Enterprise Storage / All-Flash Array / NVMe / FlashCore

IBM FlashSystem: did the 5300, 7300, or 9500 on your quote leave the list in mid-2026?

Current Storage Virtualize portfolio — FlashSystem 5600, 7600, and 9600 (successors to withdrawn 5300 / 7300 / 9500), plus entry 5000 and archive-focused C200.

Quick Take

Quick Take: Three FlashSystem models that buyers still ask for — the 5300, 7300, and 9500 — left the price list in mid-2026. This page maps what replaces them, how the 5600, 7600, and 9600 differ on bandwidth, ports, and FlashCore capacity, and where the 5000 and C200 still belong.

5300 / 7300 / 9500 Status

Quick Answer: End of marketing in mid-2026 (IBM accelerated some SKUs to May 2026; others listed June 30, 2026). Not for new sales — migrate RFQs to 5600 / 7600 / 9600. Refresh map: 5300 → 5600 · 7300 → 7600 · 9500 → 9600 (smaller 2U footprint vs prior 4U 9500).

Single-enclosure figures follow IBM’s published FlashSystem family comparison (effective PBe includes reduction assumptions). Confirm FCM generation, grid scale-out, and Storage Assurance on the quote. Related: Pure FlashArray, NetApp AFF, Dell PowerStore T, SKU Lookup. Request a quote.

Refresh map: 5300 → 5600 · 7300 → 7600 · 9500 → 9600 (smaller 2U footprint vs prior 4U 9500). Installed 5300/7300/9500 remain supportable under IBM lifecycle; MES windows may still apply — confirm on each account.

Withdrawn (prior gen)Current quote target
FlashSystem 5300FlashSystem 5600
FlashSystem 7300FlashSystem 7600
FlashSystem 9500 / 9500RFlashSystem 9600

Current Model Ladder

Quick Answer: Latency separates the tiers more than capacity does: the NVMe 5600, 7600, and 9600 all answer reads in tens of microseconds, while the C200 archive box sits in the millisecond range. Read bandwidth climbs from 30 to 86 GB/s across that trio, and port count doubles to 32 at midrange.

Model Form / role Max read BW* Effective / raw (single encl.)* I/O ports*
FlashSystem 50002U SAS entry (5015/5045)~12 GB/s~573 TBe / ~737 TB8
FlashSystem C2002U archive / backup AF~23 GB/s~2.3 PBe / ~1.1 PB16
FlashSystem 56001U entry NVMe~30 GB/s~2.4 PBe / ~633 TB16
FlashSystem 76002U midrange~55 GB/s~7.2 PBe / ~1.6 PB32
FlashSystem 96002U high-end~86 GB/s~11.8 PBe / ~3.3 PB32

*IBM published single-enclosure maxima. Read response: <50 µs class on 5600/7600/9600; C200 is 1–2 ms class for sequential/archive. Vendor peak IOPS examples: ~2.6M (5600), ~4.3M (7600), ~6.3M (9600) — workload dependent.

Grid scale (published)Effective max*Max read BW*
C200 grid~73 PBe~736 GB/s
5600 grid~77 PBe~960 GB/s
7600 grid~230 PBe~1,760 GB/s
9600 grid~377 PBe~2,752 GB/s

Overview

Quick Answer: Every current FlashSystem runs IBM Storage Virtualize with FlashCore Modules handling compression and inline threat detection in hardware. Immutable Safeguarded Copy snapshots, optional FlashSystem.ai operations, and grid scale-out come from the same software stack, so model choice turns on performance and capacity rather than features.

FCM & Protocols

Quick Answer: FlashCore Modules step from 6.6 TB to 52.8 TB on the 5600 and 7600, with a 105.6 TB option reserved for the 9600; the entry 5000 uses standard drives instead. Adapters cover Fibre Channel, iSCSI, and NVMe over Fabrics, and quoted petabyte-effective figures assume compression that your workload must justify.

  • 5600 / 7600 FCM: 6.6, 13.2, 26.4, 52.8 TB
  • 9600 FCM: above + 105.6 TB
  • C200: high-capacity FCM for backup/archive TCO
  • Host connectivity: FC, iSCSI, NVMe-oF / Ethernet options per adapter cards — confirm on the RFQ
  • Data services: Virtualize replication, encryption, Safeguarded Copy / cyber features, Storage Insights

Effective capacity: PBe figures assume data reduction. Size usable capacity from workload assessment, not brochure maxima alone.

Use Cases

Quick Answer: Edge/ROBO on 5600, consolidated midrange on 7600, mission-critical OLTP/ERP/AI on 9600, cold/DR copies on C200. Quote FlashSystem 7600 — map ports, FCM capacity, and Virtualize feature set; validate with IBM sizing. FlashSystem 9600 when prior 9500 capacity/IOPS are needed without the old 4U chassis.

Replace a 7300 refresh

Quote FlashSystem 7600 — map ports, FCM capacity, and Virtualize feature set; validate with IBM sizing.

Dense high-end in 2U

FlashSystem 9600 when prior 9500 capacity/IOPS are needed without the old 4U chassis.

Vs Pure / NetApp / PowerStore

See FlashArray, AFF, PowerStore T.

Buying Checklist

Quick Answer: Start by making sure the quote names a current machine — 5600, 7600, or 9600 — because 5300, 7300, and 9500 no longer accept new orders. Then size usable capacity by FCM generation, count host adapters per fabric, decide whether grid membership and cyber features matter, and set the Assurance or Expert Care term.

  1. 5600 vs 7600 vs 9600 (or 5000 / C200)
  2. Do not submit new 5300/7300/9500 orders
  3. Usable capacity and FCM generation
  4. FC / NVMe-oF / iSCSI adapter plan
  5. FlashSystem grid growth and cyber features
  6. Storage Assurance / Expert Care term
  7. Migration from installed 5300/7300/9500 if refreshing

Search IBM parts on SKU Lookup.

Frequently Asked Questions

Quick Answer: Installed 7300 systems can usually still take miscellaneous equipment specification upgrades while that window stays open, but greenfield quotes should move to the 7600 class. The 2U 9600 delivers a comparable IOPS class to the 4U 9500 in half the height, so size against workload rather than headline figures.

IBM publishes the current FlashSystem family on ibm.com/products/flashsystem. This page is the RFQ ladder — 7600/9600 versus withdrawn 5300/7300/9500 — so you size a greenfield array before opening IBM's sheets. Confirm MES windows on installed 7300 serials.

Often yes via MES while IBM’s MES window remains open (distributor notes have cited dates into 2028 for some lines). New greenfield purchases should be 7600-class. Confirm per serial/machine type.

IBM positions similar peak IOPS class with higher capacity in 2U; port count and peak read bandwidth differ from the 4U 9500. Size to your workload, not a single headline number.

BENQUAN GLOBAL LIMITED supplies current FlashSystem 5600/7600/9600 and support. Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: Match the tier to the workload, not to the old model number: 5600 for edge sites, 7600 for consolidated midrange, 9600 wherever the retired 9500 once needed four rack units, and C200 for archive copies. BENQUAN GLOBAL LIMITED supplies IBM FlashSystem 5600, 7600, and 9600 arrays with competitive pricing.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents