Quick Take
Quick Take: QFX5120 is a four-model fixed 1U family built on Broadcom Trident3, every variant running the same Junos EVPN-VXLAN stack. The faceplate decides the role: 48Y and 48YM front 48 ports of 25G fiber, 48T switches to 10G copper, and 32C offers 32 ports of 100G for spine duty.
Model Comparison
Quick Answer: Four variants split by faceplate rather than feature set. The 48Y fronts 48 fiber ports at 25G with roughly 4 Tbps bidirectional throughput; the 48YM matches that density and adds MACsec; the 48T swaps to RJ45 copper at 10G and 2.16 Tbps; the 32C fields 32 QSFP28 cages at 6.4 Tbps for spine roles.
Figures follow Juniper QFX5120 datasheets. Confirm Junos license tier, airflow, and optics on the quote. BENQUAN GLOBAL LIMITED supplies Juniper switches and support. Related: Cisco Nexus 9300, Arista 7050X3 / 7280R3, HPE–Juniper price note, SKU Lookup. Request a quote.
| Model | Ports | Switching (bidirectional) | Role |
|---|---|---|---|
| QFX5120-48Y | 48×1/10/25G + 8×40/100G | ~4 Tbps / 2 Bpps | Primary 25G leaf |
| QFX5120-48YM | Same density class + MACsec focus | ~4 Tbps / 2 Bpps | Secure leaf variants |
| QFX5120-48T | 48×1/10G RJ45 + 6×40/100G | ~2.16 Tbps / 1 Bpps | Copper leaf |
| QFX5120-32C | 32×40/100G QSFP28 | ~6.4 Tbps / 2 Bpps | Spine / collapsed spine / breakout leaf |
32C ports can channelize to 4×10/25G (or 2×50G) on supported ports for denser server access — confirm breakout optics and port map.
Overview
Quick Answer: Broadcom Trident3 fixed 1U platforms with cut-through or store-and-forward, ~800 ns latency class, 32 MB buffer, and Junos L2/L3 + EVPN-VXLAN feature depth. Leaf default = QFX5120-48Y (48×25G + 8×100G, ~4 Tbps bi-dir). Spine / dense 100G = QFX5120-32C (32×100G, ~6.4 Tbps bi-dir).
Fabric Roles
Quick Answer: An IP Clos underlay carries EVPN-VXLAN overlays, with MC-LAG or ESI-LAG dual-homing and 64-way ECMP. Put 48Y, 48YM or 48T at the server and storage edge, and 32C above them; Juniper documents roughly 1500 access ports from a three-stage build. Collapsing both tiers onto one pair suits smaller rooms.
- Leaf: 48Y/48YM/48T to servers and storage NICs
- Spine: 32C in small/medium DC (datasheet cites ~1500 server access ports in 3-stage Clos examples)
- Collapsed spine: 48Y + 32C ESI-LAG designs
- Campus distribution: 32C as high-speed aggregation where Junos is standard
Use Cases
Quick Answer: Juniper-centric DC refreshes, EVPN fabrics, and multi-vendor leaf where Junos ops skill already exists. QFX5120-48Y under 100G spines with dual PSU and matching airflow. QFX5120-32C for mid-size Clos without modular chassis. ACI/NX-OS → Nexus 9300. EOS leaf/spine → Arista 7050X3 / 7280R3.
25G server leaf
QFX5120-48Y under 100G spines with dual PSU and matching airflow.
Compact 100G spine
QFX5120-32C for mid-size Clos without modular chassis.
Vs Nexus / Arista
ACI/NX-OS → Nexus 9300. EOS leaf/spine → Arista 7050X3 / 7280R3.
Buying Checklist
Quick Answer: Fix the role before the part number: leaf or spine decides the model, and the model decides optics. Budget for Junos feature licensing on top of hardware, match breakout cables to the port map, and specify airflow direction plus dual power supplies. Settle the support term at quote time, not after delivery.
- 48Y / 48T / 32C port mix
- EVPN-VXLAN and advanced Junos feature licenses
- SFP28 / QSFP28 optics and breakout cables
- Redundant PSU and fan airflow direction
- Apstra / Mist / Contrail tooling if used
- Juniper Care / support term
Search Juniper parts on SKU Lookup.
Which Part Numbers Should You Freeze on the RFQ (1 SKUs)?
Quick Answer: When quoting QFX5120-32C-AFO and sibling configurations across these 1 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.
| Ordering SKU | Key Configuration & Boundary | Adjacent BOM Lines to Freeze |
|---|---|---|
QFX5120-32C-AFO | 32x100G 1U, AFO front-to-back, ~6.4 Tbps bi-dir. Not 48Y or AFI. Write license and optics. | S-QFX5K-C2-A2-P, QSFP28 SKU x count, 10G optics x2 if drawn, AFO vs AFI |
Frequently Asked Questions
Quick Answer: Three questions decide most QFX5120 orders: generation, encryption, and sourcing. Stay on this platform while 25G access with 100G uplinks meets the design; move to QFX5130 only when 400G is genuinely required. If link encryption is mandatory, name the 48YM explicitly, because MACsec is not uniform across the family.
Juniper publishes QFX5120 specs on juniper.net. This page is the RFQ table — 48Y / 32C / 48YM SKUs — so you size a 25G leaf before opening that page. Confirm Junos train and MACsec (48YM) on the quote.
5130 is a newer higher-bandwidth generation (400G-class options). Stay on 5120 when 25G/100G Trident3 designs fit; step up when 400G leaf/spine is required.
48YM and selected SKUs emphasize MACsec — confirm the exact model if link encryption is mandatory.
Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: Default to QFX5120-48Y for 25G server access beneath 100G spines, and pick 32C when you need a compact spine or a breakout leaf. Name the 48YM on the purchase order if MACsec is mandatory, price Junos feature licensing separately from hardware, and leave QFX5130 for designs that genuinely need 400G.