Quick Take
Quick Take: HPE ProLiant DL360 Gen11 and Dell PowerEdge R660 are the default 1U dual-socket refresh pair when rack U-space matters more than max disks or DW GPUs. Both run 4th/5th Gen Xeon Scalable, DDR5, and PCIe Gen5 — peer them on backplane, PSU, and warranty lines, not brochure core counts. BENQUAN GLOBAL LIMITED supplies both.
Spec Snapshot — 1U Peers on Paper
Quick Answer: Both are mainstream 1U dual-socket Xeon Scalable platforms with DDR5 memory and PCIe Gen5 connectivity, reaching broadly similar memory ceilings. Brochure maxima are ceilings rather than configurations, so your real bill of materials is defined by the drive cage, riser map, power supply and management license SKUs.
| Dimension | HPE ProLiant DL360 Gen11 | Dell PowerEdge R660 |
|---|---|---|
| Role | Dense 1U 2P compute | Dense 1U 2P compute |
| CPU | 1–2× 4th/5th Gen Xeon Scalable (model-dependent core max) | 1–2× 4th/5th Gen Xeon Scalable (model-dependent core max) |
| Memory | DDR5 Smart Memory, up to ~8 TB class; 16 DIMMs per CPU | DDR5 RDIMM, up to ~8 TB class; channel population per QuickSpecs |
| PCIe / OCP | PCIe Gen5 + OCP 3.0 (riser-limited in 1U) | PCIe Gen5 + OCP 3.0 (riser-limited in 1U) |
| Typical drives | Up to 4 LFF; up to 8+2 SFF; EDSFF E3.s paths (cage-dependent) | SFF/LFF/NVMe cage options (config-dependent — confirm SKU) |
| GPU (config) | Limited SW-class or none — not a DW GPU platform | Limited SW-class or none — DW GPUs need 2U |
| Management | iLO 6 (+ Advanced) / OneView options + Care Pack | iDRAC9 + ProSupport tiers |
1U vs 2U fork
If the brief needs 12+ local disks, multiple DW GPUs, or max riser slots, stop comparing DL360 and R660. Open a parallel RFQ for R760 vs DL380 Gen11 — same CPU generation, different expandability envelope.
When DL360 vs R660 Actually Matters
Quick Answer: Use this comparison when refreshing aging DL360 Gen10 or R650-class hosts, densifying a rack for VMware or Hyper-V, or building edge data center nodes where every rack unit counts. This is a 1U brief, so 2U expandability and double-width GPU nodes belong on separate requests.
- Rack U constraint: More nodes per cabinet without moving to blade or HCI — 1U is the trade-off for fewer bays and risers.
- Not a GPU-first brief: Light SW GPU or no GPU fits 1U; DW inference/training belongs on a separate 2U R760 vs DL380 or GPU RFQ line.
- Fleet gravity: Existing iLO/OneView vs iDRAC/OpenManage skill usually outweighs small hardware deltas.
- Three-vendor context: Lenovo ThinkSystem vs PowerEdge covers SR630 vs R660 from a third column — this page is the HPE–Dell 1U peer.
Deep specs: DL360 Gen11 specs. Dell R660 follows the same 1U dense pattern as R650 — confirm exact cage and riser SKUs on every quote.
Drive Backplanes & I/O — Where 1U Differs
Quick Answer: The backplane SKU drives both local capacity and how much PCIe remains for network cards and host bus adapters. Force the same drive intent onto both vendor lines before comparing chassis price, because rear cage options can consume riser slots and that is where 1U tenders break.
| Intent | DL360 Gen11 path | R660 path |
|---|---|---|
| Boot + SAN primary | Minimal local SFF or M.2 boot; FC/iSCSI via OCP/PCIe | Same — match boot media and HBA count |
| Local NVMe cache | NVMe SFF or EDSFF cage (confirm QuickSpecs) | NVMe SFF cage (confirm riser map) |
| Max local disks in 1U | EDSFF E3.s or dense SFF kits — fewer PCIe left | Dense SFF kits — validate NIC/HBA headroom |
| 25/100GE networking | OCP 3.0 or PCIe NIC — count slots after cage choice | OCP 3.0 or PCIe NIC — same constraint |
Rear cage vs riser trade-off
On both platforms, rear drive options can consume riser slots. If the brief needs max disks and dual 100GE plus FC, validate the riser diagram before PO — this is where 1U RFQs break.
iLO vs iDRAC — Ops & Ecosystem Fit
Quick Answer: Management stack and storage gravity usually outweigh a small hardware delta between these two platforms. Lean toward DL360 when the team lives in iLO and OneView with an HPE storage estate, and toward R660 when iDRAC, OpenManage and a Dell storage refresh path already dominate operations.
| Factor | Lean DL360 when… | Lean R660 when… |
|---|---|---|
| Management skill | Team lives in iLO / OneView | Team lives in iDRAC / OpenManage |
| Storage gravity | MSA → Alletra or HPE-led estate | PowerStore / Dell SAN refresh path |
| Support contract | Existing HPE Care Pack estate | Existing Dell ProSupport estate |
| Lead time / stock | DL360 BOM available sooner | R660 BOM available sooner |
Grey-market caution
1U refreshes attract grey quotes. Prefer authorized paths for warranty and firmware support. Related: Dell authorized vs grey · authenticity checklist.
1U BOM Truth — Density, PSU, Warranty
Quick Answer: Split the tender lines by form factor, keeping 1U hosts here while 2U expandability and GPU nodes go on separate briefs. Force matched power supply redundancy, support years and management tiers before ranking vendors, because parts-only cover against full support changes total cost silently.
- 1U density line: DL360 + R660 on identical CPU/RAM/backplane intent — this article.
- 2U expandability line: R760 vs DL380 Gen11 when disks, risers, or DW GPUs dominate.
- GPU / AI line: Quote accelerators separately — do not pretend a 1U cage is a training node.
- Shared storage line: AFA/hybrid arrays on their own RFQ; hosts attach via matched HBA/NIC counts.
- PSU: Redundant PSU wattage must cover CPU TDP + NIC/HBA draw — under-sized PSUs block future NIC upgrades.
- Warranty: Match 3- or 5-year NBD/4-hour response on both quotes; parts-only vs full support changes TCO silently.
Buying Mistakes That Inflate 1U TCO
Quick Answer: The recurring errors are under-specified management licenses, DIMM populations that quietly drop memory speed, and forcing 2U disk counts into a 1U cage until network card headroom disappears at install. Forgotten fiber channel adapters for SAN attach surface in the install week. Dual-vendor tenders catch these before purchase.
- 2U expectations in 1U: Quoting 2U backplane density then picking the cheaper 1U chassis — you lose NIC/HBA headroom at install.
- CPU SKU drift: Different Xeon steppings across vendors breaks apples-to-apples TCO.
- Memory speed theatre: 2DPC configs may drop MT/s — populate channels per QuickSpecs, not habit.
- Invisible management cost: iDRAC Enterprise-class features and iLO Advanced are not free on every SKU path.
- Orphaned HBAs: SAN attach forgotten until week of install — put FC/iSCSI NICs on the first RFQ.
RFQ Checklist — Dual 1U BOM on One Brief
Quick Answer: Send one workload brief asking for DL360 Gen11 and R660 line items with identical performance intent: hypervisor target, node count, CPU generation, DIMM size and population, drive backplane, network and fiber channel adapters, power supply wattage, management tier and support years. Compare three-year cash and lead time.
What to put on the RFQ
- Confirm 1U is correct — or split 2U/GPU lines per sections above
- Target hypervisor (vSphere / Hyper-V / other) and VM/vCPU/RAM envelope
- Node count and HA topology (N+1, stretch, single site)
- CPU generation preference (4th vs 5th Gen) and cores per node
- DIMM size/speed and balanced population requirement
- Drive backplane: SFF/LFF/NVMe count, boot media, SAN vs local primary
- OCP/PCIe NIC speeds (10/25/100GE) and FC HBA if needed
- Redundant PSU wattage and input voltage (IEC C13/C14, PDU plan)
- Management tier (iLO Advanced / iDRAC) + 3 or 5 year support
- Preferred storage adjacency (PowerStore / MSA / Alletra / other)
- Lead time: stock vs ATP; quote validity window
Use SKU Lookup for related HPE/Dell lines, then submit the dual-vendor brief on rfq.html.
Frequently Asked Questions
Quick Answer: DL360 Gen11 and PowerEdge R660 are genuine 1U peers, so neither is universally better and the operations ecosystem plus backplane fit usually decide. Run a dual tender on matched CPU, memory and I/O intent, include management licensing and multi-year support, then pick the cleaner three-year total cost.
Official DL360 Gen11 QuickSpecs are on hpe.com. Freeze CPU, DIMM (for example 32 GB ranks), controller, Flex Slot PSU, and Tech Care years from that sheet before you peer R660. Typical dual-RFQ turnaround is 24 hours, with peer columns back in 2 days. This page is the 1U vs buying guide, not a price list.
Not universally. Both are mainstream 1U 2P Xeon Scalable hosts. Choose by management skill base, storage ecosystem, support contracts, and which BOM clears lead time with full warranty.
When local disk count, DW GPU, or riser-heavy I/O exceeds 1U practical limits. Use our R760 vs DL380 Gen11 guide for that parallel RFQ line.
Yes for operations. Switching management stacks mid-fleet has training and tooling cost. Put the correct management license tier on each quote so hardware-only prices are not compared unfairly.
Technically possible on many hypervisors if CPU features and sizing align, but ops and firmware ownership get harder. Prefer one platform per cluster; dual-source across sites or refresh waves if you want vendor leverage.
Submit one RFQ with the dual-vendor 1U brief above.
Key Takeaway
Key Takeaway: Both ship 4th/5th-Gen Xeon Scalable, DDR5, and PCIe Gen5 in 1U; the estate decides: iLO/OneView shops keep DL360 Gen11; iDRAC/OpenManage shops keep R660. Lock the backplane cage and riser map, redundant PSU wattage, iLO Advanced or iDRAC Enterprise tiers, and matched 3- or 5-year support before comparing chassis price. BENQUAN GLOBAL LIMITED supplies both servers with competitive pricing.