 400GbE QSFP56-DD; the 4U QFX5220-128C packs 128× 100GbE QSFP28. Both run Junos OS Evolved with a 64 MB buffer framing for large IP fabrics and metro. Quote by SKU and optic code, not “QFX5220” alone.

Performance

Quick Answer: Both QFX5220 models deliver 12.8 Tbps of bandwidth (up to 25.6 Tbps bidirectional) and 8 billion packets per second on Tomahawk 3, with 64 MB of packet buffer. The 32CD provides 32x 400GbE; the 128C provides 128x 100GbE. Size the model on required port speed and radix, not headline capacity alone.

Figures follow the official Juniper QFX5220 datasheet and hardware guide. Confirm the Junos OS Evolved train, optics, and airflow direction on the quote. BENQUAN GLOBAL LIMITED supplies Juniper switching and optics. Related: Juniper QFX5120, Arista 7800R4, SKU Lookup. Request a quote.

Metric* QFX5220-32CD QFX5220-128C
Switch chipBroadcom Tomahawk 3Broadcom Tomahawk 3
Bandwidth12.8 Tbps12.8 Tbps
System throughputup to 25.6 Tbps (bidir)up to 25.6 Tbps (bidir)
Forwarding capacity8 Bpps8 Bpps
Port density32x 400GbE QSFP56-DD128x 100GbE QSFP28
Total packet buffer64 MB64 MB
Form factor1U4U

*Juniper QFX5220 datasheet. Confirm feature and scale limits against your Junos OS Evolved release (22.2R3-Sx and later recommended).

12.8T
Bandwidth
32×400G
32CD density
64MB
Packet buffer
8Bpps
Forwarding

Overview

Quick Answer: The QFX5220 is Juniper's 12.8 Tbps fixed spine-and-leaf platform on Broadcom Tomahawk 3. Two models cover different fabrics: the 32-port 400GbE 32CD for dense 400G spines, and the 128-port 100GbE 128C for high-radix 100G aggregation. Both run Junos OS Evolved and fit EVPN-VXLAN IP fabrics and metro designs.

The QFX5220 sits above the QFX5120 leaf class and below the modular QFX10000 and chassis platforms. It is a fixed 1U or 4U switch built for spine-and-leaf IP fabrics: the 32CD provides very dense 400G spine capacity, while the 128C maximizes 100G radix for aggregation. Junos OS Evolved brings a Linux-based, containerized control plane with EVPN-VXLAN, streaming telemetry, and programmability for automated data-center fabrics.

Sizing rule: Pick the model by port speed and radix — the 32CD for 400G spines and high-speed leaf, the 128C for high-density 100G aggregation — then size optics and breakout to your fabric, not on the shared 12.8 Tbps figure alone.

Hardware & Interfaces

Quick Answer: The 32CD is a 1U switch with 32x QSFP56-DD ports and dual 1600W PSUs; the 128C is a 4U switch with 128x QSFP28 ports and four 1600W PSUs. Both use an Intel Xeon D-1518 control plane, two 50 GB SSDs, and hot-swap fans with AFO airflow for redundancy, plus two SFP+ management ports.

Attribute QFX5220-32CD QFX5220-128C
Rack units1U4U
High-speed ports32x QSFP56-DD (400/200/100/50/40/25/10G)128x QSFP28 (100/40/25/10G)
Management ports2x SFP+ (10G)2x SFP+ (10G)
Operating systemJunos OS EvolvedJunos OS Evolved
CPUIntel Xeon D-1518Intel Xeon D-1518
Onboard SSD2x 50 GB2x 50 GB
Power supplies2x 1600W AC/DC (1+1)4x 1600W AC/DC (2+2)
CoolingAFO/AFI, hot-swap fansAFO, hot-swap fans
Weight~11.1 kg~44.4 kg
  • 32CD 400G ports channelize (for example 400G to 4x100G, or 100G to 4x25G/4x10G) with the right optics.
  • Both models offer AC or DC 1600W PSUs; the 32CD supports AFO and AFI airflow options.
  • Junos OS Evolved image stores on two internal 50 GB SSDs.

Use Cases

Quick Answer: The 32CD serves as a 400G spine or high-speed leaf in large EVPN-VXLAN IP fabrics; the 128C serves high-density 100G aggregation and metro roles. Pair either with QFX5120 leaf switches, and step to a modular chassis such as the Arista 7800R4 when a single fabric tier needs far more radix.

400G IP-fabric spine (32CD)

32x 400GbE builds a dense EVPN-VXLAN spine; breakout feeds 100G leaf uplinks across large data centers.

High-density 100G aggregation (128C)

128x 100GbE concentrates leaf uplinks and metro handoffs in a single 4U node with 64 MB buffer.

EVPN-VXLAN & metro fabrics

Junos OS Evolved brings EVPN-VXLAN, telemetry, and automation for programmable spine-and-leaf and metro designs.

Vs QFX5120 leaf and 7800R4

Pair with QFX5120 leaf; step to the modular Arista 7800R4 for far larger radix.

Buying Checklist

Quick Answer: Choose the model by port speed and radix — 32CD for 400G spines, 128C for 100G density. Then size optics and breakout (400G to 4x100G, 100G to 4x25G), power (AC or DC), airflow direction (AFO or AFI), and the Junos OS Evolved train and licensing. Confirm EVPN-VXLAN feature support before freezing the BOM.

  1. Model: QFX5220-32CD (400G) vs QFX5220-128C (100G density)
  2. Optics and breakout plan (400G to 4x100G, 100G to 4x25G/10G)
  3. AC vs DC 1600W power supplies
  4. Airflow direction: AFO (ports-to-FRUs) or AFI
  5. Junos OS Evolved train (22.2R3-Sx and later) and licensing
  6. EVPN-VXLAN and telemetry feature scale
  7. Rack space (1U vs 4U) and power budget
  8. Support term and spares

Search Juniper SKUs on SKU Lookup. For leaf pairing, see QFX5120 Specs & Use Cases.

Frequently Asked Questions

Quick Answer: Common questions cover the difference between the 32CD and 128C, bandwidth and buffer, supported port speeds, and where to source it. Choose the model by 400G versus 100G radix; confirm optics, airflow, and Junos on the quote. BENQUAN supplies the QFX5220-32CD and 128C.

The official QFX5220 datasheet is on juniper.net. This page is the RFQ table — 32CD 400G versus 128C 100G — so you size a Tomahawk 3 spine before opening that sheet. Confirm Junos OS Evolved and airflow on the quote.

Both are 12.8 Tbps Tomahawk 3 switches. The QFX5220-32CD is a 1U box with 32 ports of 400GbE QSFP56-DD for dense 400G spine-and-leaf fabrics; the QFX5220-128C is a 4U box with 128 ports of 100GbE QSFP28 for high-density 100G aggregation. Both run Junos OS Evolved with 64 MB of buffer.

The QFX5220 provides 12.8 Tbps of switching bandwidth (up to 25.6 Tbps bidirectional) and 8 billion packets per second of forwarding on the Broadcom Tomahawk 3 chip. Total packet buffer is 64 MB, split across two traffic managers, suitable for lossless IP-fabric and EVPN-VXLAN designs.

The QFX5220-32CD supports 400, 200, 100, 50, 40, 25, and 10GbE with breakout, so a 400G port can channelize to 4x100G or other speeds. The QFX5220-128C supports 100 and 40GbE, with 100G channelizable to 4x25G or 4x10G. Two dedicated SFP+ ports handle in-band management.

Contact info@benquan.hk or request a quote for a free BOM compatibility and delivery-risk review.

Key Takeaway

Key Takeaway: The Juniper QFX5220 is a 12.8 Tbps Tomahawk 3 spine-and-leaf platform — the 1U 32CD for 32x 400GbE spines and the 4U 128C for 128x 100GbE density — both on Junos OS Evolved with 64 MB buffer. Choose the model by port speed and radix. BENQUAN supplies the QFX5220 with competitive pricing.

Not sure your BOM is optimal?

If you are unsure whether your QFX5220 spine and optics BOM are optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents