Quick Take
Quick Take: Infortrend EonStor GS 5024U is a 2U 24-bay U.2 NVMe hybrid flash array aimed at AI/HPC — vendor claims up to 125 GB/s, 2.4M IOPS, and hybrid scale to multi-PB. Treat brochure peaks as lab ceilings; equalize usable TB, protocols, and HA against AFF or PowerStore on one RFQ.
Core Specs (Vendor-Published)
Quick Answer: The Infortrend EonStor GS 5024U is a dual-controller, two-rack-unit, 24-bay U.2 NVMe system using an Intel Xeon 6 processor in a 16-core class, DDR5 cache from 128 GB by default up to 1024 GB, PCIe 5.0 solid-state support, and host options spanning 32 Gb Fibre Channel through 200 Gb Ethernet with RDMA.
| Item | GS 5024U (published) |
|---|---|
| Form factor | 2U, 24-bay |
| Controllers | Dual redundant |
| CPU | Intel Xeon 6, 16-core (GS 5024U) |
| Cache memory | DDR5, default 128 GB, up to 1024 GB |
| Cache backup | Super capacitor + flash module |
| Drive type (base) | 2.5" U.2 NVMe SSD (PCIe 5.0 support) |
| Block read throughput (vendor) | Up to 125 GB/s |
| IOPS (vendor) | Up to 2.4 million |
| Latency (vendor) | As low as ~0.3 ms (stated peak conditions) |
| Base capacity (vendor) | Up to ~1.4 PB with 24 U.2 NVMe SSDs |
| RAID options | 0, 1, 3, 5/5F, 6/6F, 10, 30, 50, 60 |
| Data services | Deduplication, compression, automated tiering, SSD lifespan tools (EonStor GS feature set) |
| Management | EonOne for GS family |
Host board options commonly cited for the GS 5000U / 5024U class:
| Host option | Notes for RFQ |
|---|---|
| 32 Gb/s FC ×4 | Classic SAN fabrics |
| 25GbE (SFP28) ×4, RDMA | Ethernet / NVMe-oF adjacency |
| 100GbE (QSFP28) ×1, RDMA | Single high-speed uplink path |
| 100GbE (QSFP56) ×2, RDMA | Dual 100G RDMA |
| 200GbE (QSFP56) ×1, RDMA | Highest Ethernet class on published options |
- NVMe-oF / GPUDirect: Vendor messaging highlights NVMe over Fabrics and GPUDirect Storage for GPU pipelines — require proof-of-concept on your GPU OS and driver stack.
- Unified protocols: EonStor GS is positioned as SAN + NAS + cloud-tier capable unified storage; list the protocols you will actually enable.
- HA: Dual controllers in chassis; cross-site HA cluster is a separate design decision — call it out on the RFQ.
When GS 5024U Actually Fits
Quick Answer: Shortlist GS 5024U when you need unified SAN/NAS (and often NVMe-oF) with U.2 NVMe density, optional hybrid HDD/QLC capacity, and AI/HPC adjacency such as GPUDirect or Lustre — not when you already standardized on ONTAP or PowerStore ops and only need a like-for-like refresh.
- Use this page: New AI/HPC or media storage RFQ where Infortrend is on the budget shortlist beside mainstream AFA.
- Not this page: AFF A50 vs AFF C60 — NetApp performance vs capacity flash on ONTAP.
- Not this page: PowerStore vs NetApp AFF — Dell–NetApp peer when Infortrend is out of scope.
- Not this page: Pure FlashArray vs NetApp AFF — Pure ecosystem bake-off.
Brand gravity vs brochure peaks
GS 5024U competes on U.2 NVMe hybrid density and published throughput. AFF and PowerStore compete on ecosystem, ISV certification depth, and ops familiarity. Win the RFQ on equal usable capacity and protocol honesty — not on whose datasheet prints the larger GB/s.
Capacity & Hybrid Scale
Quick Answer: Keep hot data on U.2 NVMe in the 2U head; scale capacity with U.2 NVMe expansions (vendor: toward multi-PB flash) or dense SAS HDD expansions (vendor: toward ~20 PB hybrid). HDD-only expansion paths also claim high sequential throughput under best practice.
| Scale path | Vendor positioning | RFQ implication |
|---|---|---|
| Base 24× U.2 NVMe | Up to ~1.4 PB in 2U | Size usable after RAID and efficiency — not raw brochure PB |
| NVMe SSD expansion | Up to ~5.6 PB class flash scale (published) | Itemize JBOF count, cables, and rack power |
| HDD / hybrid expansion | Up to ~20 PB class with dense JBOD | Separate cold tier SKUs; do not mix into all-flash peer TCO |
| NVMe expansion throughput | Vendor: sustain ~125 GB/s with U.2 expansions | Ask for the exact expansion BOM behind the claim |
| HDD expansion throughput | Vendor: up to ~100 GB/s with HDD expansions | Valid for sequential HPC/archive — not OLTP peer to TLC AFA |
| Cluster scale-out | Published max drive counts via scale-out with other series (hundreds of U.2 / thousands of HDD) | State cluster node count and interconnect separately |
Media honesty checklist
- TLC vs QLC U.2 for endurance and rewrite-heavy AI checkpoints
- SED / encryption requirements vs OS flags
- Whether Lustre metadata stays on U.2 while objects/data land on HDD tiers
- Power, cooling, and rack depth for 90-bay-class expansions if quoted
Use Cases
Quick Answer: Published fits for the Infortrend EonStor GS 5024U are artificial intelligence training feed, high-performance computing and Lustre sequential throughput, multi-stream media production, and electronic design automation file input/output. Each needs a different media mix, host-board selection, and expansion path stated on the request for quotation.
