Quick Take
Quick Take: MX204-HW-BASE is Juniper’s integrated 1U MX204 ordering SKU: chassis with three fan trays and two power supplies, base hardware plus standard Junos software, perpetual. Datasheet: 400 Gbps, eight 10GbE SFP+ and four rate-selectable 40/100GbE QSFP28 ports (breakout 4x10G). It is not MX304, not MX240, and not the Flex SKU MX204-HWBASE-AC-FS where feature RTU is ordered separately.
What MX204-HW-BASE is
Quick Answer: Freeze MX204-HW-BASE as a 400 Gbps 1U fixed router, not a smaller MX304. Empty QSFP/SFP+ cages are not LR4. JPSU-650W-AC-AO-BB, JNP204-CHAS-BB, and JNP-FAN-1RU-BB are included-base rows on many CTOs — do not open a second article. CBL-EX-PWR-C13-EU is a cord line. Do not paste MX304-PREM onto this column.
Typical scene: a metro-edge brief already printed MX204-HW-BASE. The trap is quoting MX304 because both say MX, treating 32 extra LR4 as if they sat on this faceplate, or ranking a 1U QFX5120 as the same Junos box. Dual 650 W AFO PSUs and three fans ship with the base SKU; optics do not.
Public part numbers belong on the RFQ. Quote list, net, discount percent, and totals do not belong on this page. If a seller pastes a channel number into chat, treat it as industry estimate / pending confirmation until the formal brief comes back.
Family pages still matter for the ladder. This page answers one question: how to freeze MX204-HW-BASE without mixing a different class onto the same column. Related family reading: MX304-PREM (2U Trio 6, not this 1U).
Specifications
Quick Answer: Published MX204-HW-BASE facts: 1U, 400 Gbps, 8x10G SFP+ + 4x40/100G QSFP28, 3 fan trays, 2 PSUs, standard Junos perpetual on the HW-BASE SKU. Channel net stays pending confirmation. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.
- MPN
- MX204-HW-BASE
- Form
- 1U fixed MX204
- Ports
- 8x10G SFP+ + 4x40/100G QSFP28
- Throughput
- 400 Gbps class
- Cooling / PSU
- 3 fans + 2x 650 W class
- Software
- Standard Junos, perpetual (BASE)
- Not this SKU
- MX304-PREM / MX240
- Not this SKU
- MX204-HWBASE-AC-FS Flex
Ceiling numbers follow the MX204/240/480/960 series datasheet and MX204 hardware guide. HW-BASE names chassis plus standard Junos, not a populated optic set. Write QSFP28/SFP+ SKU x count and power-cord region.
Numbers without a unit on a seller slide are not specs. Gbps, watts, session counts, and years must travel with the MPN. If your PAN-OS, IOS XE, or firmware train differs from the cited datasheet generation, write that train on the RFQ instead of copying a screenshot.
Fit / Unfit
Quick Answer: Use MX204-HW-BASE when the brief named the 1U 400 Gbps MX204. Use MX304-PREM when you need 2U Trio 6 and LMIC16. Use HWBASE-AC-FS only when Flex/R-mode RTU is the commercial path. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.
Fit
- 1U 400 Gbps edge RFQ that named MX204-HW-BASE
- Need 8x10G plus 4x100G on a fixed MX
- Optics, cord, and Junos train written as lines
- Honest MX304-PREM column only as a second SKU
Do not use it as
- A silent substitute for MX304-PREM (2U, up to 4.8 Tbps)
- A silent substitute for MX204-HWBASE-AC-FS Flex
- Empty QSFP cages counted as 100G LR4
- A chassis-BB / fan / PSU spare counted as a second router
Fit/unfit is the decision tree for MX204-HW-BASE. If the site sits on the boundary, keep this MPN on its own line and add the step-up MPN as a second column with equal assumptions. Do not hide both in one “or equivalent” cell.
Typical RFQ scene
Quick Answer: Typical scene: a metro-edge brief already printed MX204-HW-BASE. The trap is quoting MX304 because both say MX, treating 32 extra LR4 as if they sat on this faceplate, or ranking a 1U QFX5120 as the same Junos box. Dual 650 W AFO PSUs and three fans ship with the base SKU; optics do not.
Label this as a typical scene, not a named customer. The MPN is already on the sheet. The cost of leaving adjacent lines blank is a dead on-site: missing optics, missing HA peer, or a stack that will not form. Write those lines before anyone ranks a discount.
If a second brand sits on the same workbook, keep MX204-HW-BASE on its own column with equal threat, session, or stack assumptions. “Or equivalent” cells hide the fork this page exists to freeze.
Ordering lines
Quick Answer: Hardware MPN is public. Subscriptions, support, optics, and HA peers are separate lines. This table names the rows — it does not publish prices. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.
Industry estimate / pending confirmation. Public pages never show negotiated net.
| Line | SKU to freeze | Why it sits on the RFQ |
|---|---|---|
| Router | MX204-HW-BASE | 1U 400G, not MX304 |
| Optics 100G | QSFP-100G SKU x count | Four cages max on this face |
| Optics 10G | SFP+ SKU x count | Eight cages |
| Cord | CBL-EX-PWR-C13-xx | Region, not implied |
| Not Flex | Do not swap HWBASE-AC-FS | RTU path is different |
Copy MX204-HW-BASE with the copy control in the hero if you are pasting into a spreadsheet. Adjacent lines that are support-only SKUs do not get their own article in this batch; they stay on this table.
How to RFQ MX204-HW-BASE
Quick Answer: Send one brief: MPN MX204-HW-BASE, quantity, HA, software train, adjacent optics or licenses, support years, and delivery week. Equalize a second vendor column before you rank. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.
- Step 1. Copy MX204-HW-BASE — not a family nickname.
- Step 2. Write quantity and HA. Two-node means two hardware lines.
- Step 3. Add optics, modules, and subscription years from the drawing.
- Step 4. If a peer vendor sits on the sheet, equalize threat/SSL or stack rules.
- Step 5. Submit on rfq.html?intent=bom-risk.
Do not attach a customer quote PDF to a public ticket that will be mirrored onto a website. Strip prices before any file leaves the mail thread into HTML.
Worldwide shipping and free-port staging are BQ motions. They are not a promise of stock on this page. Lead time stays on the RFQ as pending confirmation.
FAQ
Quick Answer: MX204-HW-BASE is one hardware MPN. Family datasheets stay on the series page. This page freezes the RFQ row without publishing quote prices. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.
No. MX204 is a 1U 400 Gbps fixed router. MX304 is a 2U Trio 6 platform with LMIC16 cards up to 4.8 Tbps.
MX204-HW-BASE already includes three fan trays and two PSUs. Spare JPSU / fan / chassis-BB rows are not a second router.
Quote list, net, and discount stay off public pages. Channel figures are industry estimate / pending confirmation on the RFQ.
References
Quick Answer: Specs on this page follow vendor datasheets and hardware references. Open those URLs for the PDF generation you are quoting. Standalone BENQUAN family articles sit under Related, not here. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.
Key Takeaway
Key Takeaway: Freeze MX204-HW-BASE as the 1U 400 Gbps MX204 with standard Junos perpetual, then write optics and cords. Do not paste MX304-PREM. BENQUAN GLOBAL LIMITED supplies MX204-HW-BASE with competitive pricing and configuration support. Confirm quantity, HA, software train, and support years on the same brief before you freeze CapEx. Channel net stays pending confirmation.