Data Center / Storage / SAN / Block / Procurement

Is the brief EonStor DS SAN, or GS unified?

SAN-first keyword intent. DS 4000U U.2 for critical IOPS, midrange 3000/4000 for general block, G3 for ROBO — freeze protocols and usable TB before peer quotes.

Quick Take

Quick Take: EonStor DS is Infortrend’s HA SAN family for databases, virtualization, backup, and surveillance block stores. Pick U.2 4000U for peak SAN performance or G3 for ROBO economics — do not confuse with GS unified or CS scale-out NAS Evaluate based on workload and growth projections.

When EonStor DS Keyword Intent Fits

Quick Answer: Shortlist Infortrend EonStor DS when the requirement is enterprise storage area network work, covering Fibre Channel or iSCSI datastores, databases, virtualisation clusters, Veeam backup targets, or surveillance block stores. Choose another family when the primary need is scale-out network-attached storage namespaces for unstructured file growth.

“EonStor DS” searches mix entry ROBO SAN with U.2 NVMe DS 4000U performance builds. Freeze media track and host protocol before comparing list economics to unified GS or SMB NAS.
SAN
Block First
HA
Dual Controller
1M
IOPS Class*
448
Drives Max*

*Vendor-published class figures for U.2 DS performance models and scale-up limits — confirm exact SKU on the RFQ.

  • Search themes: “EonStor DS,” “Infortrend SAN,” “DS 4000U,” “Infortrend virtualization storage.”
  • Not this page: EonStor CS scale-out NAS — unstructured file clusters.
  • Not this page: GS family — unified SAN+NAS.

DS Model Ladder

Quick Answer: In the Infortrend EonStor DS ladder, DS 4000U leads with U.2 NVMe hybrid flash, DS 4000 and 3000 plus their B solid-state variants cover general high input/output work, and DS 2000 and 1000 G3 serve cost-effective branch storage area networks with petabyte-class expansion potential.

TierPositioningRFQ notes
DS 4000UU.2 NVMe hybrid flash for business-critical SANAuto-tiering + HDD expansions; DB / virtualization
DS 4000 / 3000 (+E)High I/O general enterprise SANSize host boards (e.g. 32G FC) to fabric
DS 4000B / 3000B / 3000BE2.5" SAS SSD support variantsSSD-heavy random I/O
DS 2000 G3 / 1000 G3 (+B)Cost-effective SMB/ROBO SANLight SAN; expand toward multi-PB with JBOD
  • Published U.2 performance class: up to ~11 GB/s read / ~7.5 GB/s write / ~1000K IOPS on DS U.2 NVMe messaging — treat as vendor ceilings.
  • Scale-up: multiple JBOD form factors; up to ~448 drives in published family guidance.
  • Efficiency: offline dedupe/compression; auto-tiering; SSD cache for random-read OLTP-style apps.
  • Protection: RAID, snapshot, local/remote replication.
  • Management: SANWatch for multi-system monitoring and config.
  • Certifications adjacency: virtualization (VMware / Hyper-V / Citrix Ready messaging) and Veeam-oriented backup use cases — validate current cert matrix for your release.

Use Cases Tied to Search Demand

Quick Answer: Infortrend EonStor DS wins tenders for database random input/output, virtualisation datastores, media bandwidth storage area networks, backup repositories, and dense surveillance retention. Each workload needs a different media and host-board mix, so state the workload class explicitly rather than asking only for generic usable terabytes.

Use caseWhy DSFreeze on RFQ
Database / OLTPHigh IOPS + SSD cache / U.2 optionsLatency tier, RAID, host paths
VirtualizationRandom I/O + platform certificationsVM count, datastore protocol
M&E SANHigh bandwidth + PB capacityStream count, FC vs Ethernet
Backup targetCapacity + Veeam-oriented designsIngest window, retention TB
SurveillanceHigh drive count / retention daysCamera count, bitrate, days

RFQ Checklist

Quick Answer: Submit one storage area network brief stating usable terabytes, the Fibre Channel and iSCSI port matrix, EonStor DS tier, media choice across U.2 NVMe, SAS solid-state and hard disks, expansion enclosure count, cache or tiering, replication, and support years. Add an EonStor GS peer line only if file services are required.

What to put on the RFQ

  • DS model tier (4000U / 4000 / 3000 / 2000 G3 / 1000 G3)
  • Media: U.2 NVMe, SAS SSD, HDD — hybrid yes/no
  • Host boards: 32G FC, iSCSI Ethernet speeds
  • Usable TB after RAID; JBOD expansion count
  • SSD cache / auto-tiering required?
  • Snapshot / remote replication years
  • Workload: DB, VMs, Veeam, cameras, media
  • Support term; install services

Submit the SAN brief on rfq.html.

Frequently Asked Questions

Quick Answer: Infortrend EonStor DS is a block-first high-availability storage area network family. Choose the U.2 based 4000U for critical performance, the mid 3000 or 4000 tiers for general block work, and G3 entry models for branch sites. Do not confuse DS with GS unified arrays or CS scale-out storage.

Infortrend’s enterprise HA SAN storage family for block workloads — databases, virtualization, backup, surveillance, and media — managed with SANWatch.

DS is SAN-first block. GS is unified SAN+NAS+cloud services. Pick DS when file services are secondary or separate.

Yes — DS 4000U-class models target U.2 NVMe hybrid flash with high published IOPS/throughput for critical SAN apps.

Submit usable TB, host protocols, and expansion needs on one RFQ.

Key Takeaway

Key Takeaway: Match tier to workload before quoting: DS 4000U for critical databases at a published 11 GB/s read and 1M IOPS class, DS 3000/4000 for general block, G3 for branch sites. Lock 32G FC or iSCSI host boards, JBOD growth toward 448 drives, and usable TB after RAID. BENQUAN GLOBAL LIMITED supplies Infortrend EonStor DS arrays with competitive pricing.

Not sure your SAN BOM is optimal?

If DS tier, U.2 vs HDD, FC ports, or JBOD growth are unclear, click below for a free compatibility and delivery risk assessment. Fast BOM validation from a global free-port logistics hub.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents