Quick Take
Quick Take: Inside Infortrend EonStor GS, choose the media track before the model number: U.2 NVMe for AI/HPC peaks, SAS SSD for enterprise flash, dense HDD for sequential capacity. Then pick the 1000–5000 tier and expansion enclosures Evaluate based on workload and growth projections.
When the Family Ladder Matters
Quick Answer: Use the Infortrend EonStor GS family ladder when the brand is already chosen and the open question is which media track and model tier to quote. It does not help while you are still choosing between EonStor GS, NetApp AFF, and Dell PowerStore, which is a separate cross-vendor decision.
*Vendor guidance commonly caps scale-out at four GS appliances — confirm current limits on the RFQ.
- Use this page: Size GS 1000/2000/3000/4000/5000 classes across U.2, SAS SSD, and HDD tracks.
- Peer brands: GS vs AFF · GS vs PowerStore
- Flagship deep dive: GS 5024U specs
Three Media Tracks
Quick Answer: The Infortrend EonStor GS family splits into three media tracks: U.2 NVMe hybrid flash, SAS solid-state hybrid flash, and SAS hard disk capacity systems. Choose the track from latency and density requirements before arguing about 1000 through 5000 tier numbers, because the track constrains every later line item.
| Track | Typical models | Best fit |
|---|---|---|
| U.2 NVMe | GS 5000U / 5024U, 4000U, 3000UT, 3000U, 2000U | AI/HPC, low-latency unified, QLC capacity options |
| SAS SSD | GS 4000B / 3000B / 2000B / 1000B G3 | Enterprise IOPS/throughput without U.2 fabric |
| SAS HDD | GS 5000 (4U90), 4000 G3, 3000 G3, 2000, 1000 G3 | Dense capacity, sequential HPC/M&E, archive-adjacent |
U.2 NVMe Ladder
Quick Answer: Inside the Infortrend EonStor GS U.2 NVMe ladder, the flagship GS 5000U and 5024U target peak artificial intelligence and high-performance computing throughput, the 4000U and 3000UT handle high input/output mid-tier work, and the 3000U and 2000U prioritize cost-effective U.2 capacity with hybrid tiering.
| Tier | Vendor positioning | RFQ notes |
|---|---|---|
| GS 5000U / 5024U | Up to ~125 GB/s and ~2.4M IOPS (published peaks) | AI/HPC; 200GbE / GPUDirect adjacency; PoC peaks |
| GS 4000U / 3000UT | Up to ~1.1M IOPS / ~24 GB/s class (published) | 2U24 or 4U48; mid high-perf unified |
| JB 4000U expansion | U.2 JBOF; dual-controller expansion throughput claims | Itemize enclosure count separately from head |
| GS 3000U / 2000U | Cost-effective U.2 + hybrid / data reduction messaging | Capacity-hungry with SSD hot tier |
HDD Dense & SAS SSD Tracks
Quick Answer: Infortrend EonStor GS 5000 four-rack-unit 90-bay hard disk systems publish high sequential throughput for high-performance computing and media density, the G3 midrange covers many bay counts, and the SAS solid-state B models target enterprise input/output without moving to a U.2 NVMe platform.
- GS 5000 HDD: High-density 4U 90-bay; vendor throughput claims around 45 GB/s class for sequential workloads.
- GS 4000 G3 / 3000 G3: Broad form factors (2U12 through 4U60/90) on Xeon-D class platforms — size bay count to growth, not brochure max.
- GS 2000 / 1000 G3: Entry unified SAN/NAS for light workloads — do not peer to 5000U AI builds.
- SAS SSD B-series: Up to ~900K IOPS / ~11 GB/s read class claims; smart SSD lifespan tooling — equalize against U.2 only when latency tiers match.
Scale-up, Scale-out & HA
Quick Answer: Plan Infortrend EonStor GS scale-up with expansion enclosures for drive count, and scale-out by adding GS appliances into a cluster, where vendor guidance commonly caps the node count at four. Active-active block high availability and remote replication are separate design and part-number choices, so list them explicitly.
Family RFQ switches
- Media track first (U.2 / SAS SSD / HDD)
- Form factor / bay count second
- Host boards third (FC vs 25/100/200GbE)
- Scale-out node count and single-namespace needs
- Auto-tiering / SSD cache / compression / dedupe on or off
- Immutable / WORM / backup-server features if ransomware scope exists
RFQ Checklist — Pick One Track Cleanly
Quick Answer: Write one Infortrend EonStor GS brief naming the media track, model tier, bay count, host boards, expansion enclosures, scale-out node count, and high-availability or replication needs. Add optional NetApp AFF or Dell PowerStore peer lines only after the GS configuration itself is frozen, otherwise the columns drift apart.
What to put on the RFQ
- Track: U.2 NVMe / SAS SSD / SAS HDD
- Model tier: 1000 / 2000 / 3000 / 4000 / 5000 (and U/B/G3/UT suffixes)
- Form factor and drive population; TLC vs QLC vs HDD RPM/size
- Expansion enclosures (JB 4000U or HDD JBOD) with quantities
- Scale-out: number of GS appliances (1–4 per vendor guidance)
- Host boards and optics; protocol list
- HA / remote replication / cloud tier requirements
- Data services: tiering, compression, dedupe, immutable backup
- Support years; install services
BENQUAN GLOBAL LIMITED supplies Infortrend EonStor GS across U.2, SAS SSD, and HDD tracks with configuration support worldwide. Submit the family brief on rfq.html.
Which Part Numbers Should You Freeze on the RFQ (2 SKUs)?
Quick Answer: When quoting GS 4012 G3 and sibling configurations across these 2 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.
| Ordering SKU | Key Configuration & Boundary | Adjacent BOM Lines to Freeze |
|---|---|---|
GS 4012 G3 | 2U 12-bay, Xeon D, SAN/NAS, S vs R controllers, host boards and drives as extra lines. Not 4024 G3 or 5024U. | GS 4012 G3 / GS4012R3 or S3, SAS/SATA/SSD per drawing, FC / 25GbE / 100GbE slots, DDR4 to the drawn GB |
GS 4024 G3 | 4U 24-bay, Xeon D, SAN/NAS, R vs S controllers, host boards and drives as extra lines. Not 4012 G3 or 5024U. | GS 4024 G3 / GS4024R3 or S3, SAS/SATA/SSD per drawing, FC / 25GbE / 100GbE slots, DDR4 to the drawn GB |
Frequently Asked Questions
Quick Answer: Inside the Infortrend EonStor GS family, choose the U.2 NVMe, SAS solid-state, or hard disk track before model numbers. The flagship 5000U and 5024U serve artificial intelligence and high-performance computing peaks; entry 1000 and 2000 models are not peers. Freeze track and tier, then dual-source against NetApp AFF or Dell PowerStore if the brand remains open.
Pick media track first (U.2, SAS SSD, or HDD), then tier. GS 5024U/5000U for AI/HPC peaks; mid 3000/4000 for balanced unified; 1000/2000 for entry.
5024U is the flagship U.2 configuration in the 5000U performance class. Confirm exact SKU, cache, and host boards on the quote.
Yes — that is the hybrid story. Keep hot/cold tiers explicit so usable performance is not confused with raw PB.
Submit track, tier, expansions, and host boards on one RFQ.
Key Takeaway
Key Takeaway: The EonStor GS family is three media tracks sharing one management story — not one interchangeable SKU ladder. Freeze U.2, SAS SSD, or HDD first, then tier and expansions. BENQUAN GLOBAL LIMITED supplies Infortrend EonStor GS with competitive pricing and configuration support for global buyers.