Juniper · MX304

MX304-PREM

Brand Juniper Family MX304 Form 2U Trio 6, 2 RE + LMIC slots Next Lookup / RFQ

How do I freeze MX304-PREM on one RFQ?

2U MX304 premium chassis: two Routing Engines, three fan trays, two PSUs. Scale is the LMIC count — each MX304-LMIC16-BASE is 1.6T (16x100G / 4x400G), three cards reach 4.8 Tbps. Channel labels MX304-PREMIUM3-AC / -ECM wrap this PREM bundle. Not MX204, not MX304-BASE (1 RE). Empty LMIC slots are empty. No list or net on this page.

Quick Take

Quick Take: MX304-PREM is Juniper’s premium MX304 chassis bundle: two Routing Engines, three fan trays, two power supplies. The platform is 2U Trio 6 and scales to 4.8 Tbps with three MX304-LMIC16-BASE cards (each 16x100GbE / 4x400GbE, 1.6T). Channel cells named MX304-PREMIUM3-AC or MX304-PREMIUM3-AC-ECM still freeze as MX304-PREM. It is not MX204 and not MX304-BASE (one RE).

What MX304-PREM is

Quick Answer: Freeze MX304-PREM as the 2-RE chassis, then count LMIC16 cards. One LMIC16 is 1.6T, not the 4.8T ceiling. A third LMIC uses an RE slot — write 2 RE + 2 LMIC vs 1 RE + 3 LMIC. ECM on this RFQ is a channel wrap (extended cable manager style on larger MX), not a second router. Optics sit on the LMIC, not on PREM.

Typical scene: an edge brief already printed MX304-PREMIUM3-AC and one MX304-LMIC16-BASE. The trap is quoting MX204 because both say MX, ranking the chassis as 4.8 Tbps with one card installed, or treating PREMIUM3-AC-ECM as a different PID. Empty LMIC slots and empty QSFP cages are empty.

Public part numbers belong on the RFQ. Quote list, net, discount percent, and totals do not belong on this page. If a seller pastes a channel number into chat, treat it as industry estimate / pending confirmation until the formal brief comes back.

Family pages still matter for the ladder. This page answers one question: how to freeze MX304-PREM without mixing a different class onto the same column. Related family reading: MX204-HW-BASE (1U 400G, not this chassis).

Specifications

Quick Answer: Published MX304-PREM facts: 2U, Trio 6, 2 REs + 3 fans + 2 PSUs, up to three LMIC16 (1.6T each) for 4.8 Tbps, up to 12x400G or 48x100G at full fill. Channel net stays pending confirmation. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.

MPN
MX304-PREM
Channel wrap
PREMIUM3-AC / -ECM
Form
2U Trio 6
REs
2 (PREM); BASE is 1 RE
LMIC
MX304-LMIC16-BASE 1.6T each
Ceiling
4.8 Tbps with 3 LMICs
Not this SKU
MX204-HW-BASE
Not this SKU
MX304-BASE (1 RE)

Ceiling numbers follow the MX304 datasheet and hardware guide. PREM is the chassis; LMIC16-BASE is a separate line. One quoted LMIC does not fill three slots. Write AC vs DC PSU, LMIC count, and optics SKU x count.

Numbers without a unit on a seller slide are not specs. Gbps, watts, session counts, and years must travel with the MPN. If your PAN-OS, IOS XE, or firmware train differs from the cited datasheet generation, write that train on the RFQ instead of copying a screenshot.

Fit / Unfit

Quick Answer: Use MX304-PREM when the brief named MX304 premium / PREMIUM3-AC. Use MX304-BASE only for a single-RE build. Use MX204-HW-BASE for the 1U 400 Gbps fixed MX. Count LMIC16 cards before anyone ranks 4.8 Tbps. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.

Fit

  • 2U MX304 RFQ that named PREM / PREMIUM3-AC / ECM
  • Need Trio 6 with 100G/400G LMIC16, not a fixed MX204
  • LMIC count, optics, and RE redundancy written as lines
  • Honest MX204-HW-BASE column only as a second SKU

Do not use it as

  • A silent substitute for MX204-HW-BASE (1U 400 Gbps)
  • A silent substitute for MX304-BASE (one Routing Engine)
  • One LMIC16 counted as the 4.8 Tbps three-card ceiling
  • PREMIUM3-AC-ECM counted as a different chassis PID

Fit/unfit is the decision tree for MX304-PREM. If the site sits on the boundary, keep this MPN on its own line and add the step-up MPN as a second column with equal assumptions. Do not hide both in one “or equivalent” cell.

Typical RFQ scene

Quick Answer: Typical scene: an edge brief already printed MX304-PREMIUM3-AC and one MX304-LMIC16-BASE. The trap is quoting MX204 because both say MX, ranking the chassis as 4.8 Tbps with one card installed, or treating PREMIUM3-AC-ECM as a different PID. Empty LMIC slots and empty QSFP cages are empty.

Label this as a typical scene, not a named customer. The MPN is already on the sheet. The cost of leaving adjacent lines blank is a dead on-site: missing optics, missing HA peer, or a stack that will not form. Write those lines before anyone ranks a discount.

If a second brand sits on the same workbook, keep MX304-PREM on its own column with equal threat, session, or stack assumptions. “Or equivalent” cells hide the fork this page exists to freeze.

Ordering lines

Quick Answer: Hardware MPN is public. Subscriptions, support, optics, and HA peers are separate lines. This table names the rows — it does not publish prices. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.

Industry estimate / pending confirmation. Public pages never show negotiated net.

LineSKU to freezeWhy it sits on the RFQ
ChassisMX304-PREM2 RE; not MX304-BASE
LMICMX304-LMIC16-BASE x count1.6T each; max 3
OpticsQSFP28/QSFP56-DD x countOn the LMIC, not PREM
PowerAC vs DC / HVACTwo PSUs on PREM
Channel wrapPREMIUM3-AC / ECMSame PREM, copy the letter

Copy MX304-PREM with the copy control in the hero if you are pasting into a spreadsheet. Adjacent lines that are support-only SKUs do not get their own article in this batch; they stay on this table.

How to RFQ MX304-PREM

Quick Answer: Send one brief: MPN MX304-PREM, quantity, HA, software train, adjacent optics or licenses, support years, and delivery week. Equalize a second vendor column before you rank. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.

  1. Step 1. Copy MX304-PREM — not a family nickname.
  2. Step 2. Write quantity and HA. Two-node means two hardware lines.
  3. Step 3. Add optics, modules, and subscription years from the drawing.
  4. Step 4. If a peer vendor sits on the sheet, equalize threat/SSL or stack rules.
  5. Step 5. Submit on rfq.html?intent=bom-risk.

Do not attach a customer quote PDF to a public ticket that will be mirrored onto a website. Strip prices before any file leaves the mail thread into HTML.

Worldwide shipping and free-port staging are BQ motions. They are not a promise of stock on this page. Lead time stays on the RFQ as pending confirmation.

FAQ

Quick Answer: MX304-PREM is one hardware MPN. Family datasheets stay on the series page. This page freezes the RFQ row without publishing quote prices. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.

No. MX304 is a 2U Trio 6 platform with LMIC16 cards. MX204 is a 1U 400 Gbps fixed router. Parts do not drop in.

No. MX304-PREM is two REs plus fans and PSUs. Each MX304-LMIC16-BASE is a separate 1.6T line.

Quote list, net, and discount stay off public pages. Channel figures are industry estimate / pending confirmation on the RFQ.

References

Quick Answer: Specs on this page follow vendor datasheets and hardware references. Open those URLs for the PDF generation you are quoting. Standalone BENQUAN family articles sit under Related, not here. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.

Key Takeaway

Key Takeaway: Freeze MX304-PREM as the 2U two-RE MX304 chassis, then write LMIC16 count and optics. Do not paste MX204 or rank one card as 4.8 Tbps. BENQUAN GLOBAL LIMITED supplies MX304-PREM with competitive pricing and configuration support. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.

Need lead time for MX304-PREM?

If quantity, HA, or delivery week are ready, send one BOM-risk brief. Do not paste quote prices into this page.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents