Data Protection / Backup Deduplication / Cloud Bank

Do you size StoreOnce on ingest TB per hour, or on a dedupe claim?

Deduplicating backup appliances for ROBO to enterprise — StoreOnce 3660, 5260, and 5660 with Catalyst performance, optional 16/32Gb FC HBAs, and Cloud Bank object-storage tiering.

Quick Take

Quick Take: StoreOnce is a backup target, not primary storage, and the backup window picks the model before shelf capacity does. Ingest climbs from roughly 25 TB per hour on the all-HDD 3660 to about 105 TB per hour on the hybrid 5660. Quote usable terabytes, never dedupe multipliers.

Model Comparison (Gen4+ focus)

Quick Answer: Backup window drives model choice more than raw capacity. The all-HDD 3660 ingests roughly 25 TB per hour across 56 to 200 TB of local usable space, the hybrid 5260 reaches about 60 TB per hour, and the 5660 tops out near 105 TB per hour with just over a petabyte on premises.

Capacity and TB/hr figures follow HPE StoreOnce QuickSpecs / datasheet language and assume Catalyst where noted. Actual usable capacity and throughput depend on dataset, streams, and concurrent jobs. Related: MSA 2060, 32Gb FC switch guide, SKU Lookup. Request a quote.

Model Local usable (scale) With Cloud Bank (order of) Max Catalyst write (up to) Media
StoreOnce 3660~56–200 TB~600 TB class~25 TB/hrAll HDD
StoreOnce 5260~144–576 TB~1.7 PB class~60 TB/hrHybrid (SSD cache)
StoreOnce 5660~144 TB–1.1 PB~3.3–3.4 PB class~105 TB/hrHybrid (SSD cache)

Example base SKU often quoted: StoreOnce 3660 80 TB raw / ~56 TB usable starter (e.g. R6U02A class with 10× 8 TB LFF) expandable via upgrade kits — confirm current QuickSpecs on every RFQ.

Dedupe ratios are marketing multipliers. Quote on usable physical capacity for the retention you must keep on-prem; treat 20:1 “effective” numbers as planning scenarios, not guaranteed BOM math.

Overview

Quick Answer: A purpose-built deduplicating backup appliance rather than a primary array: Catalyst performs source-side or appliance-side dedupe, VTL and NAS targets cover legacy jobs, and replication plus federated management tie remote sites to a hub. Production LUNs stay on an MSA or midrange array; nightly copies land here.

Host Connectivity

Quick Answer: Every Gen4+ appliance arrives with 10GbE Base-T on the OCP slot, and up to four add-in HBAs extend it to 10GbE SFP, 10GBase-T, or 16Gb and 32Gb Fibre Channel. Match the fabric the backup software already uses, since Catalyst runs equally well over Ethernet or FC.

  • Ethernet Catalyst / NAS paths for many Veeam / Commvault / Data Protector designs
  • 16/32Gb FC when the backup network already sits on the SAN (see 32Gb FC buying guide)
  • Form factor scales with expansion shelves (3660 cited 2U up to 6U class builds; 5260/5660 larger)

Catalyst & Cloud Bank

Quick Answer: Catalyst is the dedupe protocol: it can reduce data at the backup server before transmission, on the appliance, or on the way to object storage, with the backup ISV keeping job control. Cloud Bank then copies selected Catalyst stores to public or private object targets for cheap long retention, and branch 3660s can replicate into a central 5260/5660 hub.

Catalyst backup

Integrates with supported ISVs so job control stays in the backup app while StoreOnce handles stores, copies, and bandwidth-aware replication.

Cloud Bank Storage

Write locally first, then copy selected Catalyst data to public/private object storage for cost-efficient long retention and DR copies.

Replication / fan-in

ROBO 3660 units can feed a larger 5260/5660 hub. Confirm fan-in limits and Catalyst copy policies per QuickSpecs revision.

Use Cases

Quick Answer: Secondary storage for VM, file, and database backups — never a stand-in for primary MSA, 3PAR, or Alletra arrays. Compact sites land on the 3660, data-center hubs needing tens of TB per hour of Catalyst ingest step up to 5260 or 5660, and Cloud Bank extends retention into object storage.

ROBO / mid-market backup

3660 for compact sites that still need appliance-grade dedupe and optional Cloud Bank offload.

Data center backup hub

5260 or 5660 when backup windows demand tens of TB/hr Catalyst ingest and hundreds of TB to PB local retention.

Next to primary block storage

Keep production on MSA 2062 / enterprise arrays; land nightly backups on StoreOnce.

Buying Checklist

Quick Answer: Size on two numbers before anything else: how many terabytes must stay on premises for the retention policy, and how fast the nightly window has to absorb them. Those two pick the model; host adapter count, expansion kits, an object-storage copy target, and the support term follow afterwards.

  1. Daily change rate and full/incremental window (TB/hr)
  2. On-prem retention usable TB (ignore optimistic dedupe until proven)
  3. Model: 3660 vs 5260 vs 5660
  4. Host: 10GbE and/or 16/32Gb FC HBA count
  5. Expansion shelves / upgrade kits
  6. Cloud Bank object target plan
  7. HPE support term and ISV Catalyst certification

Search HPE parts on SKU Lookup.

Frequently Asked Questions

Quick Answer: StoreOnce is a deduplicating backup target, not primary block storage, so production LUNs still belong on an MSA or midrange array. Object-storage tiering serves as a secondary copy destination rather than the fast landing zone, and 32Gb Fibre Channel matters only where backups already traverse the SAN.

The official StoreOnce Systems sheet is on HPE: PSN5196525USEN.pdf (hpe.com). This page is the RFQ ladder — Gen4+ usable capacity, Catalyst, and Cloud Bank — so you size a backup target before opening QuickSpecs. Confirm VTL/NAS ports on the quote.

No. It is a backup / dedupe appliance (Catalyst, VTL, NAS targets). Primary block workloads belong on MSA or midrange/enterprise arrays.

HPE positions Cloud Bank as a Catalyst Copy destination. Object storage latency/throughput make it unsuitable as the primary high-speed backup target.

Only if your backup design is FC-attached. Many Catalyst deployments run happily on 10GbE. Match the fabric you already operate.

Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: Fix the on-premises retention figure and the nightly ingest rate first; those two numbers choose between 3660, 5260, and 5660, and everything after that is adapters, shelves, and support years. Keep object storage as a copy tier. Match retention and cloud tier on the RFQ.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents