Quick Take
Quick Take: EonStor CS is Infortrend’s scale-out NAS for unstructured growth — M&E, HPC files, and archives — under one namespace. Size nodes and media honestly; brochure 100+ GB/s figures are aggregate cluster ceilings, not a single-head SLA Evaluate based on workload and growth projections.
When Scale-Out NAS Intent Fits
Quick Answer: Shortlist Infortrend EonStor CS when unstructured data growth, covering media collaboration, high-performance computing files, surveillance archives, enterprise file shares, or backup repositories, needs linear scale-out under a single namespace, rather than a larger dual-controller unified box that simply adds capacity behind two fixed heads.
*Vendor-published family ceilings — size from your node count, media mix, and PoC, not brochure maxima alone.
- Search themes: “EonStor CS,” “Infortrend scale-out NAS,” “CS 4000U,” “Infortrend media storage,” “scale-out NAS vs SAN.”
- Start small: Deploy one CS appliance, then add nodes for performance and capacity.
- Not this page: EonStor DS SAN — block-first.
CS Model Ladder
Quick Answer: Within the Infortrend EonStor CS ladder, CS 4000U leads with U.2 NVMe hybrid flash input/output, CS 4000 and 4000B cover hybrid SAS solid-state and hard disk enterprise file work, CS 3000 balances price and performance for media and file sharing, and CS 2000 prioritizes capacity for backup and archive.
| Tier | Positioning | RFQ notes |
|---|---|---|
| CS 4000U | U.2 NVMe hybrid flash for I/O-intensive NAS | M&E render, analytics, HPC file |
| CS 4000 / 4000B | Hybrid SAS SSD + HDD enterprise file | Broad file workloads |
| CS 3000 | Attractive price/performance | M&E and general file sharing |
| CS 2000 | Capacity utilization focus | Backup and archive-heavy |
- Aggregate performance: family messaging up to 100+ GB/s; U.2 clusters cite ~18 GB/s class in small node counts — ask for the node BOM behind any claim.
- Scale-out: add CS nodes (vendor: up to 144) for linear growth; single namespace without separate metadata servers in CS architecture messaging.
- Scale-up: JBOD per node (vendor: up to ~120 drives per node path) for capacity-first budgets.
- Efficiency: hybrid SSD/HDD nodes + auto-tiering.
- Protection: RAID; replica / erasure coding across nodes; self-healing; folder remote replication (Rsync); Veeam Ready Repository messaging on qualifying configs.
- Management: EonOne for CS; Cluster Deployer / wizard for fast bring-up.
Use Cases (M&E and Beyond)
Quick Answer: Infortrend EonStor CS is frequently shortlisted for multi-editor 4K and 8K workflows, high-performance computing file datasets, surveillance archives, enterprise file services, and backup repositories that have outgrown a single network-attached storage head. State stream counts, retention days, and user counts on the request so nodes are sized honestly.
| Use case | Why CS | Freeze on RFQ |
|---|---|---|
| Media & entertainment | Multi-stream throughput; online node add | 4K/8K stream count, concurrent editors |
| HPC / analytics files | Aggregate bandwidth via nodes | File size mix, Ethernet fabric |
| Surveillance archive | Capacity scale-out | Retention days, ingest rate |
| File sharing | Single namespace; load balancing | SMB/NFS users, ACL needs |
| Backup repository | Veeam-oriented designs; capacity nodes | Backup window, immutable needs |
RFQ Checklist
Quick Answer: One scale-out NAS brief with initial node count, target aggregate TB/throughput, CS tier, SSD vs HDD node mix, Ethernet fabric, protocols, protection (replica vs erasure), and support years — do not peer a 1-node quote to a 10-node brochure slide.
What to put on the RFQ
- CS tier: 4000U / 4000 / 3000 / 2000
- Initial nodes + 24-month growth nodes
- Media mix: U.2 / SSD / HDD per node
- JBOD scale-up yes/no
- Protocols: NFS/SMB/FTP as required
- Stream or user concurrency targets
- Protection: replica vs erasure coding; remote Rsync
- Backup software integration (e.g. Veeam)
- Fabric: 25/100GbE expectations
- Support term; deployment services
Submit the cluster brief on rfq.html.
Frequently Asked Questions
Quick Answer: Infortrend EonStor CS is a scale-out network-attached storage family for unstructured data growth. Size nodes and media honestly, because published aggregate throughput describes a whole cluster rather than a single head service level. Use EonStor DS when the brief is block-first, and GS for unified mid-scale.
Infortrend’s scale-out NAS family for unstructured data — M&E, HPC file, surveillance archive, file sharing, and backup — under a single namespace cluster.
Vendor guidance cites up to 144 nodes and ~100PB / 100+ GB/s class aggregate — confirm current limits and the exact model on the RFQ.
CS is purpose-built scale-out NAS. GS is unified SAN+NAS with smaller scale-out caps. Choose CS when unstructured growth dominates.
Submit stream counts, node targets, and protocols on one RFQ.
Key Takeaway
Key Takeaway: Match the CS tier to the workload — 4000U for U.2 NVMe render and HPC feeds, 3000 for general file service, 2000 for backup and archive. Quote initial nodes plus 24-month growth; brochure 100+ GB/s is a whole-cluster figure, with small U.2 clusters sitting near 18 GB/s. EonStor CS cluster BOMs get competitive pricing and node-level configuration review from BENQUAN.