Is the KunLun G8680 V3 a factory-locked 8x Ascend 910 node?

BOM-risk checklist for KunLun G8680 V3 (02315QNK): 8× Ascend 910, power cables, Super-Care, third-party 400GbE NICs — freeze RFQ lines before PO.

Quick Take

Quick Take: KunLun G8680 V3 ordering SKU 02315QNK is a factory-locked 8× Ascend 910 node. RFQs fail when wall and PDU C19 cables, Super-Care 8813Y344-024, U.2 NVMe expansion, or third-party 400GbE NICs stay off the PO. Channel lead time near 60 days is an industry estimate pending confirmation — not ATP.

This page is a procurement BOM-risk guide, not a price list. It restates part numbers and configuration atoms from a channel CPQ leaf so buyers can freeze equal assumptions before CapEx. Public money figures from any quote workbook are stripped by policy. Use the checklist when you are building Ascend training or inference racks and need chassis, cables, support, and optics on one comparable brief.

What KunLun G8680 V3 Is — Fit and Unfit

Quick Answer: KunLun G8680 V3-A800I A3 (02315QNK) is an OEM-locked Ascend 910 eight-accelerator appliance with four Kunpeng 920 hosts. It fits buyers who accept Huawei Ascend stack lock-in and need a single-SKU chassis freeze. It is unfit for NVIDIA CUDA-only stacks, ad-hoc GPU mix, or RFQs that omit power, care, and third-party 400G lines.

Definition: Huawei KunLun G8680 V3 is a rack-scale AI compute appliance family. The marketing string KunLun G8680 V3-A800I A3 maps to ordering part 02315QNK. Channel notes state the factory can only ship this locked bundle — buyers cannot pick-and-mix Ascend count, host CPU, or onboard NIC mix on that leaf without a new factory config path.

Fit: Ascend 910 training or inference pods; buyers who want one chassis SKU plus explicit cable and care lines; multi-rack rollouts that treat 30-node scale as an example planning unit, not a named customer deal.

Unfit: Teams that must stay on NVIDIA CUDA toolchains; projects that need factory-supplied 400GbE NICs (this leaf does not include them); CapEx freezes that quote chassis only and hope facilities and optics appear later.

Platform context for Ascend accelerators is published on Huawei’s Ascend product materials. Cross-check accelerator generation and interconnect assumptions against current vendor documentation before you treat any channel leaf as final ATP.

Locked OEM Bundle — SKU 02315QNK Spec Snapshot

Quick Answer: Buyers should treat the A800I A3 leaf as non-mixable: Ascend count, Kunpeng host set, DDR5, and onboard 100GE/25GE travel together under one ordering part. Any capacity growth belongs on separate U.2 lines, and every responder must restate the factory lock before CapEx freezes.

LineQty (per node)What to freeze on RFQ
Ordering SKU102315QNK / KunLun G8680 V3-A800I A3
Accelerators8Ascend 910 (factory locked)
Host CPUs4Kunpeng 920 7286C, 80 cores @ 3.0 GHz
Memory3232 GB DDR5 DIMMs
Boot / OS SSD2480 GB SATA SSD
Base NVMe23840 GB NVMe SSD
Onboard net2+22× 100GE and 2× 25GE
Label / kit10223YFDX BMC label, hang-ear logo, RoHS pack

Channel BOMs often add +2× 3.84 TB U.2 NVMe after the base dual 3840 GB drives when capacity grows with workload. That expansion is a classic BOM risk: slots, firmware, and thermal headroom must be explicit on the purchase order. Do not assume free empty bays or silent factory upgrade paths.

Lead time noted on channel headers near 60 days is an industry estimate / pending confirmation. Require dated ATP for chassis, cables, Super-Care entitlement, and third-party optics against one go-live — never paste a soft header into CapEx as a firm ship date.

Power Cables and Label Kit — Lines GPU RFQs Often Drop

Quick Answer: Per-node templates use twelve wall AC C19 cables 04155447-002 and twelve PDU AC C19 cables 04156289, both 3 m China 250V16A KunLun-specific. Add label kit 0223YFDX. Chassis without matching C19 sets cannot energize to plan even when Ascend iron arrives on time.

GPU server RFQs frequently price the appliance and forget facility cables. On this KunLun leaf the power section is first-class CapEx:

  • 04155447-002 (W04155447-002) — wall AC C19, 3 m, China AC 250V16A, KunLun-specific — qty 12
  • 04156289 (W04156289) — PDU AC C19, 3 m, China PDU 250V16A — qty 12
  • 0223YFDX — product / BMC labels, hang-ear logo, RoHS statement pack

Facility teams must map wall versus PDU feed before PO. Wrong cable family (generic C19 vs KunLun-specific pinout or jacket) creates dock rejects. Put both SKUs and quantities on the same RFQ column as 02315QNK so logistics and rack teams share one BOM truth.

