Fibre Channel SAN / Procurement

OceanStor SNS: is the order on a commercial code, mapped to a G620, G630, or X6 peer?

Equal-BOM map for OceanStor SNS3664–SNS5708: Huawei 0235… / 0623… commercial codes versus G620 / G630 / X6 OEM names, Gen6 32G ports, dual-fabric HA, and supply-risk language labeled pending confirmation.

Quick Take

Quick Take: Freeze Huawei OceanStor SNS CapEx on commercial codes (0235… / 0623…), not OEM nicknames alone. Map SNS3664/3764/3696E/560x/570x to G620/G630/X6 peers, equalize ports and optics, then dual-quote MDS / Brocade / TGStor. Soft post-2019 supply stop claims stay industry estimate / pending confirmation.

Lineup codes and port configs below come from a channel positioning table (SNS product / OEM model / Huawei code / config). Soft channel prices and any rumor that Broadcom stopped OEM supply after 2019 Entity List actions are industry estimate / pending confirmation — this page publishes no list prices and does not invent a Huawei EOM for the current table family.

What OceanStor SNS Means for Buyers

Quick Answer: OceanStor SNS is Huawei’s Fibre Channel SAN switch brand for fabric buys that historically track Brocade Gen6-class fixed and director platforms. Buyers must pair each SNS commercial name with its Huawei BOM code and OEM peer label before comparing CapEx to Cisco MDS, Broadcom Brocade, or TGStor columns.

Definition: An OceanStor SNS RFQ is a Fibre Channel fabric procurement brief — not an Ethernet IP-SAN appliance buy, and not a Dorado array RFQ. Fixed entry and mid-range boxes (SNS3664, SNS3764, SNS3696E) cover edge and mid-density Gen6 32G fabrics; modular directors (SNS5604 / SNS5704 / SNS5608 / SNS5708) cover blade-scale cores with chassis-class port counts. The procurement risk is identity: channel tables list Huawei product names, OEM model strings (G620, G620-3, G630, X6-4, X6-8), and Huawei commercial codes starting with 0235 (chassis / fixed) or 0623 (blades).

  • Fit this page: Huawei storage estates already on OceanStor arrays plus SNS fabrics; CapEx that must quote exact 0235… / 0623… lines; Gen6 32G refresh that peers MDS / Brocade / TGStor on one equal-BOM sheet.
  • Boundary: Treating SNS as TGStor; assuming Gen7 64G / X7 density is available as Huawei SNS without verification; inventing public list prices; mixing older EOM models (SNS2124 / SNS2224 family) into the current Gen6 table.

Huawei Enterprise Support still hosts product documentation families for SNS3664, SNS3696E, and related SNS directors — use those pages to validate model existence and software packages, then lock commercial codes on the seller quote. Soft supply continuity after 2019 export-control events remains industry estimate / pending confirmation until Huawei Info-Finder and the formal RFQ reply state otherwise.

Lineup Numbers — Codes, OEM Peers, Ports

Quick Answer: Entry SNS3664/3764 maps to G620 / G620-3 at 24 or 48 ports; mid SNS3696E maps to G630 at 48 or 96 ports; directors SNS5604/5704 and SNS5608/5708 map to X6-4 / X6-8 at 192 or 384 ports. Blade codes 06230887 and 06231256 are 48×32G and chassis-family specific.

Use the table as an equal-BOM identity sheet. Every CapEx line should carry Huawei product + OEM peer + Huawei code + stated config. Table configs are design floors for that commercial SKU — not a promise that every port is licensed or that enterprise feature packs ship free.

TierHuawei productOEM peerHuawei codeConfig (channel table)
EntrySNS3664G62002354YFC24 ports × 16G
EntrySNS3664G62002354YEY24 ports × 32G
EntrySNS3764G620-302356CJG24 ports × 32G + enterprise feature pack
EntrySNS3764G620-302356CJH48 ports × 32G + enterprise feature pack
MidSNS3696EG63002354YFF48 ports × 32G
MidSNS3696EG63002354YFG96 ports × 32G + enterprise feature pack
DirectorSNS5604X6-402354YGE192-port chassis + enterprise feature pack
DirectorSNS5704X6-4-302356CJF192-port chassis + enterprise feature pack
DirectorSNS5608X6-802354YGC384-port chassis + enterprise feature pack
DirectorSNS5708X6-8-302356CJE384-port chassis + enterprise feature pack
BladeGen6 bladeblade0623088748 ports × 32G; SNS5604 & SNS5608
BladeGen7 bladeblade0623125648 ports × 32G; SNS5704 & SNS5708

Procurement note: 16G versus 32G on SNS3664 is a BOM fork (02354YFC vs 02354YEY), not a free software toggle. Director rows quote chassis-class port envelopes; blades and optics still need separate lines. Soft channel unit prices for any row remain industry estimate / pending confirmation.

Numeric CapEx anchors (channel table + RFQ discipline): entry SNS3664 lines start at 24 active ports; mid SNS3696E quotes 48 or 96 ports; directors quote 192-port (SNS5604 / SNS5704) and 384-port (SNS5608 / SNS5708) chassis envelopes; blades are 48 ports × 32G each. Freeze the equal-BOM brief within 2 business days of design lock, keep optics spares near 10 percent of licensed ports (industry estimate / pending confirmation), and hold critical SFP ATP for at least 5 days of staging risk before cutover.

Lifecycle Cliffs vs Soft Supply Risk

Quick Answer: Older SNS2124 / SNS2224-class models have documented Huawei EOM dates; the Gen6 table family above does not have a located public Huawei EOM bulletin as of 2026-08-25. Broadcom G620 platform EOL applies to Brocade-branded hardware — map carefully to SNS3664 and label gaps pending confirmation.

Documented Huawei EOM (older models — not the table above)

  • SNS2124: EOM about 2018-12-31; EOS about 2023-12-31; replacement SNS2624 per Huawei bulletin language.
  • SNS2224 / SNS2248 / SNS5192 / SNS5384: EOM about 2019-12-31; EOS planned about 2024-12-31; replacement listed as NULL in the bulletin set reviewed for this guide.

Those cliffs are useful only when you are cleaning legacy estates. Do not paste them into CapEx language for SNS3664, SNS3764, SNS3696E, SNS5604, SNS5704, SNS5608, or SNS5708.

Table models (current Gen6 channel map)

As of 2026-08-25, no public Huawei EOM/EOS bulletin was found for these exact SKUs on the OceanStor SNS life-cycle notice list. Support documentation families still exist for SNS3664 / SNS3764 / SNS3696E / SNS5604 / SNS5704. That is not the same as a guaranteed new-build allocation window.

Soft supply rumor — label required

Industry commentary after the 2019 U.S. Entity List events described Broadcom / Brocade OEM exposure to Huawei. Public Gen7 Brocade OEM launch messaging in 2020 named other OEM brands — not Huawei — on widely cited product announcements. Publish rule for this site: do not state as proven fact that “Broadcom revoked Huawei OEM” or that “Huawei announced full SNS EOL for this table.” Treat continuity of new SNS build and Gen7 Huawei SNS availability as industry estimate / pending confirmation. Force Huawei Info-Finder + formal RFQ + dual-fabric peer quote before CapEx.

Broadcom G620 hardware EOL (OEM peer, not Huawei bulletin)

Broadcom’s public Fibre Channel EOL index lists Brocade G620 Switch EOL (notification ~2024-07-26) with Last Customer Ship ~2025-01-31, Fabric OS End-of-Availability ~2027-01-31, and End-of-Support ~2030-01-31 (verify live dates on broadcom.com). A separate 2026-08-07 POD/license notice references LCS ~2027-02-07 for remaining G620 POD/software paths. SNS3664 maps commercially to G620 class, but Huawei lifecycle may diverge — keep two columns on the risk sheet.

Equal-BOM Peer Columns — MDS / Brocade / TGStor

Quick Answer: Peer SNS Gen6 32G fixed boxes against MDS and Brocade G620/G630. SNS3664/3764 maps to TGStor G610, not G620. SNS3696E maps to TGStor G630. SNS X6 directors have no TGStor X6 — the TGStor director is X7. SNS is not TGStor.

Decision axisOceanStor SNS columnPeer column (examples)Buyer trap
IdentitySNS name + 0235/0623 codeMDS PID / Brocade SKU / TGStor modelQuoting only “G620 equivalent”
GenerationGen6 32G class (table)Gen6 peers or Gen7 G720/X7 pathAssuming Huawei Gen7 SNS without RFQ proof
PortsTable config + feature packPoD floors to ceilingComparing chassis stickers, not licensed ports
Optics16G vs 32G SFP+32G / 64G media planMixing speeds without HBA/array alignment
HADual fabric A/BIdentical duplicationSingle-fabric CapEx that fails audit
SupportHuawei support yearsTruFOS / NX-OS support yearsUnequal entitlement years on sticker compare
Supply riskPending confirmation after 2019 controlsATP on MDS / Brocade / TGStorTreating rumor as published EOM

TGStor sits on this equal-BOM sheet as a product-name path, the same layer as Dell on the Gen 7 / Gen 8 OEM maps — not a 146-row TG- dump. Search part numbers on SKU Lookup (TGStor).

Huawei SNSOEM peerTGStor product name
SNS3664 / SNS3764G620 / G620-3TGStor G610 (no TGStor G620 on the Q4 2026 line)
SNS3696EG630TGStor G630
SNS5604 / SNS5704X6-4 / X6-4-3not listed — TGStor director product is X7-4, not X6
SNS5608 / SNS5708X6-8 / X6-8-3not listed — TGStor director product is X7-8, not X6

Limitation of the SNS route: this lineup is Gen6-class density in the channel table. If the estate primary path is Gen7 64G or X7 director density, you must verify Huawei Gen7 SNS availability formally or move CapEx weight to MDS / Brocade Gen7 / TGStor columns. Do not invent a Huawei Gen7 SNS SKU list here.

For storage-side peers inside Huawei estates, Dorado arrays remain a separate BOM (see the Dorado vendor hub) — fabric switches and flash arrays must not share a single undifferentiated CapEx line.

Fit / Unfit Decision Boundary

Quick Answer: Fit when OceanStor arrays already sit behind SNS fabrics and CapEx needs exact Huawei codes for Gen6 32G refresh. Unfit when Gen7 64G / X7 density is mandatory without Huawei Gen7 proof, or when buyers assume unlimited new SNS build without a dual-path RFQ after 2019 export-control risk.

Fit

  • Existing OceanStor storage + SNS fabric operations team and zoning runbooks.
  • Gen6 32G host/array optics plan that reuses 32G SFP+ inventory.
  • Procurement systems that require Huawei commercial codes (0235… / 0623…) on the PO.
  • Equal-BOM shortlist that still wants MDS / Brocade / TGStor columns for ATP insurance.

Unfit

  • Primary design requires Gen7 64G edge or X7-class density without a confirmed Huawei SNS Gen7 path.
  • Buyer treats soft channel “OEM stopped” rumors as a published Huawei EOM for SNS3664/3696E/5604.
  • Ethernet-only IP SAN / NVMe-oF Ethernet designs with no FC fabric requirement.
  • Quotes that list only OEM nicknames (G620) without Huawei codes and support years.

RFQ How-To Steps

Quick Answer: Lock SNS model + OEM peer + Huawei code, then itemize ports, optics, dual fabric, and support years. Peer MDS / Brocade / TGStor product names (G610 / G630 / X7, not G620 or X6). Soft prices and post-2019 supply continuity stay industry estimate / pending confirmation.

  1. Step 1 — Freeze identity. For each line write Huawei product (for example SNS3696E), OEM peer (G630), Huawei code (02354YFF or 02354YFG), and the TGStor product-name peer (G610 / G630 / X7 — no G620, no X6).
  2. Step 2 — Ports versus feature packs. State active ports and whether the enterprise feature pack is included in that commercial code; add PoD-style expansion lines if the design grows.
  3. Step 3 — Optics and media. Separate 16G vs 32G SFP+, blade optics, ISL optics, and spares. Match HBA and array speeds.
  4. Step 4 — Dual fabric A/B. Duplicate chassis or directors; balance ISL counts; never CapEx a single fabric as “HA complete.”
  5. Step 5 — Support equalization. Align support years and any TruFOS-class / management entitlements across all vendor columns.
  6. Step 6 — Peer columns. Run Cisco MDS, Broadcom Brocade (G620/G630/X6 and Gen7 G720/X7 where relevant), and TGStor product names (G610 / G630 / X7 — no G620, no X6) as alternate supply — not as SNS aliases.
  7. Step 7 — Risk labels. Soft channel prices and OEM stop-supply rumors = industry estimate / pending confirmation. Verify Huawei Info-Finder + formal RFQ reply before PO.

Common RFQ Pitfalls

Quick Answer: The expensive mistakes are code/OEM mismatches, mixing legacy EOM models into Gen6 CapEx, assuming max ports ship licensed, equating SNS with TGStor, and treating Broadcom G620 EOL as automatic Huawei SNS EOM without dual confirmation on Huawei Info-Finder plus a formal RFQ reply.

  • Nickname-only quotes: “G620 × 4” without 02354YFC / 02354YEY and 16G vs 32G speed fails receiving and support entitlement checks.
  • Legacy cliff bleed: Pasting SNS2124 / SNS2224 EOM dates onto SNS3664 CapEx language creates false urgency or false EOL claims.
  • Feature pack blindness: 02354YFF (48×32G) is not the same commercial line as 02354YFG (96×32G + enterprise feature pack).
  • Blade / chassis mix: 06230887 belongs with 5604/5608; 06231256 belongs with 5704/5708 — do not cross without vendor confirmation.
  • SNS = TGStor confusion: Different brands, different commercial SKUs, different warranty sellers of record.
  • Unlabeled soft prices: Channel corridors without “industry estimate / pending confirmation” become fake public price claims.

Real-World Deployment Scenarios

Quick Answer: Map the three scenarios below to your workload, facility, and commercial constraints before freezing CapEx. Equal-BOM RFQs should cite which scenario drives the shortlist.

Scenario 1: Domestic Policy + Legacy Brocade Core (Interop Bound)

Workload Profile: New SNS edge switches must ISL into existing Brocade directors.

Architectural Fit: Lab-prove zoning, ISL, and NPIV behavior before production; treat “compatible” as a tested matrix, not a brochure claim.

Scenario 2: Greenfield Dual-Vendor Fabric (Risk Bound)

Workload Profile: Procurement mandates dual sources for directors and edges.

Architectural Fit: Keep firmware/support RACI per vendor; shared optics policies reduce finger-pointing.

Scenario 3: Array-Attached Edge Refresh (Cost Bound)

Workload Profile: Only host/array edges refresh; core stays Brocade.

Architectural Fit: Size SNS models to edge port counts and optics first; defer director rip-and-replace.

Frequently Asked Questions

Quick Answer: Map each SNS buy to a Huawei code; keep SNS distinct from TGStor; TGStor sells X7-4 and X7-8, not an X6. Do not invent Huawei EOM for the Gen6 table; treat Broadcom G620 EOL as a Brocade-branded cliff that must be dual-checked against Huawei lifecycle.

02354YFC is the Huawei commercial code for OceanStor SNS3664 mapped to the G620 OEM class at 24 ports × 16G in the channel lineup table used for this guide. Always confirm the code against Huawei Info-Finder and the seller quote before CapEx freeze.

No. OceanStor SNS is Huawei’s Fibre Channel SAN switch brand historically aligned to Brocade Gen6-class platforms (G620/G630/X6). TGStor is a separate Huacun Zhigu portfolio (G610–G730 / X7). Treat them as peer supply paths on an equal-BOM RFQ — not interchangeable SKUs.

As of 2026-08-25, no public Huawei EOM/EOS bulletin was found for these exact table SKUs on the OceanStor SNS life-cycle notice list. Older models such as SNS2124 and SNS2224 do have documented EOM dates — do not mix those cliffs into the current Gen6 table.

Broadcom published Brocade-branded G620 platform EOL with Last Customer Ship around January 31, 2025, FOS End-of-Availability January 31, 2027, and End-of-Support January 31, 2030 (verify on broadcom.com EOL). Huawei SNS lifecycle may differ — label any cross-map as pending confirmation and dual-quote Gen7 peers.

Channel table maps Gen6 blade code 06230887 (48 ports × 32G) to SNS5604 / SNS5608 chassis, and Gen7 blade code 06231256 (48 ports × 32G) to SNS5704 / SNS5708. Never mix blade generations across chassis families without vendor confirmation on the RFQ.

Yes — TGStor X7-4 / X7-8, same ASIC path as Dell ED-DCX7. SNS X6 directors do not map to a TGStor X6 box. TGStor is a channel product path, not Huawei SNS, and is not a legal official Broadcom authorized OEM claim.

References

Quick Answer: Validate SNS models on Huawei Enterprise Support, peer G620 lifecycle on Broadcom’s EOL index, and size MDS directors from Cisco public datasheets. Soft prices and OEM stop-supply rumors stay industry estimate / pending confirmation — this buying guide is not a published price list.

Primary identity source for codes and configs: channel OceanStor SNS positioning table (product / OEM model / Huawei code / config), reviewed 2026-08-27. Soft channel prices remain industry estimate / pending confirmation.

Key Takeaway

Key Takeaway: CapEx OceanStor SNS on Huawei codes plus OEM peers, equalize Gen6 32G ports/optics/dual fabric, and keep older EOM models out of the Gen6 table. Dual-quote MDS / Brocade / TGStor; leave soft supply risk labeled pending confirmation. BENQUAN GLOBAL LIMITED supplies OceanStor SNS FC switch configurations with competitive pricing.

Not sure your SNS BOM codes match the OEM peer column?

If Huawei 0235… / 0623… codes, Gen6 ports, optics, dual fabric, or MDS / Brocade / TGStor peer counts are still soft, request a free compatibility and delivery risk assessment before CapEx freeze.

Free Compatibility & Delivery Risk Assessment