Quick Take
Quick Take: The MSA 2062 is the entry HPE 2U array that arrives with flash and licensing already paid for, since two 1.92 TB SSDs and the Advanced Data Services LTU are fitted at the factory. Its controllers are single-protocol, so the FC-versus-iSCSI decision cannot be deferred past the order.
Key Specifications
Quick Answer: A 2U enclosure holds two active/active controllers offering eight host ports in total, 24 GB of system cache extendable by up to 8 TB of read cache, and 24 SFF bays with two already filled by bundled 1.92 TB SSDs. Nine 2060 shelves take it toward 240 SFF drives.
Figures follow current HPE MSA 2062 QuickSpecs / datasheet language. Confirm optics, Lot9 “B” power SKUs, and drive packs against the quote package. BENQUAN GLOBAL LIMITED supplies MSA 2062 hardware and support. Related: MSA 2060 specs, SKU Lookup (HPE). Request a quote.
| Item | MSA 2062 |
|---|---|
| Form factor | 2U rack (SFF base models common; LFF via expansion) |
| Controllers | 2 per array (active/active; no single-controller SKU) |
| Host ports | 8 total (4 per controller) |
| Host options | 8/16 Gb FC; 10/25GbE iSCSI; 1/10GBase-T iSCSI; 12 Gb SAS |
| Cache | 24 GB data/system memory; up to 8 TB max read cache |
| Included flash | 2× 1.92 TB Read Intensive SFF SSDs |
| Drives in base SFF | Up to 24 SFF (two bays occupied by bundled SSDs) |
| Max drives | Up to 240 SFF / 120 LFF class with expansion (confirm QuickSpecs for media mix) |
| Expansion | Up to 9 MSA 2060 LFF (R0Q39B) or SFF (R0Q40B) enclosures |
| RAID | 0*, 1, 5, 6, 10, MSA-DP+ (*read cache only) |
| Performance (vendor) | Up to ~395,000 IOPS |
2062 vs 2060
Quick Answer: Same Gen6 controller architecture and expansion story. 2062 bundles flash + ADS; 2060 is the configure-to-order chassis when you want a blank slate or different drive mix from day one. 2× 1.92 TB RI (3.84 TB) 8 ports; FC / iSCSI / SAS SKUs.
| Item | MSA 2062 | MSA 2060 |
|---|---|---|
| Positioning | Hybrid flash from day one | Flexible building-block array |
| Factory SSDs | 2× 1.92 TB RI (3.84 TB) | None included |
| Advanced Data Services | LTU included / preinstalled | Order separately if needed |
| Host ports / protocol | 8 ports; FC / iSCSI / SAS SKUs | Same pattern |
| Expansion | 0–9× MSA 2060 enclosures | Same |
Overview
Quick Answer: 2U block array with two active/active controllers (four ports each), 24 GB system cache, MSA-DP+ / RAID options, and factory flash for day-one acceleration — aimed at SMB, ROBO, and departmental virtualization budgets. MSA 2062 is the Gen6 hybrid-flash starter array: two 1.
Base Model SKUs
Quick Answer: Four SFF base SKUs map to the protocol options — R0Q80B for 16 Gb FC, R0Q82B for 10GbE iSCSI, R0Q84B for 12 Gb SAS, and R7J71B for 10GBASE-T. Each ships with dual controllers, two 1.92 TB SSDs, and the ADS license; only the Smart Choice P8417x bundles also put transceivers and HDD packs in the box.
| Description | Example SKU |
|---|---|
| 16 Gb FC SFF | R0Q80B |
| 10GbE iSCSI SFF | R0Q82B |
| 12 Gb SAS SFF | R0Q84B |
| 10GBASE-T iSCSI SFF | R7J71B |
Smart Choice 32 TB-class bundles (example: P84170-B25 FC, P84171-B25 iSCSI, P84172-B25 SAS) add factory HDD packs and matching transceiver kits — useful when you need a shippable BOM fast.
Software Suite
Quick Answer: Because ADS ships active, a 2062 tiers data automatically between flash and disk, thin-provisions volumes, and raises the snapshot ceiling from 64 to 512 without buying anything extra. Replication to another Gen6 array — a 2060 or 1060 running its own ADS — uses Remote Snap; budget care packs if you want HPE backing those features.
- 64 snapshots baseline; expand to 512 with the included ADS license path
- Remote Snap between MSA 2062 and MSA 2060 / 1060 peers (ADS on each array in the pair)
- Hardware + software care packs if you need vendor software support on bundled features
Use Cases
Quick Answer: Best when you want Gen6 MSA features plus day-one flash and ADS without stacking licenses. Fits VMware or Hyper-V datastores, ROBO servers that need snapshots or replicas, and upgrades from 205x-class arrays that keep 2060 shelves. Start VMs on the bundled SSDs and grow capacity with HDD packs later.
Day-one hybrid virtualization
Use bundled SSDs for performance VMs; add Enterprise 10K or Midline HDD packs as capacity grows.
ROBO with snapshot / replica needs
ADS is already on the array — plan Remote Snap or host-based DR (e.g. Zerto) against your RPO.
Upgrade path from older MSA
Stay in the Gen6 family for enclosure reuse (2060 shelves) and familiar management when replacing 205x-class systems.
Buying Checklist
Quick Answer: Protocol choice leads: R0Q80B for 16Gb FC, R0Q82B for 10GbE iSCSI, R7J71B for 10GBASE-T or R0Q84B for SAS, and none include transceivers. Add drive six-packs beyond the two bundled SSDs, decide whether year-one growth justifies 2060 shelves, and buy support that covers the bundled software.
- Host protocol: FC / 10–25GbE iSCSI / 10GBase-T / SAS
- Base SKU (R0Q80B / R0Q82B / R0Q84B / R7J71B) or Smart Choice pack
- Gen6 SFPs / DACs for FC and optical iSCSI
- Additional SSD/HDD six-packs and RAID/MSA-DP+ plan
- MSA 2060 LFF/SFF enclosures if year-1 growth is known
- HPE support level covering hardware + bundled software
Search HPE parts on SKU Lookup. Compare the flexible chassis in MSA 2060 specs & use cases. For FC SAN design see 32Gb FC switch buying guide.
Frequently Asked Questions
Quick Answer: Buyers mainly ask what is already in the box and what is not. Two 1.92 TB read-intensive SSDs and the Advanced Data Services license ship factory-installed; transceivers do not, except in some Smart Choice bundles; and controllers are single-protocol, so the FC-versus-iSCSI decision is locked at order time.
The official MSA 2062 QuickSpecs PDF is on HPE: PSN1012748860USEN.pdf (hpe.com). This page is the RFQ ladder — 2062 versus 2060 flash packs — so you size a midrange SAN before opening that sheet. Confirm Lot9 B-power SKUs and SFP options on the quote.
Two 1.92 TB Read Intensive SFF SSDs — 3.84 TB raw flash embedded — plus empty bays for more media.
Not on standard FC and 10GbE iSCSI base systems. Order matching Gen6 SFP options. Some Smart Choice bundles include a 4-pack of transceivers.
No. MSA 2062 controllers are protocol-specific. Select the correct model in the RFQ.
BENQUAN GLOBAL LIMITED supplies HPE MSA 2062 hardware and support. Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: Order R0Q80B for 16 Gb FC, R0Q82B for 10GbE iSCSI, R0Q84B for SAS or R7J71B for 10GBASE-T, budget Gen6 transceivers separately on the optical models, and attach any expansion shelves for known year-one growth to the same purchase order. BENQUAN GLOBAL LIMITED supplies the HPE MSA 2062 with competitive pricing.