Servers / Inspur IEIT / Scale-Up / RFQ

How do you order an Inspur TS860G7 without mixing a 4-socket and an 8-socket BOM?

Write 4S or 8S on line 1. Memory speed and GPU slots change with that choice.

Quick Take

Quick Take: Write 4-socket or 8-socket on line 1. Eight CPUs can reach 480 cores and 128 DIMMs, but 2 DPC drops memory to 4400 MT/s. A GPU row replaces half of the FHHL slots RFQ with exact SKUs for accurate pricing.

A TS860G7 without a socket count is not an order. Four-socket and eight-socket are different CapEx trees.

What an Inspur / IEIT TS860G7 Quote Is

Quick Answer: The TS860G7 is a 6U rack server from IEIT SYSTEMS (Inspur) for four or eight 4th Gen Intel Xeon Scalable CPUs. It targets large transaction databases, SAP HANA, ERP, and dense virtualization — not a Xeon 6 refresh, and not a rebrand of another OEM.

Buyers often ask for “one big box” when the real fork is single-OS scale-up versus several 2-socket hosts. Write that fork before anyone prices GPUs.

Fit: one large HANA or OLTP image that must stay in a single OS.

Unfit: a scale-out VM farm that is cheaper on several 2-socket servers once licensing is honest.

Published Specs You Can Freeze

Quick Answer: 6U, 4 or 8 sockets, up to 480 cores, up to 128 DDR5 DIMMs, up to 24 × 2.5-inch drives, 16 FHHL PCIe 5.0 x16 (or GPU tradeoffs), 4× CRPS PSUs, full config under 97 kg.

ItemPublished figureBuyer note
Form factor6U rack4 or 8 sockets
CPU4th Gen Xeon ScalableUp to 480 cores; TDP up to 350 W; C741 chipset
UPI4 links per CPU up to 16 GT/sScale-up fabric
MemoryUp to 128 DDR5 RDIMM / 3DS16 DIMMs/CPU; 4800 MT/s 1 DPC; 4400 MT/s 2 DPC
DrivesUp to 24 × 2.5" SAS/SATA/NVMeICM: 2× M.2; up to 2 SAS/RAID/trimode
NIC / OCPUp to 4 hot-swap PCIe 5.0 x16 SFF OCP 3.0Multi-host OCP; NC-SI
Slots16× FHHL x16 — or GPU maps8 FHHL + 4 dual-width GPU, or 8 single-width GPU
Cooling / PSU8 hot-swap dual-rotor N+1; 4× CRPS 1300–2700 WPlatinum or Titanium; N+M with M≤N
Size / weight482 × 263.2 × 870 mm with ears; <97 kg fullInlet 5°C–45°C per white paper envelope
Management / OSIPMI, SNMP, Redfish, TPM 2.0, BMC/BIOS redundancyWindows Server, RHEL, SLES named

SPEC example (one published test, not a default SKU): 8× Xeon Platinum 8490H (60 cores each = 480 cores / 960 threads), 2 TB RAM as 64× 32 GB DDR5-4800, 1× 3.2 TB NVMe, SPECrate 2017_int_peak 3750. Do not treat 8490H as the only CPU.

4-Socket vs 8-Socket — Same Product Name, Different Order

Quick Answer: Both are orderable. Socket count changes core count, DIMM count, power, and often licensing. A quote that says only “TS860G7” without 4 or 8 is incomplete.

Dimension4-socket order8-socket order
Line 1 labelTS860G7 4STS860G7 8S
Core headroomLower ceilingUp to 480 cores on published max path
DIMM headroomUp to 64 DIMMs if 16/CPUUp to 128 DIMMs
Field upgrade myth“Add 4 later” needs written rightsDo not assume empty sockets are free
Peer checkOften vs two 2S hostsOften vs four 2S hosts — license math first

GPU Slot and Memory Population Tradeoffs

Quick Answer: GPU rows trade away FHHL slots. Filling DIMMs to 2 DPC drops rated speed from 4800 MT/s to 4400 MT/s. Write both decisions before CapEx.

  • Slot maps: 16× FHHL PCIe 5.0 x16, or 8× FHHL plus 4× dual-width GPUs, or 8× single-width GPUs.
  • 1 DPC vs 2 DPC: 4800 MT/s at 1 DPC; 4400 MT/s at 2 DPC — capacity versus speed is a written choice.
  • OCP: up to four hot-swap SFF OCP 3.0 adapters; multi-host OCP supported.
  • Power: four CRPS units at 1300 / 1600 / 2000 / 2700 W class with N+M (M≤N).

Vendor RAS claim

IEIT publicly describes RAS goals including a 99.999% availability claim on its own channels. Treat that as the vendor’s claim — not an independent measurement from BENQUAN.

How to Check a TS860G7 RFQ Before You Compare It with Two 2-Socket Servers

Quick Answer: Write socket count, freeze DIMM population rules, map GPU versus FHHL slots, itemize OCP/PSU/weight, then compare to multi-host scale-out only after licensing math is honest.

  1. Step 1 — Write socket count on line 1. State 4-socket or 8-socket explicitly. Do not leave “TS860G7” without a socket count.
  2. Step 2 — Freeze DIMM population rules. Up to 128 DDR5 RDIMM / 3DS RDIMM. 16 DIMMs per CPU. 4800 MT/s at 1 DPC; 4400 MT/s at 2 DPC.
  3. Step 3 — Map GPU vs FHHL slots. Pick one map: 16× FHHL, or 8× FHHL + 4× dual-width GPU, or 8× single-width GPU.
  4. Step 4 — Itemize OCP, PSU, and weight. Up to 4 hot-swap OCP 3.0; 4× CRPS 1300–2700 W N+M; full config under 97 kg.
  5. Step 5 — Compare to multi-host scale-out only after licensing math. Write whether software licenses are per socket, per core, or per OS image before you claim two 2-socket servers are cheaper.

Use SKU Lookup, then rfq.html. BENQUAN supplies Inspur / IEIT TS860G7 packages with Worldwide Shipping after socket count and DIMM rules are frozen. Do not invent order codes — keep to public model names.

Real-World Deployment Scenarios

Quick Answer: Three scenes: a single-image HANA box that needs eight sockets, a 4-to-8 “field upgrade” assumption that was never licensed, and a GPU row that silently deleted FHHL NICs.

1) Single-OS HANA / OLTP image

Architecture needs one large memory domain. Eight sockets and a 1 DPC memory plan keep speed at 4800 MT/s. The RFQ writes 8S on line 1 and rejects a vague “TS860G7” label.

2) Start-at-4S upgrade myth

Finance buys four CPUs “for now.” Ops assumes four empty sockets populate later. Without written chassis rights, the upgrade path dies. Ask before you assume field upgrade.

3) GPU row vs network slots

A quote adds four dual-width GPUs and keeps sixteen FHHL NIC lines. That map does not exist. Pick the GPU tradeoff table and rewrite OCP/FHHL lines before CapEx.

Frequently Asked Questions

Quick Answer: Not Xeon 6. Socket upgrades need written rights. Up to 24 × 2.5-inch drives. SPEC’s 8490H run is a benchmark config, not a default SKU.

No. It uses 4th Gen Intel Xeon Scalable (Sapphire Rapids).

Only if the quote and the chassis license say the empty sockets are populated later. Ask before you assume field upgrade.

Up to 24 × 2.5-inch SAS/SATA/NVMe. ICM holds 2× M.2 SATA or NVMe.

Eight Platinum 8490H CPUs and 2 TB RAM as one published SPECrate 2017_int_peak 3750 run. That is a benchmark config, not the only orderable build.

References

Quick Answer: Cite IEIT’s product page, the SPEC CPU2017 disclosure, and IEIT’s RAS news note so socket, DIMM, and vendor claims stay attributed.

Key Takeaway

Key Takeaway: Write 4-socket or 8-socket on line 1, freeze 1 DPC versus 2 DPC memory speed, and pick one GPU versus FHHL map. Compare to multi-host scale-out only after licensing math is honest. BENQUAN supplies Inspur / IEIT TS860G7 with Worldwide Shipping after the brief is clean.

Not sure your TS860G7 BOM is optimal?

If socket count, DIMM population, or GPU versus FHHL tradeoffs are unclear, click below for a free compatibility and delivery risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents