Quick Take
Quick Take: Two-node IBM Power buys fail on licensing, not hardware: only eight of the sixteen Power11 cores carry IBM i entitlement, and the MIMIX Professional key is tied to the processor feature codes you order. Getting the cores, the tier and the HA license aligned before the purchase order is the whole job.
IBM Power S1124 Server Hardware
Quick Answer: Each of the two nodes pairs one 16-core IBM Power11 processor at software tier P20 with 512 GB of DDR5-3200 memory and four 6.4 TB NVMe U.2 drives mirrored under RAID 1. Only eight of those 16 cores carry IBM i licenses, and that entitlement is what includes 5250 interactive access.
Quick Summary: This guide details a complete IBM Power infrastructure specification based on two IBM Power S1124 servers with IBM Power11 16-core processors, 512 GB DDR5 memory per node, 6.4 TB NVMe storage, dual HMC consoles, IBM TS4300 tape libraries with LTO-8 drives, IBM i v7R5M0 operating system with full development suite, and Precisely MIMIX Professional for high availability replication. All supplied equipment must be new, unused, in original manufacturer packaging, with minimum 3-year warranty and an additional 3-year support extension option.
| Component | Specification | Quantity per Server |
|---|---|---|
| Server Model | IBM Power S1124 (or higher class) | 2 identical nodes |
| Processor | IBM Power11, 16 cores, software tier P20 | 1 |
| IBM i Core License | 8 licensed cores, includes 5250 interactive access | 1 set |
| Memory | DDR5 3200 MHz, 16 Gbit technology | 512 GB |
| Internal Storage | 6.4 TB 4K NVMe U.2 SSD PCIe4 | 4 drives |
| Disk Controller | RAID 1 / mirror mode | 1 |
| Ethernet | 8-port 10/1000 Mbps adapter | 2 adapters |
| Power Supply | 1600W or higher, redundant | 2 |
| Warranty | 3 years with 3-year extension option | 1 set |
The servers must support IBM i v7R5M0 or later, VIOS (Virtual I/O Server), virtualization, and LPAR (Logical Partition) creation. The IBM i processor core license must permit interactive 5250 IBM i Access sessions. All equipment must be new, unused, and delivered in original manufacturer packaging.
Hardware Management Console (HMC)
Quick Answer: Two management consoles are specified, each with a 6-core 3.0 GHz POWER9, 64 GB of DDR4, two 1.8 TB 10K SAS drives in RAID 1, redundant 900 W supplies and a rack-mounted KVM module. The HMC license may be permanent or subscription, but three years of support is mandatory.
| Component | Specification | Quantity per HMC |
|---|---|---|
| Processor | 6-core POWER9, 3.0 GHz | 1 |
| Memory | DDR4 or higher | 64 GB |
| Internal Storage | 1.8 TB 10K RPM 4K SAS HDD SFF | 2 drives (RAID 1) |
| Network | 2-port PCIe2 10/1 GbE Base-T RJ45 | 1 adapter |
| Power Supply | 900W or higher, redundant | 2 |
| KVM Module | Rack-mounted keyboard and display | 1 |
| License | Permanent or subscription, 3-year support | 1 set |
Tape Backup Infrastructure
Quick Answer: Two IBM TS4300 libraries carry four LTO Ultrium 8 drives between them, 40 cartridges at 12 TB native each and ten cleaning cartridges. The libraries must still read existing Ultrium 6 media, so drive-generation compatibility is a hard requirement; tape encryption, by contrast, is explicitly excluded.
| Component | Specification | Quantity |
|---|---|---|
| Tape Library | IBM TS4300 or equivalent, IBM i compatible | 2 |
| Tape Drives | LTO Ultrium 8 | 2 per library (4 total) |
| Data Cartridges | LTO Ultrium 8, 12 TB native | 40 total |
| Cleaning Cartridges | LTO cleaning cartridges | 10 total |
| Power Supplies | Redundant | 2 per library |
| Backward Compatibility | Must read ULTRIUM 6 media | Required |
Tape Encryption Note: Tape encryption is explicitly not required for this specification. This simplifies procurement and avoids the additional licensing and key management overhead associated with hardware encryption.
Power Distribution and Accessories
Quick Answer: Two non-managed rack PDUs must be sized for both the current load and planned expansion. The supplier must also deliver every power and fiber optic cable needed to attach the new equipment to existing infrastructure, all rails and mounting kits, and a manufacturer-recommended spares kit for each equipment type.
| Item | Quantity | Requirement |
|---|---|---|
| Non-managed PDU | 2 | Rack-mounted, supports current + future expansion |
| Power Cables | 1 set | All cables for all supplied equipment |
| Fiber Optic Cables | 1 set | All cables for existing infrastructure connection |
| Mounting Accessories | 1 set | Rails, brackets, mounting kits for all equipment |
| Spare Parts Kit | 1 set per type | Manufacturer-recommended spares for each equipment type |
IBM i System Software Stack
Quick Answer: IBM i v7R5M0 or later runs over PowerVM VIOS, and the license bundle reaches well past the operating system: HTTP Server (5770DG1), Java SE 8 (5770JV1), Performance Tools (5770PT1), DB2 Query Manager (5770ST1) and Rational Development Studio (5770WDS) with heritage RPG compilers for legacy code. Licensing is permanent or a three-year subscription, support included.
| Product ID | Description | Purpose |
|---|---|---|
| — | PowerVM VIOS | Server virtualization |
| — | IBM i v7R5M0 or later | Primary operating system |
| 5770SS1 | IBM i Base Components | QGPL, QUSRSYS, Host Servers, Media and Storage Extensions, ObjectConnect, Qshell, HA Journal Performance |
| 5770DG1 | IBM HTTP Server for i | Web serving for IBM i |
| 5770JV1 | IBM Developer Kit for Java | Java SE 8 32-bit and 64-bit |
| 5770PT1 | IBM Performance Tools for i | Performance monitoring, Job Watcher |
| 5770QU1 | IBM Query for i | WRKQRY, STRSQL database utilities |
| 5770ST1 | DB2 Query Manager and SQL Dev Kit | DB2 query and SQL development |
| 5770TC1 | TCP/IP Connectivity Utilities for i | Network connectivity |
| 5733-XJ1 | IBM i Access Client Solutions | Remote IBM i access |
| 5770WDS | Rational Development Studio for i | ILE RPG, ILE C, ILE C++, heritage compilers, ADTS (PDM, SEU, SDA, RLU, DFU) |
The IBM i operating system must be provided as a permanent license or a subscription license for not less than 3 years with free technical support for the same period. The software must include license, machine-readable media, and documentation.
Language Support: The primary IBM i interface language is English. Additional language groups include support for Cyrillic alphabet languages (both ILE and Heritage compiler language groups), ensuring compatibility with applications and data in European and Eurasian markets.
High Availability with MIMIX Professional
Quick Answer: Precisely MIMIX Professional handles hot-standby replication between the two nodes, and its permanent license is bound to those specific servers and their QPRCFEAT processor feature codes, so a later hardware swap is a licensing event. Assure Unified Interface is included, plus three years of support covering both machines.
| Software | Quantity | Requirement |
|---|---|---|
| Precisely MIMIX Professional | 1 set | Hot standby replication between two servers, permanent license bound to servers |
| Assure Unified Interface | 1 set | Included with MIMIX / VSP |
| Precisely iOptimize | 1 set | If free license available |
| MIMIX Technical Support | 3 years | For both servers |
Warranty and Support Requirements
Quick Answer: Every item ships new and unused in undamaged factory packaging, with packaging cost already inside the equipment price. Warranty runs a minimum of three years from delivery, including scheduled maintenance, and an extension of at least three further years must be quotable, giving a six-year support horizon.
| Requirement | Specification |
|---|---|
| Equipment Condition | New, unused, original undamaged manufacturer packaging |
| Warranty Period | Minimum 3 years from delivery date |
| Support Extension | Available for at least 3 additional years after initial period |
| Packaging | Cost included in equipment price |
| Compatibility | Equivalent production system operation to current infrastructure |
Procurement Summary: This specification represents a complete IBM Power infrastructure modernization project covering server hardware, management consoles, tape backup, power distribution, operating system software, development tools, and high availability replication. The 3+3 year warranty structure ensures operational continuity while allowing budget flexibility for long-term support planning.
Frequently Asked Questions
Quick Answer: The build pairs two 16-core Power11 nodes at software tier P20, each holding 512 GB of DDR5 memory and four NVMe drives, with eight IBM i cores licensed for 5250 access. Tape libraries handle retention on LTO-8 media, MIMIX keeps a hot standby, and IBM i 7.5 runs under PowerVM.
What is the core hardware in this IBM Power S1124 specification?
Two identical Power S1124 nodes, each with an IBM Power11 16-core processor (software tier P20, 8 licensed IBM i cores including 5250 interactive access), 512GB of DDR5 3200MHz memory, and 6.4TB of 4K NVMe U.2 SSD storage across four drives.
What backup infrastructure does the specification include?
Two IBM TS4300 tape libraries with two LTO Ultrium 8 drives each (four total), 40 LTO-8 data cartridges at 12TB native capacity, ten cleaning cartridges and redundant power supplies. The libraries must read Ultrium 6 media; tape encryption is explicitly not required, which simplifies licensing and key management.
How is high availability implemented across the two servers?
Precisely MIMIX Professional provides hot-standby replication between the two Power S1124 nodes with a permanent license bound to the servers, plus the Assure Unified Interface and three years of MIMIX technical support covering both machines.
What operating system and software stack is specified?
IBM i v7R5M0 or later with PowerVM VIOS virtualization, base components (QGPL, QUSRSYS, Host Servers, Qshell), IBM HTTP Server for i, and IBM Developer Kit for Java (Java SE 8). The primary interface language is English, with Cyrillic language groups supported for European and Eurasian markets.
Key Takeaway
Key Takeaway: Freeze the processor feature codes before the MIMIX license is issued, confirm the eight licensed IBM i cores cover your 5250 workload, and hold the supplier to three years of warranty from delivery with the extension priced separately. BENQUAN GLOBAL LIMITED supplies the IBM Power S1124 with competitive pricing and configuration support.