Enterprise Storage / SMB / Remote Office / Hybrid Flash

MSA 2060: Three Protocols, Three Orders?

Flash-ready hybrid block storage for small and remote sites — dual controllers, eight host ports, FC / iSCSI / SAS model choice, and scale to hundreds of drives without enterprise-array complexity.

Quick Take

Quick Take: The MSA 2060 locks its host protocol into the controller pair, so FC, iSCSI and SAS are three separate orders rather than one array you reconfigure later. Everything else about the 2U chassis stays flexible: mixed SSD and HDD tiers, MSA-DP+ pools, and up to nine expansion shelves.

You can mix SSD and HDD later. You cannot flip FC to iSCSI on the same controller pair. Read the MSA 2060 QuickSpecs host row before the PO locks the protocol SKU — soft list vs net figures stay pending confirmation.

Key Specifications

Quick Answer: Two controllers × four host ports = eight ports; RAID 0 (read cache only), 1, 5, 6, 10, and MSA-DP+; two pools up to 1 PB each; expansion 0–9 enclosures via 12Gb SAS. 2U rack (SFF or LFF base) 2 per array (active/active; can run active/passive single pool) 16Gb FC; 10/25GbE iSCSI; 10GBase-T iSCSI; 12Gb SAS.

HPE positions MSA 2060 for affordable application acceleration — up to about 395,000 IOPS and roughly 80% faster than the prior generation in vendor materials — without the operational overhead of midrange enterprise arrays. Prefer day-one flash + ADS bundled? See MSA 2062 specs. Entry budget with four host ports? See MSA 1060 specs. Use SKU Lookup (HPE) or request a quote.

ItemMSA 2060
Form factor2U rack (SFF or LFF base)
Controllers2 per array (active/active; can run active/passive single pool)
Host ports8 total (4 per controller)
Host options16Gb FC; 10/25GbE iSCSI; 10GBase-T iSCSI; 12Gb SAS
Cache24GB data/system memory; up to 8TB max read cache
Drives in base24 SFF or 12 LFF
Max drives240 SFF / 120 LFF with expansion
ExpansionUp to 9 MSA 2060 drive enclosures; LFF/SFF mixing supported
RAID0*, 1, 5, 6, 10, MSA-DP+ (*read cache only)
Raw capacity (vendor)Up to ~7.37 PB all-SFF / ~2.88 PB all-LFF depending on media mix

Overview

Quick Answer: Block access, SFF or LFF chassis, dual hot-swap controllers with next-gen RAID offload ASIC, 24GB system cache per array, and 12Gb SAS expansion for disk shelves. Mix SSD, Enterprise SAS HDD, and Midline SAS HDD as needed. MSA 2060 is a 2U hybrid array with two active/active controllers and eight host ports.

Base Model SKUs

Quick Answer: Base systems include chassis, two controllers, two PSUs, PDU cords, and rack kit. SFPs are not included on FC and 10GbE iSCSI models — order Gen6 optics separately. “B” suffix SKUs use 94% Lot9-efficient PSUs. TAA-compliant bundles (R9G38x–R9G41x class) add factory HDD packs — confirm current HPE QuickSpecs when quoting regulated deals.

DescriptionExample SKU
16Gb FC LFFR0Q73A / R0Q73B
16Gb FC SFFR0Q74A / R0Q74B
10GbE iSCSI LFFR0Q75A / R0Q75B
10GbE iSCSI SFFR0Q76A / R0Q76B
12Gb SAS LFFR0Q77A / R0Q77B
12Gb SAS SFFR0Q78A / R0Q78B
10GBase-T iSCSI LFFR7J72A / R7J72B
10GBase-T iSCSI SFFR7J73A / R7J73B

TAA-compliant bundles (R9G38x–R9G41x class) add factory HDD packs — confirm current HPE QuickSpecs when quoting regulated deals.

Protocol lock-in: MSA 2060 does not offer converged SAN controllers. Changing from FC to iSCSI later means controller/model swap — pick the fabric correctly in the RFQ.

Expansion & Media

Quick Answer: Attach MSA 2060 SFF (24-bay) or LFF (12-bay) enclosures over 12Gb SAS. Mix SSD and HDD tiers; use read cache / MSA-DP+ features per HPE release notes for the firmware you deploy. Grow capacity: add enclosures up to nine Grow performance: add SSDs and size read cache appropriately.

  • Start small: base array only
  • Grow capacity: add enclosures up to nine
  • Grow performance: add SSDs and size read cache appropriately

Use Cases

Quick Answer: Best fit for SMB, ROBO, and departmental VMware/Hyper-V / Linux block storage where you need dual-controller HA without midrange SAN cost. Not a substitute for mission-critical enterprise arrays with advanced replication suites. FC or iSCSI to hypervisor clusters; use SSD for performance VMs and Midline HDD for capacity.

Virtualization datastore

FC or iSCSI to hypervisor clusters; use SSD for performance VMs and Midline HDD for capacity.

File / app servers at remote sites

SAS-attached or iSCSI for simple racks; dual PSU and dual controllers cover basic hardware redundancy.

Tiered hybrid workloads

Mix Enterprise 10K and Midline 7.2K with SSD cache tiers when budgets cannot justify all-flash.

Buying Checklist

Quick Answer: Six decisions build a clean MSA 2060 order: pick the controller protocol (it cannot be changed later), choose an SFF or LFF chassis, size SSD and HDD counts against a RAID or MSA-DP+ layout, add optics or DACs for every host port, include shelves for year-one growth, and attach the right HPE support tier.

  1. Host protocol: FC / 10–25GbE iSCSI / 10GBase-T / SAS
  2. Chassis: SFF vs LFF
  3. Drives: SSD + HDD counts and RAID/MSA-DP+ plan
  4. Optics / DAC for host ports
  5. Expansion enclosures if year-1 growth is known
  6. HPE support level and firmware train

Search HPE parts on SKU Lookup. For FC SAN design context see 32Gb FC switch buying guide.

Frequently Asked Questions

Quick Answer: Three ordering traps decide whether an MSA 2060 arrives usable. Host protocol is fixed in the controller pair, so FC, iSCSI, and SAS are separate models rather than a runtime setting. Transceivers are priced separately, and capacity stops at 240 small-form-factor drives across nine expansion shelves.

MSA 1060 is the entry 2U array with four host ports; MSA 2060 is the denser host and expansion path (up to 240 SFF). Use the dedicated MSA 1060 specs page for the 1060 QuickSpecs row — do not invent 1060 SKUs on a 2060 quote.

The official MSA 2060 sheet is on HPE: PSN1014678367WWEN.pdf (hpe.com). This page is the RFQ table — FC / iSCSI / SAS lock-in, SFP lines, and the 240-SFF ceiling — so you size before opening QuickSpecs. Confirm protocol and optics on the quote.

240 SFF or 120 LFF with up to nine expansion enclosures plus the base array.

No on standard FC and 10GbE iSCSI base systems. Order matching Gen6 SFP options with the array.

No. MSA 2060 controllers are protocol-specific. Select the correct model in the RFQ.

Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: Freeze the protocol before anything else, because changing it later means new controllers. Then add what the base system leaves out: Gen6 optics for FC and 10GbE iSCSI models, and enough bays for year-one growth before you commit to SFF or LFF.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents