Quick Take
Quick Take: Equal-BOM RFQ for fourteen HPE ProLiant Gen11 chassis — 2× DL360 8SFF, 9× DL380 8SFF, 3× DL380 12LFF — from a channel planning sheet dated 21-Aug-2026. Freeze Face A (6542Y/6548Y+, MR408i/MR416i/SR932i, P84239) versus Face B (6418H/6558Q, MR216i, P70436) before CapEx. All Unit and Extended USD stay redacted.
Last updated: 2026-08-23 · catalog index prices stripped · Planning estimate only (not a binding HPE offer)
What This HPE Gen11 LOT3 Equal-BOM RFQ Is
Quick Answer: An equal-BOM RFQ freezes identical chassis counts, drive classes, controller families, memory speed, NIC/optics, iLO licenses, and localization options across channel responses. This brief covers a fourteen-host ProLiant Gen11 LOT3 mix with two incompatible SKU faces that share counts but not performance or RAID capability.
An HPE ProLiant Gen11 LOT3 equal-BOM RFQ is a line-item map buyers use when one CapEx lot mixes 1U density hosts with 2U SFF and 2U LFF capacity hosts. The structural quantities below come from a BOM planning sheet (21-Aug-2026). That sheet is a planning estimate only — not a binding HPE offer. Every Unit Price (USD), Extended List Price (USD), channel net, and total is redacted on this page; confirm commercials on a formal RFQ.
HPE’s public QuickSpecs position the ProLiant DL360 Gen11 as a 1U dual-socket Intel Xeon Scalable platform and the ProLiant DL380 Gen11 as a 2U dual-socket platform with 8SFF or 12LFF front-bay families. This RFQ freezes both form factors in one lot — do not treat a DL360-only or DL380-only reply as complete against the LOT3 brief.
- Density block:
P52499-B21DL360 Gen11 8SFF CTO ×2 - SFF capacity block:
P52534-B21DL380 Gen11 8SFF NC CTO ×9 - LFF capacity block:
P52533-B21DL380 Gen11 12LFF NC CTO ×3 - Shared fabric: Broadcom BCM57414 OCP3 +
845398-B2125Gb SFP28 SR optics - Management:
BD505AiLO Advanced (3yr feature support) per chassis
Part spellings for HPE SKUs can be cross-checked on SKU Lookup (HPE brand index) and the HPE price-list landing before you paste the equalized list into RFQ.
Chassis Quantities — 2× DL360 + 9× DL380 8SFF + 3× DL380 12LFF
Quick Answer: Lock fourteen CTO bases before accessories: two DL360 Gen11 8SFF, nine DL380 Gen11 8SFF, and three DL380 Gen11 12LFF. Dual 1600W Flex Slot PSUs, high-performance fans, Easy Install rails, and BD505A iLO Advanced ride one-for-one with each chassis — quotes that ship single-PSU or omit iLO fail install and remote ops.
Chassis count integrity is the first equal-BOM gate. Accessory multipliers follow chassis type: DL360 uses the 1U high-performance fan kit; both DL380 blocks use the 2U high-performance fan kit; every chassis takes two P38997-B21 1600W Flex Slot Platinum PSUs (4 / 18 / 6 total).
| Block | Base SKU | Qty | Form factor | PSU qty (lot) |
|---|---|---|---|---|
| Density | P52499-B21 | 2 | DL360 Gen11 8SFF 1U | 4 |
| SFF capacity | P52534-B21 | 9 | DL380 Gen11 8SFF 2U | 18 |
| LFF capacity | P52533-B21 | 3 | DL380 Gen11 12LFF 2U | 6 |
Factory-integrated (0D1) flags on CPU, drive, controller, NIC, and optics rows must stay with the parent chassis. Ad-hoc drive lines (15.36TB SAS RI on DL360; NVMe lot at the end) are separate order groups — do not assume they ship inside the CTO cage without the ad-hoc section.
Drive Classes — SAS RI, MU, 16TB LFF, NVMe Ad-Hoc
Quick Answer: Four media classes dominate CapEx risk: 15.36TB SAS 24G RI SFF for bulk flash, 3.2TB/3.84TB SAS MU for hotter tiers, 16TB SAS 7.2K LFF for capacity HDD, and a thirty-drive 15.36TB NVMe Gen4 ad-hoc lot whose PID drifts Face A versus Face B. Equalize media class and PID before ranking vendors on chassis stickers alone.
Drive misspellings and silent RI/MU swaps are the most common LOT3 failure mode. Quantities below are shared across both faces except the NVMe ad-hoc PID.
| Media class | SKU | Qty | Where used |
|---|---|---|---|
| 15.36TB SAS 24G RI SFF | P49045-B21 | 12 | DL360 ad-hoc block |
| 15.36TB SAS 24G RI SFF | P49045-B21 | 90 | DL380 8SFF (10× per host typical) |
| 3.2TB SAS 24G MU SFF | P49053-B21 | 4 | DL360 factory-integrated |
| 3.84TB SAS 12G MU SFF | P40512-B21 | 18 | DL380 8SFF |
| 3.84TB SAS 12G MU SFF | P40512-B21 | 6 | DL380 12LFF 2SFF stacking cage |
| 16TB SAS 12G 7.2K LFF | P23608-B21 | 42 | DL380 12LFF (14× per host) |
| 15.36TB NVMe Gen4 RI U.3 (Face A) | P84239-B21 | 30 | Lot-level ad-hoc |
| 15.36TB NVMe RI U.3 PS1010 (Face B) | P70436-B21 | 30 | Lot-level ad-hoc (drift) |
LFF hosts also carry P48811-B21 2SFF U.3 stacking cages and P51095-B21 2LFF LP secondary riser cages — quotes that ship 12LFF chassis without stacking/riser kits cannot land the MU SSD + LFF HDD mix in this brief.
Face A vs Face B Equal-BOM Drift Table
Quick Answer: Face A is the GPL-style estimate with Gold 6542Y on DL360, Gold 6548Y+ on DL380, MR408i-o / MR416i-p / SR932i-p, hybrid capacitor P02377, DDR5-5600 on DL360, and NVMe P84239. Face B is the China #AKM localization with 6418H / 6558Q, MR216i-o on DL360, battery P01366, DDR5-4800 on DL360, and NVMe P70436. Same chassis counts do not equalize performance.
Buyers who rank quotes on chassis quantity alone will silently accept a different CPU generation profile, a lower-lane DL360 RAID controller, a different NVMe firmware family, and a different memory MT/s on the 1U block. Use the table as the CapEx gate — pick one face, then force every vendor onto that face.
| Domain | Face A (GPL-style) | Face B (China #AKM) |
|---|---|---|
| Localization | Europe Multilingual B19 | China - English #AKM |
| DL360 CPU | Gold 6542Y P67081-B21 ×4 | Gold 6418H P49621-B21 ×4 |
| DL380 CPU | Gold 6548Y+ P67082-B21 ×18+6 | Gold 6558Q P67098-B21 ×18+6 |
| DL360 DIMM | 64GB DDR5-5600 P64707-F21 ×8 | 64GB DDR5-4800 P43331-F21 ×8 |
| DL380 DIMM | 64GB DDR5-5600 P64707-F21 ×72+48 | Same 5600 kit retained |
| DL360 RAID | MR408i-o P58335-B21 | MR216i-o P47789-B21 |
| DL380 8SFF RAID | MR416i-p P47777-B21 | MR416i-p retained |
| DL380 12LFF RAID | SR932i-p P47184-B21 | SR932i-p retained |
| RAID backup power | Hybrid capacitor P02377-B21 | 96W battery P01366-B21 |
| NVMe ad-hoc ×30 | P84239-B21 | P70436-B21 |
| DL360 OCP enable | P51911-B21 CPU1→OCP2 | P48830-B21 CPU2/OCP2 |
| DL380 heatsink | High Perf P48818-B21 | Max Perf P48817-B21 |
Limitation of this page: it equalizes SKU identity and quantities for RFQ fairness; it does not publish SPECrate, TPC, or application benchmarks for 6542Y vs 6418H or 6548Y+ vs 6558Q. Demand your own workload acceptance criteria beside the SKU gate.
BCM57414 NIC, 845398-B21 Optics, and BD505A iLO Advanced
Quick Answer: Every chassis takes one Broadcom BCM57414 10/25Gb dual-port SFP28 OCP3 adapter (P10115-B21) and two 845398-B21 25Gb SFP28 SR optics, plus BD505A iLO Advanced with three-year licensed-feature support. Optics and iLO are easy to drop from incomplete quotes — treat them as mandatory equal-BOM rows, not optional add-ons.
Network and management lines are identical across Face A and Face B, so they are useful anchors when CPUs and RAID drift. Lot totals: NIC ×14, optics ×28, iLO ×14.
| SKU | Qty | Role |
|---|---|---|
P10115-B21 | 2 + 9 + 3 = 14 | BCM57414 10/25Gb 2p SFP28 OCP3 |
845398-B21 | 4 + 18 + 6 = 28 | 25Gb SFP28 SR 100m transceiver |
BD505A | 2 + 9 + 3 = 14 | iLO Advanced 1-server license + 3yr support |
P38997-B21 | 4 + 18 + 6 = 28 | 1600W Flex Slot Platinum PSU (2×/chassis) |
OCP enablement cables differ by face on the DL360 block (P51911-B21 vs P48830-B21). Keep the enablement kit aligned with the chosen face so the BCM57414 actually lands on the intended OCP path.
China #AKM Localization Is Not a Silent Language Swap
Quick Answer: Face B attaches #AKM China - English localization to every CTO base (P52499, P52534, P52533). That option co-travels with the 6418H/6558Q CPU map, MR216i on DL360, P01366 batteries, and P70436 NVMe. Do not accept #AKM as a cosmetic overlay on a Face A CPU/RAID quote — the drift matrix moves together.
Face A uses Europe Multilingual B19 on the same CTO bases. Procurement teams that copy Face A CPUs into a China-localized PO often discover factory configuration holds when localization, CE-mark removal (P35876-B21), and heatsink class disagree with the chosen CPU TDP path.
- Fit for #AKM Face B: China English localization required; willing to accept 6418H/6558Q and MR216i on DL360.
- Fit for B19 Face A: Europe multilingual path; Gold 6542Y/6548Y+ and MR408i/MR416i/SR932i locked.
- Unfit: Mixing #AKM localization with Face A CPUs, or mixing Face B NVMe PID into a Face A RAID/CPU lot without rewriting acceptance tests.
Lead-Time Risk — Industry Estimate / Pending Confirmation
Quick Answer: Face A rows commonly print estimated availability lead times of 14, 8, 4, 3, or 1 days depending on SKU class. Those figures are channel planning estimates pending confirmation — not HPE ATP, not warehouse inventory, and not a ship promise. Gate CapEx on dated ATP after Face A/B equalization.
SSD and NVMe lines on the sheet often show ~14-day estimates; memory FIO kits and many options show ~4 days; rails and some cables show ~8 days. Treat every printed day count as industry estimate / pending confirmation. Large 15.36TB SAS RI and NVMe lots can stretch far beyond printed estimates when allocation is tight — demand separate ATP for P49045-B21, P84239-B21/P70436-B21, and CPU kits.
- Reject quotes that claim “in stock” without a dated ATP line per long-lead SKU class.
- Require factory-integrated vs ship-loose clarity on every drive and DIMM row.
- Reprice risk: HPE channel quotes can carry short validity windows — freeze Face A/B identity before the clock starts.
Who This LOT3 BOM Fits — and Who It Does Not
Quick Answer: Fit buyers who mix 1U density with 2U SFF flash and 2U LFF HDD under ProLiant Gen11 and enforce one Face A or Face B SKU map. Unfit buyers who want a single chassis family, cannot accept NVMe PID drift, or need published unit USD from this workbook — those figures stay redacted.
Suitable when:
- You are refreshing a mixed virtualization / capacity tier with fourteen Gen11 hosts in one RFQ window.
- You can pick Face A or Face B and force dual-vendor replies onto that face.
- You need BCM57414 + 25Gb SR optics and iLO Advanced on every host for ops parity.
Not suitable when:
- You need AMD EPYC, single-socket, or GPU-dense XE-class platforms — rewrite the brief.
- You will not resolve MR408i vs MR216i or P84239 vs P70436 before PO — CapEx will not be equal.
- You expect this page to publish Unit or Extended USD from the source xlsx — it will not.
How To Build the Equal-BOM RFQ (Step by Step)
Quick Answer: Lock the fourteen chassis, choose Face A or Face B, equalize RAID/backup/NVMe/DIMM rows, attach NIC/optics/iLO/PSU multipliers, then demand dated ATP for long-lead SSD and NVMe classes. Submit the equalized list through the BOM-risk RFQ path — do not paste mixed faces into one CapEx approval.
- Step 1 — Lock chassis quantities: Freeze 2×
P52499-B21, 9×P52534-B21, 3×P52533-B21with dual 1600W PSUs and rails. - Step 2 — Pick one face: Face A (6542Y/6548Y+, MR408i/MR416i/SR932i, P02377, P84239, B19) or Face B (6418H/6558Q, MR216i, P01366, P70436, #AKM).
- Step 3 — Equalize RAID and backup power: Match controller family and capacitor vs battery SKU; reject silent MR408i→MR216i swaps on DL360.
- Step 4 — Freeze drive and NVMe lines: Lock P49045 / P49053 / P40512 / P23608 quantities and the chosen NVMe ad-hoc PID ×30.
- Step 5 — Attach NIC, optics, iLO: Require P10115-B21 ×14, 845398-B21 ×28, BD505A ×14, and the matching OCP enablement kit for the chosen face.
- Step 6 — Gate on ATP: Treat sheet lead days as pending confirmation; demand dated ATP; submit via rfq.html?intent=bom-risk.
Frequently Asked Questions
Quick Answer: This LOT3 brief covers fourteen Gen11 chassis with shared NIC/optics/iLO and two incompatible SKU faces. Lead days are pending confirmation; no Unit or Extended USD is published. China #AKM is part of the Face B drift matrix, not a language-only option on Face A CPUs.
Fourteen chassis total: 2× ProLiant DL360 Gen11 8SFF (P52499-B21), 9× DL380 Gen11 8SFF (P52534-B21), and 3× DL380 Gen11 12LFF (P52533-B21), plus shared BCM57414 NICs, 845398-B21 optics, BD505A iLO Advanced, and drive classes sized per block.
Face A uses Gold 6542Y/6548Y+, MR408i/MR416i/SR932i with hybrid capacitor P02377, DDR5-5600 on DL360, and NVMe P84239. Face B uses 6418H/6558Q, MR216i on DL360, battery P01366, DDR5-4800 on DL360, China #AKM localization, and NVMe P70436. Same chassis counts are not equal BOM.
No. Printed lead days (commonly 14, 8, 4, 3, or 1 on Face A rows) are industry estimates pending confirmation. Require dated ATP on the formal RFQ; do not invent stock from the planning sheet.
No. Every Unit Price, Extended List Price, channel net, and planning totals from the internal channel sheet are redacted. Confirm commercials only on a formal RFQ after Face A vs Face B equalization.
No. Face B pairs #AKM with different CPUs, DL360 memory speed, DL360 RAID, backup power SKU, heatsink class, and NVMe ad-hoc PID. Treat localization as one row in a larger drift matrix, not a silent language swap.
References
Quick Answer: Use HPE public QuickSpecs and product pages to verify DL360/DL380 Gen11 chassis families, controller options, and iLO Advanced licensing language. Do not treat channel workbook USD as an HPE list — those figures are redacted here and must be confirmed on a formal RFQ.
- HPE ProLiant DL360 Gen11 QuickSpecs (PDF) — 1U chassis, OCP, and storage option families
- HPE ProLiant DL380 Gen11 QuickSpecs (PDF) — 2U 8SFF/12LFF, MR/SR controllers, drive cages
- HPE ProLiant DL380 Gen11 product page — platform positioning, DDR5, PCIe Gen5
- HPE ProLiant DL360 Gen11 product page — 1U density peer positioning
Key Takeaway
Key Takeaway: Equalize fourteen Gen11 hosts — 2× DL360, 9× DL380 8SFF, 3× DL380 12LFF — on one Face A or Face B map before comparing channel quotes. NVMe P84239 vs P70436 and MR408i vs MR216i are CapEx gates, not footnotes. BENQUAN GLOBAL LIMITED supplies HPE ProLiant Gen11 DL360/DL380 LOT3 BOM lines with competitive pricing after equal-BOM review.