Quick Take
Quick Take: Atlas 900 A3 SuperPoD is a hardware supernode: up to 384 Ascend 910 NPUs across twelve liquid-cooled compute cabinets plus four air-cooled bus cabinets. LingQu 630 V1 is the L2 UnifiedBus switch — 48 QSFP-DD LQC ports, under 1200 watts — not an Ethernet ToR. CloudMatrix 384 is a cloud instance name. Do not invent SuperPoD kilowatts.
What This SuperPoD RFQ Is
Quick Answer: A SuperPoD RFQ is a multi-cabinet Ascend scale-up buy plus, when the design leaves the compute cabinet, a first-class LingQu 630 V1 line. It is not a CloudMatrix cloud SKU, not a KunLun eight-NPU node, and not an Ethernet fabric brief. UnifiedBus LQC stays inside the SuperPoD; RoCE scale-out is a separate column.
Definition: An Atlas 900 A3 SuperPoD is a Huawei hardware supernode that treats up to 384 Ascend 910 processors as one computer over UnifiedBus. The public form factor is twelve 47U compute cabinets and four 47U bus-equipment cabinets. LingQu 630 V1 is the L2 bus switch that fills those bus cabinets. CloudMatrix 384, in Huawei’s September 2025 keynote, is a cloud service instance built on SuperPoDs — put it on a cloud column, not on the iron PO.
- Fit this page: On-prem or colo SuperPoD CapEx that must name cabinets, logical card tier, LingQu, and LQC optics before facility sign-off.
- Boundary: Inventing SuperPoD kilowatts; treating CloudMatrix as a hardware SKU; copying 56 LingQu boxes onto an Atlas 900 A3 PO without a quote; ordering LingQu as a generic 400GbE ToR; mixing KunLun 02315QNK into the SuperPoD cabinet count.
KunLun G8680 V3 remains the 8-NPU locked node on SKU 02315QNK. That leaf does not become a SuperPoD by multiplying quantity. Atlas 950 (keynote: fourth quarter 2026) and Atlas 960 stay on the unfit list for this 384 page.
Atlas 900 A3 SuperPoD Official Numbers
Quick Answer: Official maximums are 384 Ascend 910 NPUs, 192 Kunpeng 920 CPUs, 307.2 or 288.7 PFLOPS at FP16, and 784 GB/s bidirectional D2D. On-chip memory is 384 times 128 GB. Logical tiers run 16 through 384 cards. Hall feed is dual 380 V AC — no published SuperPoD kilowatt.
The enterprise product page writes Ascend 910, not 910C. The 2025 keynote uses 910C for chip generation. Keep 910 on this table. Do not fill empty cells with channel marketing teraflops that disagree with 307.2 / 288.7 PFLOPS at FP16.
| Item | Official public value | RFQ note |
|---|---|---|
| Form | 12 × 47U compute + 4 × 47U bus | Compute-only SuperPoD is allowed — say so |
| NPU | Up to 384 × Ascend 910 | Logical tiers start at 16 cards |
| CPU | Up to 192 × Kunpeng 920 | Do not invent host SKUs |
| System memory | Up to 1536 DDR5; 5200 MT/s; 64/96 GB | DIMM size is a freeze field |
| On-chip memory | Up to 384 × 128 GB; 3.2 TB/s each | Unified address 48 TB on the same page |
| AI compute | 307.2 / 288.7 PFLOPS @ FP16 | Two official peaks — quote both or name which |
| D2D | 784 GB/s bidirectional | UnifiedBus, 1:1, 200 ns single hop (page bullets) |
| Local storage | Up to 480 × 2.5-inch drives | Not a default populate |
| Power | 3-phase 380 V AC + 3-phase 380 V AC | No SuperPoD-total kW on this page |
| Cooling | Liquid compute; air bus | See LingQu air-cooled row |
| Cabinet size | 2250 × 600 × 1150 mm, doors excluded | Both cabinet types |
| Ambient | 5 °C to 40 °C | Facility envelope, not a CDU spec |
LingQu 630 V1 Specs and Topology
Quick Answer: LingQu 630 V1 is an air-cooled L2 UnifiedBus switch: 88.1 by 442 by 600 millimeters, 20 kilograms, 48 QSFP-DD cages as two 200G LQC lanes each, dual PSU, under 1200 watts with optics. L1 lives on the compute-node bus board. L2 is this box. Do not treat the cages as Ethernet RoCE.
Put LingQu on its own RFQ lines. It is not a “cabinet accessory” and not a replacement for the scale-out RoCE leaf. User guide 03 (EDOC1100463086) is the public spec source. This page does not invent a commercial ordering SKU for the chassis or for the QSFP-DD optics.
| Item | Official public value |
|---|---|
| Service ports | 48 × QSFP-DD 400G (2 × 200G per cage, one 200G to each switch chip, LQC) |
| Management | 1 Ethernet management port + 1 serial |
| Size / weight | 88.1 × 442 × 600 mm / 20 kg |
| Cooling | Air; 4 fan modules, 3+1; hot-swap; port-side or PSU-side intake |
| Power modules | 2, 1+1 |
| Input | AC 220–240 V; HVDC 240 V; LVDC −48 to −60 V or +48 V |
| Max power | < 1200 W (rated 1200 W full optics; 700 W full cables) |
Topology language that repeats across SuperPoD and Atlas 800T A3 guides: LQC carries the SuperPoD, often as seven planes. L1–L2 runs copper or fiber by scale. Scale-out RoCE still leaves the mixed switch board toward an external Ethernet fabric — those optics stay on a different line from LingQu LQC modules.
Fifty-six plus forty-eight is not an Atlas 900 A3 hard count. The Atlas 800T A3 architecture page shows a 384-card optical example of 56 LingQu devices and 48 SuperPoD servers. Channel reprints paste that pair onto 900 A3. Freeze 900 A3 LingQu quantity against the SuperPoD user guide or a dated quote. Do not invent units per bus cabinet. Do not multiply 56 × 1200 W to invent hall power.
Cabinets and Facility Envelope
Quick Answer: Compute cabinets are liquid-cooled; bus-equipment cabinets and every LingQu 630 V1 are air-cooled. SuperPoD hall feed is dual three-phase 380 V AC. LingQu accepts AC, 240 V HVDC, or plus-or-minus 48 V. Operating air is 5 to 40 degrees Celsius. Do not hang a CDU loop on the LingQu row.
A sixteen-cabinet plan is the public maximum form, not a mandatory PO. If the design stays inside compute cabinets, the RFQ must say “no bus cabinet / no LingQu L2.” If the design spans cabinets, the RFQ must name LingQu 630 V1, copper versus fiber, and airflow direction (front or rear mount).
- Compute cabinet: 2250 × 600 × 1150 mm, liquid, dual 380 V AC at the SuperPoD feed. Pair facility review with the CDU BOM checklist and rack power planning — those pages still do not invent SuperPoD kW.
- Bus cabinet: same outline, air-cooled, holds LingQu 630 V1. Each switch is under 1200 W and uses its own PSU family, not the compute-tray 380 V story.
- Management: public notes place node iBMC and cabinet RM211 on a GE management plane (CCAE or third-party). Treat management switching as a line, not as LingQu.
SuperPoD versus LingQu versus KunLun versus Cloud
Quick Answer: SuperPoD is the multi-cabinet scale-up system. LingQu 630 V1 is the L2 LQC switch inside the bus cabinet. KunLun G8680 V3 is an eight-NPU locked node. CloudMatrix 384 is a cloud instance name. Same ASIC generation does not put those four rows on one purchase order.
| Dimension | Atlas 900 A3 SuperPoD | LingQu 630 V1 | KunLun G8680 V3 | CloudMatrix 384 |
|---|---|---|---|---|
| What you buy | Hardware supernode | L2 UnifiedBus switch | 8× Ascend 910 node | Cloud instance |
| Public count | Up to 384 NPU / 192 CPU | 48 × QSFP-DD LQC | SKU 02315QNK, qty 1 node | Not a cabinet count |
| Cooling | Liquid compute; air bus | Air, <1200 W | Node-level (see that RFQ) | Provider hall |
| Fabric | UnifiedBus inside; RoCE out | LQC only | Onboard 100GE/25GE + optional third-party 400GbE | Provider fabric |
| On this PO? | Yes, if on-prem SuperPoD | Yes, if bus cabinets exist | Separate column | No hardware SKU |
A GB200 NVL72-class scale-up is a different vendor envelope. This page does not publish peer kilowatts or dollar TCO. If a brief asks for NVIDIA versus SuperPoD, equalize card count, memory, and facility rules first — see the cluster sizing guide.
Who Should Use This Notice
Quick Answer: Fit this page if you are freezing an on-prem Atlas 900 A3 SuperPoD and must decide whether LingQu 630 V1 and bus cabinets are on the PO. Unfit if you only need a KunLun eight-NPU node, a CloudMatrix instance, an Ethernet-only leaf, or an Atlas 950/960 roadmap buy.
- Fit: Logical tiers from 16 to 384 cards; liquid-ready halls that can also air-cool bus cabinets; buyers who must split LQC optics from RoCE optics.
- Unfit: Cloud-only CloudMatrix 384; KunLun-only 02315QNK; inventing 56 LingQu onto 900 A3; expecting liquid cooling on LingQu; quoting SuperPoD total kW from a newsletter.
How to Build the RFQ
Quick Answer: Six steps: lock the card tier, say whether bus cabinets and LingQu 630 V1 are in scope, freeze copper or fiber as LQC not RoCE, split liquid compute from air LingQu power, keep KunLun and CloudMatrix off this column, then send the split BOM to RFQ.
- Step 1 — Lock the logical card tier. State 16, 32, 64, 128, 256, or 384. Do not assume every SuperPoD PO is a full 384.
- Step 2 — State bus cabinets and LingQu 630 V1. Write whether this PO includes bus-equipment cabinets and LingQu 630 V1. A compute-only SuperPoD is allowed.
- Step 3 — Freeze copper or fiber on L1 to L2. Accept LingQu cages as LQC QSFP-DD, two 200G lanes per port, not generic RoCE 400GbE. Do not invent optic MPNs.
- Step 4 — Split facility feeds. Liquid on compute cabinets; air and under 1200 W per LingQu on bus switches. Compute hall feed is dual 380 V AC. Do not invent SuperPoD kilowatts.
- Step 5 — Separate KunLun and CloudMatrix columns. Keep G8680 V3 eight-NPU nodes and CloudMatrix instances off the SuperPoD hardware column.
- Step 6 — Send the split BOM to RFQ. List SuperPoD cabinets, LingQu count as pending if Atlas 900 A3, support years, and scale-out RoCE as their own lines.
Common RFQ Pitfalls
Quick Answer: Common misses: burying LingQu as a cabinet spare, copying 56 plus 48 from Atlas 800T A3 onto 900 A3, treating QSFP-DD as Ethernet RoCE, hanging liquid cooling on air-cooled LingQu, inventing SuperPoD kilowatts, and multiplying KunLun nodes until they “equal” 384.
- LingQu off the PO. Cross-cabinet UnifiedBus does not appear because someone called it a kit.
- 56+48 as 900 A3 law. That pair is the 800T A3 official optical example until a 900 A3 quote prints a count.
- RoCE optics on LingQu cages. LQC is not Ethernet 400GbE.
- CDU on the bus row. LingQu is air-cooled; compute cabinets take the liquid loop.
- Newsletter kW. Official SuperPoD power is dual 380 V AC, not a published megawatt.
- CloudMatrix on the hardware PO. Instance name, not a cabinet SKU.
- KunLun math. Forty-eight times 02315QNK is still forty-eight nodes, not a SuperPoD.
Frequently Asked Questions
Quick Answer: SuperPoD is the hardware supernode; LingQu 630 V1 is the L2 LQC switch. CloudMatrix 384 is a cloud instance. KunLun G8680 V3 is eight NPUs. Fifty-six LingQu boxes are an 800T A3 example. LingQu ports are not Ethernet RoCE. Bus switches are air-cooled.
Atlas 900 A3 SuperPoD is a Huawei hardware supernode: up to 384 Ascend 910 NPUs and 192 Kunpeng 920 CPUs across twelve 47U liquid-cooled compute cabinets plus four 47U air-cooled bus cabinets. Official peak is 307.2 or 288.7 PFLOPS at FP16. It is not a CloudMatrix instance SKU.
LingQu 630 V1 is the L2 UnifiedBus switch that sits in the bus-equipment cabinet. It presents 48 QSFP-DD 400G ports as two 200G LQC lanes per cage, weighs 20 kg, and draws under 1200 W. It is not an Ethernet top-of-rack switch and not an NPU node.
No. Huawei’s September 2025 keynote describes CloudMatrix 384 as a cloud service instance built on Atlas 900 A3 SuperPoDs. Put SuperPoD cabinets and LingQu 630 V1 on the hardware PO. Do not treat CloudMatrix as a cabinet or switch part number.
KunLun G8680 V3 ordering SKU 02315QNK is a factory-locked eight Ascend 910 node. A SuperPoD is a multi-cabinet scale-up system with optional LingQu L2. Keep the 8-NPU node and the 384-NPU SuperPoD on separate RFQ columns.
No. Fifty-six LingQu devices plus 48 servers is the official Atlas 800T A3 384-card optical example. Atlas 900 A3 quantity stays pending the SuperPoD user guide or a dated quote. A compute-only SuperPoD may have no bus cabinet at all.
No. Those cages carry LQC, Huawei’s cache-coherent UnifiedBus. Scale-out RoCE leaves the mixed switch board to an external Ethernet fabric and needs its own optics lines. Do not quote generic 400GbE RoCE modules as LingQu peers.
No. Official SuperPoD cooling is liquid on compute cabinets and air on bus-equipment cabinets. LingQu 630 V1 is air-cooled with four fan modules in a 3+1 group. Do not specify a CDU loop on the LingQu rows.
References
Quick Answer: Validate SuperPoD cabinets on the enterprise Atlas 900 A3 page. Validate LingQu ports and watts on user guide EDOC1100463086. Treat 56 plus 48 as the Atlas 800T A3 architecture example. The September 2025 keynote is the CloudMatrix naming source. This page publishes no list dollars.
- Huawei Enterprise — Atlas 900 A3 SuperPoD product page
- LingQu 630 V1 User Guide 03 (EDOC1100463086) — feature specs
- Atlas 800T A3 User Guide — architecture (56 LingQu + 48 servers example)
- Huawei — SuperPoD interconnect keynote (September 2025)
- Atlas 900 A3 SuperPoD User Guide 13 (EDOC1100401572)
Primary numeric sources: enterprise SuperPoD table and LingQu 630 V1 user-guide 03, retrieved 2026-08-27. Soft hall power and lead times remain pending confirmation.
Key Takeaway
Key Takeaway: Freeze the logical card tier, then say whether LingQu 630 V1 and bus cabinets are on the PO. Keep LQC optics off the RoCE column. Do not copy 56 boxes onto Atlas 900 A3 or invent SuperPoD kilowatts. BENQUAN GLOBAL LIMITED supplies Atlas SuperPoD and LingQu 630 V1 configurations with competitive pricing.