| Use case | Why GS 5024U is shortlisted | What to freeze on the RFQ |
|---|---|---|
| AI training / inference feed | High sequential read, GPUDirect / NVMe-oF messaging, flash scale | GPU fabric speed, checkpoint write endurance, dataset hot/cold split |
| HPC / Lustre | High throughput; U.2 can hold metadata to avoid separate MDS cost | Parallel FS layout, HDD expansion count, metadata SSD reservation |
| Media & entertainment | Vendor stream counts for 4K/8K collaborative edit | Concurrent stream target, Ethernet vs FC, working-set SSD size |
| EDA / semiconductor | High file-read IOPS claims for design/simulation trees | Small-file mix, NFS/SMB vs block, snapshot/clone needs |
| General enterprise unified | SAN/NAS in one GS platform with HA | Protocol mix, replication, support term — peer vs AFF/PowerStore ops |
Peer Shortlist — AFF & PowerStore
Quick Answer: Quote the Infortrend EonStor GS 5024U alongside NetApp AFF or Dell PowerStore on the same usable-terabyte, protocol, and high-availability brief. Do not compare hybrid hard-disk-expanded Infortrend capacity against all-flash AFF usable terabytes unless the media split is clearly labelled on both quotations before ranking.
| Dimension | EonStor GS 5024U | NetApp AFF / Dell PowerStore |
|---|---|---|
| Primary gravity | U.2 NVMe hybrid density, published GB/s | ONTAP or PowerStoreOS ecosystem & ISV depth |
| Media story | All-flash or hybrid QLC/HDD expansions | Typically all-flash (AFF) or PowerStore media families |
| AI/HPC adjacency | GPUDirect, NVMe-oF, Lustre messaging | Validate per stack — different certified paths |
| Ops model | EonOne / GS feature set | ONTAP System Manager / PowerStore Manager |
| When GS wins RFQ | Budget + hybrid PB scale + U.2 density | When ops standard or app certification locks vendor |
- NetApp AFF A-Series specs — ONTAP performance ladder
- AFF A50 vs AFF C60 — NetApp perf vs capacity flash fork
- PowerStore vs NetApp AFF — when Infortrend is third column only
- PowerStore vs Pure vs NetApp — three-brand open shortlist
RFQ Checklist
Quick Answer: State on one brief the workload class, usable terabytes, U.2 media type, expansion path, host boards, protocol list, and high-availability or replication needs for the EonStor GS 5024U, plus a peer NetApp AFF or Dell PowerStore line. Validate GPUDirect or Lustre only when those stacks are explicitly in scope.
What to put on the RFQ
- Model: EonStor GS 5024U (dual controller) — confirm exact SKU / cache size
- Base drives: U.2 NVMe count, TLC vs QLC, SED, usable TB after RAID
- Expansion: NVMe JBOF and/or SAS HDD JBOD count; separate hot/cold tiers
- Host boards: 25/100/200GbE RDMA and/or 32G FC — port matrix per fabric
- Protocols: block, NFS/SMB, NVMe-oF — enable only what apps need
- AI/HPC extras: GPUDirect required? Lustre metadata on U.2?
- Data services: dedupe/compression/tiering on or off for the TCO model
- HA: dual-controller only vs cross-site HA cluster
- Support term years; spare kit; rack/power constraints
- Peer line: AFF or PowerStore equalized on usable TB and protocols
Submit the dual-path brief on rfq.html.
Frequently Asked Questions
Quick Answer: The EonStor GS 5024U is the Infortrend flagship U.2 NVMe hybrid flash unified array aimed at artificial intelligence and high-performance computing throughput. Peer it against NetApp AFF or Dell PowerStore on usable capacity and protocols, and treat the published 125 GB/s figure as a vendor peak, not a guaranteed site service level.
Infortrend publishes the GS 5000U family on infortrend.com. This page is the RFQ table — GS 5024U dual-controller U.2 NVMe — so you size a hybrid unified array before opening that page. Confirm HDD expansion and protocol licenses on the quote.
A dual-controller 2U 24-bay U.2 NVMe hybrid flash unified storage system in the EonStor GS family, positioned for AI, HPC, media, and EDA workloads with optional HDD/QLC capacity expansion.
Peer options on an equal-BOM RFQ. GS emphasizes U.2 hybrid density and published throughput; AFF/PowerStore emphasize ecosystem and ops standards. Equalize usable TB, protocols, and HA before ranking.
No. It can run all-flash U.2 NVMe and hybrid designs that expand onto NVMe or SAS HDD capacity tiers, including economical QLC for colder data.
Use it as a vendor ceiling under best-practice configs. Size from your drive mix, RAID, host boards, and PoC results — then match those assumptions on peer quotes.
Submit media, host boards, expansions, and peer AFA lines on one RFQ.
Key Takeaway
Key Takeaway: EonStor GS 5024U brings U.2 NVMe hybrid flash density and AI/HPC-oriented connectivity into the same shortlist as mainstream AFA brands. Freeze usable capacity, media tier, and protocols before comparing brochure throughput. BENQUAN GLOBAL LIMITED supplies Infortrend EonStor GS with competitive pricing and configuration support for global buyers.