Quick Take
Quick Take: The IBM Power S1124 is a 4U Power11 scale-out server with one or two DCM sockets, up to 60 cores and 8 TB DDR5. It brings 10 PCIe slots (eight Gen5-capable) and 16 NVMe bays to 244.8 TB, running AIX, IBM i, and Linux.
Specs & Capacity
Quick Answer: The S1124 offers three Power11 module choices: 16 cores at 3.4 to 4.2 GHz, 24 cores at 3.05 to 4.15 GHz, and 30 cores at 2.8 to 3.95 GHz, up to 60 cores across two sockets. Size by licensed active cores rather than clock speed alone.
Figures follow the official IBM Power S1124 (9824-42A) technical specifications. Confirm processor feature codes, memory features, and OS entitlement on the quote. Related: Power S1024, IBM Power hub, IBM FlashSystem, SKU Lookup. Request a quote.
| Attribute | IBM Power S1124 (9824-42A) |
|---|---|
| Form factor | 4U rack drawer |
| Processor | 64-bit Power11 (Dual-Chip Module) |
| Sockets | 1 (upgradable) or 2 |
| Core / clock options | 16c @ 3.4–4.2 GHz · 24c @ 3.05–4.15 GHz · 30c @ 2.8–3.95 GHz |
| Max cores | 60 |
| L2 / L3 cache per core | 2 MB / 8 MB |
| Memory | 64 GB – 8 TB DDR5 (4000/4800 MHz), 32 DIMM slots |
| Max logical partitions | 1000 |
| Operating systems | AIX, IBM i, Linux |
*IBM Power S1124 technical specifications (9824-42A). Confirm feature codes and OS entitlement on the quote.
Overview
Quick Answer: The Power S1124 is IBM's 4U, one- or two-socket Power11 scale-out server for data-intensive workloads. Using Dual-Chip Module processors and a flat interconnect, it delivers up to 60 cores and 8 TB of DDR5 with enterprise-class RAS. It runs AIX, IBM i, and Linux, and consolidates mission-critical databases, SAP HANA, and analytics.
The S1124 is the Power11 successor to the Power10 S1022/S1024 scale-out family, moving to an enhanced 7 nm process for higher clocks and better yield. Each socket carries a Power11 DCM, and the two sockets are cross-coupled with embedded NUMA links. Enterprise RAS features uncommon in scale-out systems — spare cores, Active Memory Mirroring, Chipkill memory, and an eBMC service processor — are standard, and PowerVM Enterprise provides virtualization with up to 1000 partitions.
Hardware & I/O
Quick Answer: The system unit has 10 PCIe slots — four x16 Gen4 or Gen5 x8, four x8 Gen5, and two x8 Gen4 — with eight Gen5-capable. Sixteen U.2 NVMe bays hold up to 244.8 TB. PCIe Gen4 I/O drawers and a NED24 NVMe drawer add expansion, and redundant hot-plug power and cooling support high availability.
| Attribute | Detail |
|---|---|
| System-unit PCIe slots | 10 total (8 Gen5-capable) |
| — x16 Gen4 or Gen5 x8 | 4 |
| — x8 Gen5 | 4 |
| — x8 Gen4 | 2 |
| Internal NVMe bays | 16x U.2 |
| Max internal storage | 244.8 TB (16x 15.3 TB) |
| PCIe Gen4 I/O drawers | Up to 2 (24 slots each) |
| NVMe expansion drawer | NED24 (24 U.2 bays) |
| Virtualization | PowerVM Enterprise; CoD (CUoD) |
| RAS | Chipkill, Active Memory Mirroring, spare cores, eBMC |
| Power / cooling | Redundant hot-plug |
- Two-socket design uses cross-coupled NUMA links embedded on the Power11 processors.
- Capacity on Demand (CUoD) and Power Private Cloud (EP2.0) support elastic core and memory activation.
- Dual VIOS is optional for virtualized I/O resilience.
Use Cases
Quick Answer: The S1124 targets data-intensive scale-out workloads — SAP HANA, big-data analytics, and container platforms — plus AIX and IBM i consolidation and mission-critical databases. High memory bandwidth and enterprise RAS suit in-memory databases, while PowerVM and Capacity on Demand support hybrid-cloud elasticity for regional data centers.
SAP HANA & in-memory analytics
Up to 8 TB DDR5 with high bandwidth and Active Memory Mirroring for resilient in-memory databases.
AIX / IBM i consolidation
PowerVM Enterprise and up to 1000 LPARs consolidate mission-critical AIX and IBM i estates on one 4U node.
Oracle and enterprise databases
High per-core throughput and NVMe I/O host demanding databases; see the Oracle DB host comparison below.
Vs Power S1024 and E1150
Step up from the Power10 S1024; move to the 4-socket E1150 when a single node needs more than 60 cores.
Buying Checklist
Quick Answer: Choose the processor module (16/24/30-core) by license efficiency versus throughput, then size memory features, NVMe bays, and PCIe adapters. Decide on one or two sockets, Capacity on Demand, dual VIOS, and OS entitlement (AIX, IBM i, Linux). Confirm I/O drawers and PowerVM licensing before freezing the BOM.
- Processor module: 16c (clock/license) vs 24c/30c (throughput/consolidation)
- One vs two sockets (up to 60 cores)
- Memory capacity and feature (64 GB to 8 TB DDR5)
- Internal NVMe bays and capacity (up to 244.8 TB)
- PCIe adapters and Gen4 I/O drawers / NED24 NVMe drawer
- OS entitlement: AIX, IBM i, Linux
- Capacity on Demand (CUoD) and dual VIOS
- PowerVM Enterprise licensing and support term
Search IBM SKUs on SKU Lookup. For the Oracle DB host decision, see the S1124 vs x86 Oracle host guide.
Frequently Asked Questions
Quick Answer: Common questions cover the S1124's cores and memory, whether it is Power10 or Power11, internal storage and I/O, and where to source it. Match the processor module to license and throughput needs; confirm feature codes and OS entitlement on the quote.
IBM publishes the Power S1124 on ibm.com/products/power-s1124. This page is the RFQ table — cores, memory, and NVMe bays — so you size a Power11 system unit before opening IBM's page. Confirm I/O drawers and AIX or Linux on the quote.
The Power S1124 (9824-42A) supports one or two Power11 DCM sockets with up to 60 cores — 30 cores per module at 2.8 to 3.95 GHz, or 16- and 24-core options at higher clocks. Memory scales from 64 GB to 8 TB of DDR5 across 32 DIMM slots, with up to about 2,546 GB/s of bandwidth.
The Power S1124 is a Power11 system, IBM machine type 9824-42A, using Dual-Chip Module (DCM) processors. It is the Power11 successor to the Power10-based S1022 and S1024 scale-out line, adding higher clocks, spare cores, and up to roughly 25% more core capacity.
The S1124 has 16 internal U.2 NVMe bays for up to 244.8 TB (16x 15.3 TB), plus 10 PCIe slots in the system unit with eight Gen5-capable. PCIe Gen4 I/O drawers and a NED24 NVMe drawer expand slot and storage capacity for data-intensive workloads.
Contact info@benquan.hk or request a quote for a free BOM compatibility and delivery-risk review.
Key Takeaway
Key Takeaway: The IBM Power S1124 (9824-42A) is a 4U Power11 scale-out server with up to 60 cores, 8 TB DDR5, 10 PCIe slots, and 16 NVMe bays to 244.8 TB, running AIX, IBM i, and Linux with enterprise RAS. Match the processor module to license versus throughput needs. BENQUAN GLOBAL LIMITED supplies Power S1124 systems with competitive pricing.