Storage / Entry SAN / SMB / ROBO

Is the MSA 1060 the entry box with only four host ports?

Entry Gen6 flash-ready block array — dual controllers, four host ports, FC / 10GBase-T iSCSI / SAS choices, and expansion with up to three MSA 2060 shelves.

Quick Take

Quick Take: HPE MSA 1060 is the entry point of the Gen6 MSA family: a 24-bay 2U chassis carrying two active/active controllers, 24 GB of cache, and four host ports in total. It trades port count and shelf depth for a lower price, which is the whole basis of the 1060 versus 2060 decision.

Key Specifications

Quick Answer: Dual controllers, four host ports, RAID 0*/1/5/6/10/MSA-DP+, two pools, 12Gb SAS expansion to MSA 2060 shelves. 16 Gb FC; 1/10GBase-T iSCSI; 12 Gb SAS 24 GB data/system; up to 8 TB max read cache Up to 3× MSA 2060 SFF/LFF enclosures ~96 SFF or ~36 LFF with expansion 0* (read.

Figures follow HPE MSA 1060 QuickSpecs / datasheet language. Confirm optics, Lot9 PSU suffixes, and drive packs on the quote. BENQUAN GLOBAL LIMITED supplies MSA 1060 hardware and support. Use SKU Lookup or request a quote.

ItemMSA 1060
Form factor2U SFF base (24-bay)
Controllers2 active/active (no single-controller SKU)
Host ports4 total
Host options16 Gb FC; 1/10GBase-T iSCSI; 12 Gb SAS
Cache24 GB data/system; up to 8 TB max read cache
ExpansionUp to 3× MSA 2060 SFF/LFF enclosures
Max drives~96 SFF or ~36 LFF with expansion
RAID0* (read cache), 1, 5, 6, 10, MSA-DP+

Protocol lock-in: Like other Gen6 MSA models, controllers are not converged. Changing FC ↔ iSCSI later means a model swap — lock the fabric in the RFQ.

vs MSA 2060 / 2062

Quick Answer: Same Gen6 software DNA; 1060 cuts host ports and expansion depth for a lower entry point. Building-block / hybrid flash bundle (2062) 24 GB system; up to 8 TB read cache 2062 includes 3.84 TB SSD + ADS. Item — MSA 1060 — MSA 2060 / 2062 Positioning — Entry / budget — Building-block / hybrid flash bundle.

ItemMSA 1060MSA 2060 / 2062
PositioningEntry / budgetBuilding-block / hybrid flash bundle (2062)
Host ports4 (2 per controller)8 (4 per controller)
Expansion enclosures0–30–9
Max drives (order of)~96 SFF / ~36 LFF~240 SFF / ~120 LFF
Cache24 GB system; up to 8 TB read cacheSame class
Factory flash + ADSNot bundled like 20622062 includes 3.84 TB SSD + ADS

Overview

Quick Answer: Positioned below the 2060, the 1060 gives small IT estates dual-controller high availability behind ProLiant hosts without midrange pricing. It runs the same Gen6 software as the rest of the family, including MSA-DP+ wide striping, two storage pools, and up to 8 TB of read cache on flash.

Base Model SKUs

Quick Answer: Three base SKUs split by fabric: R0Q85A for 16Gb FC, R0Q86A for 10GBASE-T iSCSI and R0Q87A for 12Gb SAS, each shipping two controllers, dual power supplies and a rack kit. Transceivers for the FC variant are a separate order, as are the MSA 2060 shelves used for expansion.

DescriptionExample SKU
16 Gb FC SFFR0Q85A
10GBASE-T iSCSI SFFR0Q86A
12 Gb SAS SFFR0Q87A

Expansion uses MSA 2060 LFF/SFF enclosures (e.g. R0Q39B / R0Q40B class). Smart Choice bundles with factory HDD packs may appear on current price lists — confirm at quote time.

Use Cases

Quick Answer: The 1060 fits a first shared SAN behind ProLiant hosts, small VMware or Hyper-V datastores, and branch sites that grow slowly. Its constraint is the four-port total, which usually resolves to two ports per fabric, so estates needing eight ports or day-one flash bundles should start at 2060 or 2062.

First shared block array

Replace DAS with dual-controller HA without midrange cost — size hosts to four ports carefully (often dual-fabric with two ports each fabric).

ROBO with light growth

Start with base 24 SFF; add up to three 2060 shelves if sites grow slowly.

When to skip 1060

Need eight host ports, nine shelves, or day-one hybrid flash + ADS — go 2060 / 2062.

Buying Checklist

Quick Answer: Pick the fabric before anything else, because Gen6 controllers are protocol-specific and switching later means replacing the array. From there the order is base SKU, FC transceivers if needed, drive mix under MSA-DP+, how many of the three permitted 2060 shelves you want on day one, and support.

  1. Host protocol: FC / 10GBase-T iSCSI / SAS
  2. Base SKU R0Q85A / R0Q86A / R0Q87A
  3. SFPs for FC (and any required copper/optics)
  4. SSD/HDD mix and RAID/MSA-DP+ plan
  5. 0–3× MSA 2060 enclosures
  6. HPE support level

Search HPE parts on SKU Lookup. FC SAN design: 32Gb FC switch guide.

Frequently Asked Questions

Quick Answer: Expansion, optics and protocol lock-in are the three things buyers get wrong. The array accepts three 2060 shelves for roughly 96 SFF or 36 LFF drives, standard FC systems arrive without transceivers, and a controller speaks one protocol for life — choose FC, iSCSI or SAS at purchase time.

The official MSA 1060 sheet is on HPE: PSN1012748865AEEN.pdf (hpe.com). This page is the RFQ table — protocol lock-in, three-shelf expansion, and missing FC SFPs — so you size before opening QuickSpecs. Confirm media and host ports on the quote.

Up to three MSA 2060 drive enclosures plus the base array — about 96 SFF or 36 LFF drives depending on mix.

Not on the standard FC base system. Order matching MSA Gen6 SFPs with the array.

No. Select the correct protocol SKU at purchase.

BENQUAN GLOBAL LIMITED supplies HPE MSA 1060 hardware and support. Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: Lock the fabric before anything else: R0Q85A for 16 Gb FC, R0Q86A for 10GBASE-T iSCSI, R0Q87A for 12 Gb SAS, because a Gen6 controller never changes protocol. Budget FC transceivers separately, and if the roadmap needs more than three shelves or eight ports, start at the 2060.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents