Quick Take
Quick Take: IBM stopped taking new Power E1050 (9043-MRX) orders on 31 July 2026. China and South Korea run to 30 July 2027. The same-serial path is an MES to Power E1150 (9043-MRU). The 9 October 2026 catalog carries that model conversion and 227 feature conversions. Keep all DDR4 or convert all memory to DDR5. Never mix the two.
What exactly did IBM withdraw, and when?
Quick Answer: Announcement AD26-0012 (13 January 2026) withdrew the Power E1050 (9043-MRX) and seven other Power10 models from new orders on 31 July 2026. China and South Korea keep ordering until 30 July 2027. The letter does not withdraw MES upgrades or processor and memory activations on installed machines. Your E1050 keeps running and keeps its support contract.
Typical scene: an E1050 bought in 2023 runs ERP and Db2 on a five-year depreciation schedule. The 2027 plan needs about 25% more cores. Finance asks for “one more E1050, same as last time.” That line can no longer be ordered in most markets. This is a typical planning trap, not a named customer.
The withdrawal is a sales stop, not a support stop. IBM’s lifecycle page for 9043-MRX shows general availability on 22 July 2022 and “no longer available for order” on 31 July 2026, with no end-of-support date yet. What changes is how you buy more capacity. A new box of the old model is gone. Activations on the box you own, and an MES upgrade on that serial, are still open.
| Model | Machine type | Status as of 20 October 2026 |
|---|---|---|
| Power E1050 (Power10) | 9043-MRX | Withdrawn from new orders 31 Jul 2026 (AD26-0012); China and South Korea to 30 Jul 2027 |
| Power E1150 (Power11) | 9043-MRU | Generally available since 8 Jul 2025 (AD25-0034) |
| Power E1080 (Power10) | 9080-HEX | Withdrawn 31 Jul 2026 — separate upgrade path to E1180 (9080-HEU) |
- Fit: you own a 9043-MRX and need more cores, more memory bandwidth or Power11 features inside the same depreciation and licence identity.
- Unfit: E1080 owners (different machine type and path); S1024 or S1022 scale-out owners (no same-serial MES to Power11); buyers who want a second, separate box.
What is a serial number-preserving upgrade?
Quick Answer: A serial number-preserving upgrade is an IBM MES that converts an installed machine to a newer model while it keeps its system serial. For E1050 to E1150, IBM says existing memory modules and I/O adapters can migrate. IBM scheduled availability from Q4 2025. The 9 October 2026 catalog lists the 9043-MRX to 9043-MRU model conversion line.
Think of it as a new engine in the same registered car. The chassis number on the paperwork stays the same. Insurance, licence plates and the service history all carry over. A new-serial E1150 is a second car: new asset tag, new installation record, and software entitlements that have to be moved across.
That is why the serial matters to a buyer. Asset registers, depreciation schedules and IBM software entitlements tied to the machine all follow the serial. IBM’s Redbook SG24-8589 (October 2025) says the same-serial path simplifies software licensing, asset tracking and operational continuity. It also notes that E1050 and E1150 can share one Power Enterprise Pools 2.0 pool, so partitions can move at your own pace.
Before you plan around it, confirm two things on a dated quote: that the MES is orderable in your country today, and the price. Both are pending confirmation. IBM publishes no list price for 9043 lines.
How does Power E1150 compare with Power E1050?
Quick Answer: Same 4U frame, same 64 DDIMM slots and the same 16 TB memory ceiling. The E1150 swaps in Power11 modules of 16, 24 or 30 cores, so a four-socket box reaches 120 cores instead of 96, about 25% more. Memory moves to DDR5 at 4000 MHz with about 25% more bandwidth, and each socket carries 2 spare cores.
| Item | E1050 (9043-MRX) | E1150 (9043-MRU) |
|---|---|---|
| Processor modules (feature codes) | 12-core 3.35–4.0 GHz EPEU; 18-core 3.20–4.0 GHz EPEV; 24-core 2.95–3.90 GHz EPGW | 16-core 3.5–4.2 GHz EPEX; 24-core 3.3–4.2 GHz EPEY; 30-core 3.0–4.1 GHz EPEZ |
| Max cores, 4 sockets | 96 | 120 (about +25%) |
| Spare cores | — | 2 per socket |
| Memory slots / maximum | 64 DDIMM / 16 TB | 64 DDIMM / 16 TB |
| Memory on new systems | DDR4 3200/2933 MHz or DDR5 3200 MHz | DDR5 4000 MHz only |
| DDR4 | Native | Only as migration during the same-serial upgrade |
| PCIe / internal NVMe | — | 11 slots (8 Gen5-capable) / 10 U.2 NVMe bays |
| Processor mixing | — | One processor feature code per server; no mixing |
Read the second row first. If your E1050 already runs 96 cores and the plan needs 110, only the E1150 gets there in one frame. If you run 48 cores and need 60, you may not need a new processor generation at all — check unused capacity on demand before you quote an MES.
Which lines did the 9 October 2026 catalog add for 9043?
Quick Answer: On 12 September 2026 the IBM catalog on SKU Lookup carried 2 rows for machine type 9043. On 9 October 2026 it carried 1,764. The 1,762 new rows are 1,534 orderable features, 227 feature conversions and 1 model conversion (9043MRX_9043MRU). Nothing was removed and no price moved; IBM stays quote-only.
| Conversion type | Rows | What it means on your quote |
|---|---|---|
| Memory activation → memory activation | 107 | GB you already paid to activate move to E1150 codes, e.g. EMCQ (100GB, MRX) → EMM4 (100GB DDR5) |
| Processor activation → processor activation | 69 | Activated cores move, e.g. EPYT (core for EPGW) → EPUT (core for MRU) |
| Memory DDIMM → DDIMM | 20 | DDR4 EM75–EM7J or E1050 DDR5 EMFH–EMFL to 4000 MHz EM5P–EM5S |
| Processor module → module | 12 | EPEU / EPEV / EPGW to EPEX / EPEY / EPEZ |
| I/O, Pools 2.0, PowerVM, mirroring, NVMe backplane | 19 | Carry-over and enablement rows |
| Model conversion | 1 | 9043-MRX → 9043-MRU on the same serial |
The other 14 additions in the same revision are software and SaaS codes. The IBM catalog now stands at 217,683 part numbers, up 1,776 from 215,907. A catalog row proves a code exists. It does not prove your country can order it this week, and it carries no price. You can check any of these codes on SKU Lookup · IBM.
Can DDR4 and DDR5 memory share one Power E1150?
Quick Answer: No. IBM allows DDR4 DDIMMs from an E1050 to migrate into a Power E1150, but the whole server must then be DDR4. DDR4 and DDR5 cannot mix in one E1150; only the multi-node E1180 allows a different type per node. New E1150 systems ship DDR5 at 4000 MHz only. Make one memory decision for the whole box.
Picture a railway where every carriage must run on the same track gauge. You can keep the old carriages, or replace them all. You cannot couple one new carriage to the old train and expect it to run at the new speed.
The catalog shows three memory families on 9043, and quotes mix them up:
- DDR4: EM75 64GB, EM76 128GB, EM77 256GB, EM7J 512GB.
- E1050-era DDR5: EMFH 64GB, EMFJ 128GB, EMFK 256GB, EMFL 512GB.
- E1150 DDR5 at 4000 MHz: EM5P 64GB, EM5Q 128GB, EM5R 256GB, EM5S 512GB.
All three are listed as pairs of DDIMMs. A quote that says “DDR5 128GB” without a feature code is ambiguous: EMFJ and EM5Q are different lines. The catalog carries conversion rows from both older families to the EM5x family. In April 2026 IBM also announced a hardware withdrawal of 4U DDR4 DDIMMs on selected Power servers. If you plan to keep DDR4, check that spare DDIMMs for that path are still orderable before you commit.
Typical use cases: when is the MES the right call?
Quick Answer: The MES fits when software licensing, asset records or Pools 2.0 membership are tied to the E1050 serial and you need more than 96 cores or faster memory. A new-serial E1150 fits when you want a second machine for DR or a clean split. Staying put fits if unused capacity on demand already covers the 2027 plan.
The cost of picking wrong is real, even without list prices. A new-serial box restarts the asset tag and the depreciation clock, and moves software entitlements machine to machine. An MES done half-way — new processors, mixed memory — will not be supported. Three questions settle most cases: Is the box 9043-MRX? Which memory family is in it? How many cores and GB are already activated?
- ERP host at 96 cores, needs 110: MES to EPEZ 30-core modules; convert activations; decide memory once.
- Db2 host at 48 cores, needs 60: check unused capacity on demand first; an MES may not be needed this year.
- Pools 2.0 with two E1050s: add one E1150 to the same pool, or MES one box at a time.
- DR site wants a separate machine: quote a new-serial E1150 instead; this page’s conversion lines do not apply.
How do you quote an E1050 to E1150 upgrade?
Quick Answer: Confirm the box is 9043-MRX. Pull its feature list. Pick a Power11 module. Make one memory decision. Map every activation to its conversion code. Then ask for a dated quote with the 9043MRX_9043MRU model conversion on top. Six steps, one sheet, and no re-bought activations.
- Step 1 — Confirm the machine type — Check the label or HMC: the box must be 9043-MRX (Power E1050). Note the serial. A 9080-HEX (E1080) follows a different path to E1180.
- Step 2 — Pull the current feature list — Processor module feature code, memory feature code × quantity, activated cores and GB, Power Enterprise Pools 2.0 yes or no.
- Step 3 — Pick one Power11 module — EPEX 16-core, EPEY 24-core or EPEZ 30-core — one feature code for every socket, because processor feature codes cannot be mixed in an E1150. Map each EPEU, EPEV or EPGW module to its conversion row; the catalog has 12.
- Step 4 — Make one memory decision — Keep all DDR4 (migrate EM75–EM7J) or convert all memory to 4000 MHz DDR5 (EM5P–EM5S). Never half: DDR4 and DDR5 cannot mix in one E1150.
- Step 5 — Convert every activation — Map core activations (for example EPYT → EPUT) and memory activations (for example EMCQ → EMM4). The catalog has 69 core and 107 memory activation conversions.
- Step 6 — Ask for a dated quote — Model conversion 9043MRX_9043MRU on top, then module, memory and activation conversions. Country availability and price are pending confirmation. BENQUAN returns the mapping in one business day.
Small first step: send only the current feature list and the serial. That is enough to draw the conversion map. You do not need a final core target to start.
RFQ checklist
Quick Answer: Send the serial, machine type 9043-MRX, processor module feature code, memory feature codes with quantities, activated cores and GB, Pools 2.0 yes or no, and the target core count. BENQUAN returns a line-by-line conversion map against the 9 October 2026 catalog in 1 business day. Price pending confirmation.
What to put on the RFQ
- Serial number and machine type (must read 9043-MRX)
- Processor module feature code (EPEU / EPEV / EPGW) and socket count
- Memory feature codes × quantity (EM75–EM7J or EMFH–EMFL)
- Activated cores and activated GB today
- Power Enterprise Pools 2.0 membership: yes or no
- Target cores and memory for 2027, and whether you would keep DDR4
- If you also want a new-serial E1150 priced: say so for a second column
Submit on rfq.html. BENQUAN maps each line to its 9 October 2026 conversion code and ships worldwide from an ex-stock free-port hub where parts are needed. The dual-path brief puts MES on your serial next to a new-serial E1150, on the same assumptions.
Common pitfalls in an E1050 upgrade quote
Quick Answer: The costly misses are budgeting “one more E1050” after 31 July 2026, mixing DDR4 and DDR5 in one E1150, reading E1050-era DDR5 as E1150 DDR5, and paying for activations again. Each has a catalog line that fixes it. Read the extra 1,776 parts as new codes, not a price rise.
| Trap | Why it bites | Fix |
|---|---|---|
| Budget line “new E1050” in 2027 | Withdrawn 31 Jul 2026 (China and South Korea 30 Jul 2027) | MES on the serial, or a new E1150 |
| Half DDR4, half DDR5 | Not supported in one E1150 | All-DDR4 migrate or all-DDR5 convert |
| Two processor sizes in one box | Processor feature codes cannot be mixed in an E1150 | Convert every socket to the same EPEX, EPEY or EPEZ |
| EMFx treated as EM5x | Different feature codes and speed family | Use the DDIMM conversion row |
| Re-buying activations | 107 memory and 69 core conversion rows exist | Convert by code |
| E1080 quoted on this path | 9080-HEX goes to 9080-HEU, not 9043-MRU | Separate quote |
| +1,776 parts read as a price rise | 0 removed, 0 price moves, quote-only | Treat as catalog expansion |
Frequently Asked Questions
Quick Answer: New E1050 orders stopped on 31 July 2026 outside China and South Korea. The E1150 upgrade keeps the serial. DDR4 can migrate, but not alongside DDR5. Activations convert by code: 69 core rows and 107 memory rows. The E1150 reaches 120 cores. IBM publishes no price; quotes are dated and pending confirmation.
Not in most markets. IBM withdrew the Power E1050 (9043-MRX) from new orders on 31 July 2026 under announcement AD26-0012. China and South Korea keep ordering until 30 July 2027. Elsewhere the choices are an MES upgrade to Power E1150 on your existing serial, or a new-serial E1150.
Yes. IBM describes E1050 to E1150 as a serial number-preserving upgrade (Redbook SG24-8589, October 2025). Existing memory modules and I/O adapters can migrate. The catalog dated 9 October 2026 carries the 9043-MRX to 9043-MRU model conversion line.
Yes, as a migration from the E1050 only, and the whole E1150 must then stay DDR4. IBM does not support mixing DDR4 and DDR5 DDIMMs in one E1150. New E1150 systems ship DDR5 at 4000 MHz only. Decide all-DDR4 or all-DDR5 before the quote.
You should not have to re-buy them as new. The 9 October 2026 catalog lists 69 processor-activation and 107 memory-activation conversion rows from E1050 codes to E1150 codes. What IBM charges for each conversion is quote-only and pending confirmation.
Power11 modules of 16, 24 or 30 cores, so up to 120 cores in four sockets versus 96 on the E1050 (about 25% more). DDR5 runs at 4000 MHz with about 25% more bandwidth, and each socket carries 2 spare cores. Memory slots and the 16 TB maximum stay the same.
No. IBM is quote-only and the catalog shows no list price for 9043 lines. Any figure without a quote date is an estimate. Send the serial and feature list for a dated quote; pricing is pending confirmation.
References
Quick Answer: Lifecycle dates come from IBM’s product lifecycle pages for 9043-MRX and 9043-MRU. The upgrade and memory rules come from IBM Redbook SG24-8589 and IBM’s Power RAS whitepaper. AD26-0012 detail comes from IT Jungle. Catalog counts are from the 9 October 2026 IBM revision on SKU Lookup, checked 20 October 2026.
- IBM — Power E1050 (9043-MRX) lifecycle (GA 22 Jul 2022; withdrawn 31 Jul 2026, AD26-0012)
- IBM — Power E1150 (9043-MRU) lifecycle (GA 8 Jul 2025, AD25-0034)
- IBM Redbook SG24-8589 — Power11 E1150 Introduction and Technical Overview (October 2025)
- IBM — Introduction to IBM Power Reliability, Availability, and Serviceability for Power10 and Power11 Processor-Based Systems (whitepaper; DDR4/DDR5 mixing rule, search the title on ibm.com)
- IBM Power announcements (SoD Oct 2025; DDR5 activation conversion and DDR4 DDIMM withdrawal, Apr 2026)
- IT Jungle — IBM starts winding down Power10 system sales (9 Feb 2026)
Key Takeaway
Key Takeaway: New Power E1050 orders ended 31 July 2026 in most markets. Quote the same-serial MES to E1150: model conversion, one processor code, 69 core and 107 memory activation conversions. Decide all-DDR4 or all-DDR5 once. BENQUAN GLOBAL LIMITED supplies IBM Power upgrade mapping with competitive pricing and configuration support.