Super-Care — 8813Y344-024 for 36 Months

Quick Answer: Support SKU 8813Y344-024 is Super-Care advanced standard plus 7×10×ND for 36 months, config-tied to 02315QNK. Buyers who ship chassis without care entitlement face go-live gaps on parts and response. Put years and ND class on the PO beside the node SKU.

The care leaf string mirrors the locked compute description (8× Ascend 910, 4× Kunpeng 920 7286C, memory and storage mix, 100GE/25GE) then appends Super-Care advanced standard with 7×10×ND for 36 months. That means entitlement is configuration-bound — swapping NVMe counts or NIC mix after the fact can desync the care SKU from the iron.

RFQ rule: one CapEx freeze must list chassis + cables + Super-Care years together. If finance wants a shorter care term, require a written alternate SKU from the channel — do not silently cut months off 8813Y344-024.

Third-Party 400GbE NIC and QSFP56-DD Optics Gap

Quick Answer: Channel lines add eight 400GbE NICs with multimode QSFP56-DD SR8 optics (MPO, 850 nm, 100 m). Factory does not supply them. Gate RFQ on brand, firmware, warranty, switch compatibility, and lead time as separate risk — not as a free chassis option.

Onboard networking on 02315QNK is 2× 100GE + 2× 25GE. High-bandwidth Ascend fabrics often need additional 400GbE host NICs. Channel remarks are explicit: the factory has no leaf for these cards — configuration uses third-party NIC plus optics packages.

What to force onto the 400G RFQ lines

  • NIC model, PCIe generation, and driver/firmware branch for the Kunpeng host OS
  • Optics: QSFP56-DD, multimode SR8, MPO, 850 nm, 100 m reach — qty 8 to match NIC count
  • Switch-side peer optic and FEC assumptions
  • Warranty and RMA path (third-party vs chassis Super-Care)
  • Lead time pending confirmation, separate from chassis ATP

Limitation of this guide: it does not certify a specific third-party NIC brand. Buyers must name the approved vendor list in the RFQ so quotes stay equal. Mixing unverified cards across a 30-node planning scale multiplies firmware debt.

Comparison — Base Locked Bundle vs Expanded Channel BOM

Quick Answer: Base 02315QNK covers Ascend, Kunpeng, DDR5, dual SATA, dual NVMe, and 100GE/25GE. Expanded BOMs add U.2 NVMe, twelve-plus-twelve C19 cables, Super-Care 36 months, and eight third-party 400GbE NIC/optic sets. CapEx that quotes only the chassis understates rack go-live risk and ATP alignment.

DimensionBase locked leaf (02315QNK)Expanded channel BOM (typical)
Compute8× Ascend 910 + 4× Kunpeng 920 7286CSame (locked)
Memory / OS disk32× 32 GB DDR5; 2× 480 GB SATASame
NVMe2× 3840 GBBase + 2× 3.84 TB U.2 expansion
Onboard net2× 100GE + 2× 25GESame
Fabric NICsNot in factory leaf8× third-party 400GbE + QSFP56-DD SR8
PowerOften omitted in chassis-only quotes04155447-002 ×12 + 04156289 ×12
SupportOptional / deferred8813Y344-024, 36 mo, 7×10×ND
Lead time signalSoft channel note~60 days industry estimate / pending confirmation

This route’s limitation: expanded columns still depend on third-party NIC qualification and facility AC standards. Equal-BOM RFQs must state those assumptions or the “cheaper” chassis-only column wins on paper and fails at rack power-on.

HowTo — Six Steps to Freeze the KunLun Ascend RFQ

Quick Answer: Lock 02315QNK, declare NVMe expansion, add both C19 cable SKUs at qty 12, attach Super-Care 8813Y344-024 for 36 months, gate eight third-party 400GbE NIC/optic lines, then submit one BOM-risk brief. Soft 60-day lead time stays pending confirmation until ATP is dated.

  1. Step 1 — Capture requirements. Workload (train vs infer), node count, rack power budget, and fabric speed (100GE onboard vs 400GbE add-on).
  2. Step 2 — Lock chassis SKU. Confirm 02315QNK / KunLun G8680 V3-A800I A3 and the OEM locked-bundle note in writing.
  3. Step 3 — Declare storage deltas. Base 2× 3840 GB NVMe plus any +2× 3.84 TB U.2 lines with slot IDs.
  4. Step 4 — Attach facility and kit. 04155447-002 ×12, 04156289 ×12, 0223YFDX ×1.
  5. Step 5 — Attach Super-Care. 8813Y344-024, 36 months, 7×10×ND, config-tied.
  6. Step 6 — Gate third-party 400G and submit. Eight NIC + QSFP56-DD packages with warranty and lead-time fields; send one brief via rfq.html?intent=bom-risk.

Equal-BOM fields every responder must answer

  • Chassis SKU and locked-config confirmation
  • NVMe expansion qty and form factor
  • Wall vs PDU cable SKUs and lengths
  • Super-Care years and ND class
  • 400GbE NIC brand list + optic SKU assumptions
  • Dated ATP for iron, cables, care, and optics (soft estimates flagged)

Resolve public part strings in SKU Lookup when the brand is indexed; Huawei Ascend appliance leaves often require a part-list RFQ rather than a public list-price lookup.

Common Pitfalls That Break Ascend Go-Live

Quick Answer: Four failures dominate: chassis-only CapEx, silent NVMe expansion, missing KunLun-specific C19 sets, and treating third-party 400GbE as factory-included. A fifth failure is treating a 60-day channel header as firm ATP. Fix all five on the RFQ before any deposit wires.

  1. Chassis-only PO. Iron arrives; cables and care do not. Rack sits dark.
  2. Unstated U.2 expansion. Capacity plan assumed four NVMe; PO shipped two. Rebuild delays training start.
  3. Generic C19 substitution. Non-KunLun cable SKUs fail dock or safety review.
  4. Optics assumed in Super-Care. Third-party NIC warranty is not 8813Y344-024.
  5. Soft lead time as ATP. Sixty-day industry estimates need written confirmation per line, not a header copy-paste.

Frequently Asked Questions

Quick Answer: Freeze 02315QNK as the locked Ascend 910 chassis, put both C19 cable SKUs and Super-Care 8813Y344-024 on the same PO, treat 400GbE NICs as third-party, and submit one BOM-risk RFQ. Soft lead times stay pending confirmation until ATP is dated per line.

02315QNK maps to KunLun G8680 V3-A800I A3: eight Ascend 910 accelerators, four Kunpeng 920 7286C CPUs, 32× 32 GB DDR5, dual 480 GB SATA SSD, dual 3840 GB NVMe, and 2× 100GE plus 2× 25GE. Factory ships it as a locked bundle — confirm config freeze on every RFQ.

Wall AC C19: 04155447-002 (W04155447-002), 3 m China AC 250V16A, qty 12. PDU AC C19: 04156289 (W04156289), 3 m China PDU 250V16A, qty 12. Missing either set stalls rack energization even when the chassis arrives.

No. Channel BOMs often add eight third-party 400GbE NICs with multimode QSFP56-DD SR8 optics (MPO, 850 nm, 100 m). Treat compatibility, warranty, firmware, and lead time as separate RFQ gates — the factory leaf does not include them.

8813Y344-024 is Super-Care advanced standard plus 7×10×ND for 36 months, tied to the 02315QNK config string. Put support years and response class on the same PO as the chassis so entitlement does not trail iron.

List 02315QNK, NVMe expansion if any, label kit 0223YFDX, both power cable SKUs at qty 12, Super-Care 8813Y344-024, and third-party 400GbE lines. Submit one brief on rfq.html with intent=bom-risk after you freeze quantities and delivery window.

References

Quick Answer: Use Huawei Ascend and enterprise computing documentation to validate accelerator and host assumptions, then equalize cables, care, and third-party optics on your RFQ. Vendor pages are the spec source; channel soft dates stay pending confirmation until dated ATP is written per line.

Author: BENQUAN GLOBAL LIMITED. Channel BOM structure restated for RFQ risk only; no unit or total commercial prices from quote workbooks are published on this page.

Key Takeaway

Key Takeaway: Treat 02315QNK as a locked Ascend 910 chassis, then force cables 04155447-002 / 04156289, Super-Care 8813Y344-024, NVMe expansion, and eight third-party 400GbE lines onto one CapEx freeze. Soft 60-day lead time is pending confirmation. BENQUAN GLOBAL LIMITED supplies KunLun G8680 V3 Ascend packages with competitive pricing.

Missing cables, care, or 400GbE on your Ascend BOM?

If KunLun G8680 V3 lines omit power cables, Super-Care years, NVMe expansion, or third-party 400GbE NIC risk, request a free compatibility and delivery risk assessment before CapEx freezes.