Servers / Virtualization / Hybrid Cloud

Can this DL380 chassis grow to 24SFF later, or is the base locked?

2U dual-socket workhorse — 4th/5th Gen Intel Xeon Scalable, DDR5, PCIe Gen5, flexible SFF/LFF/EDSFF storage, and optional GPUs for virtualization, SDS, and analytics.

Quick Take

Quick Take: The chassis decision outlives every other line on this quote: an 8SFF base cannot become a 24SFF or EDSFF box later without new backplanes and cages. Processor count matters almost as much, because the second socket is what releases the PCIe Gen5 risers and half the memory channels.

Key Specifications

Quick Answer: 2U, 1–2 CPUs, DDR5 Smart Memory, Flex Slot PSUs, TPM 2.0 standard, iLO Standard embedded. 1–2× 4th or 5th Gen Intel Xeon Scalable (up to 64 cores / CPU, model-dependent) DDR5 Smart Memory; up to ~8 TB; up to 5600 MT/s (CPU/DIMM dependent); 16 channels per CPU Up to 8× PCIe Gen5 + 2× OCP 3.

Specs summarize HPE ProLiant DL380 Gen11 QuickSpecs / product pages. Always lock the CTO BOM (CPU stepping, DIMM speed, drive cage, controller) against the quote package. Related: DL360 Gen11, MSA 2062, StoreOnce Gen4+, SKU Lookup. Request a quote.

ItemDL380 Gen11
Form factor2U rack
Processors1–2× 4th or 5th Gen Intel Xeon Scalable (up to 64 cores / CPU, model-dependent)
MemoryDDR5 Smart Memory; up to ~8 TB; up to 5600 MT/s (CPU/DIMM dependent); 16 channels per CPU
ExpansionUp to 8× PCIe Gen5 + 2× OCP 3.0 (riser kits)
GPUUp to ~3 DW or ~8 SW GPUs depending on riser/power/cooling kit
ManagementiLO Standard (+ Intelligent Provisioning); iLO Advanced / OneView Advanced optional
SecurityTPM 2.0 on board; optional bezel lock / intrusion kit
PowerHot-plug Flex Slot PSUs (Titanium options common on BTO/CTO)

Overview

Quick Answer: A two-socket 2U rack server aimed at virtualization, hybrid cloud, software-defined storage and analytics, managed through embedded iLO and optionally HPE OneView. It is the volume workhorse rather than a specialist box, which is why most of the cost variance comes from drive cage and riser choices, not the base configuration.

Drive Bay Options

Quick Answer: Chassis choice is effectively permanent. An 8SFF base suits general virtualization, 24SFF plus rear bays reaches about 30 SFF for dense SAS, SATA or NVMe, LFF variants top out near 16 drives for capacity, and EDSFF serves software-defined storage. Backplanes, cages and controllers must match the media exactly.

Chassis patternTypical capacity story
8SFFEntry / general virtualization; upgradable toward denser front SFF with cages; optional UMB / rear SFF
24SFFDense front SAS/SATA/NVMe; + rear SFF for up to ~30 SFF
8LFF / 12LFFCapacity HDD-heavy; rear LFF/SFF options (up to ~16 LFF class)
EDSFFHigh-density NVMe for SDS / performance storage roles

Controllers (MR408i-o class and others), backplanes, and U.3 tri-mode cages must match the media — do not assume “any SSD fits any cage.”

Rear cages vs PCIe: Some rear LFF cages consume primary/secondary riser slots. If you need both max disks and max NICs/GPUs, validate the riser map in QuickSpecs before ordering.

PCIe Gen5 & GPU

Quick Answer: Up to eight Gen5 slots arrive through riser kits wired to specific CPUs, so a second processor is often what unlocks the lanes you planned for. Two OCP 3.0 slots carry primary networking without spending a full-height slot, and GPU counts depend on riser choice, cooling kit and PSU wattage.

  • Server DIMM Lead Time & Reprice BOM RFQ — B2B procurement & BOM risk guide
  • OCP 3.0 for primary networking without burning a full-height slot
  • PCIe Gen5 NICs / HBAs for 25/100GE and 32Gb FC SAN attach
  • GPU kits for VDI, inference, or transcoder nodes — confirm DW vs SW count and PSU wattage

Use Cases

Quick Answer: Default 2P hypervisor host, SQL/app VM farms, SDS nodes, and edge analytics — pair with MSA/StoreOnce for block and backup tiers. Balanced CPU + dense DDR5 + 25GE OCP for VMware / Hyper-V / KVM clusters. 24SFF or EDSFF NVMe with Gen5 NICs; keep compute/memory sized for the SDS stack’s DRAM rules.

Virtualization / private cloud

Balanced CPU + dense DDR5 + 25GE OCP for VMware / Hyper-V / KVM clusters.

Software-defined storage node

24SFF or EDSFF NVMe with Gen5 NICs; keep compute/memory sized for the SDS stack’s DRAM rules.

App + backup stack

DL380 for compute, MSA 2062 for block, StoreOnce for deduped backup.

Buying Checklist

Quick Answer: Lock the processor generation and count first, then populate DIMMs across all sixteen channels per socket so bandwidth is not wasted. Chassis and controller come next, because cages cannot be swapped freely later. Finish with OCP and PCIe networking, any FC HBAs, PSU wattage for GPUs, and the support term.

  1. 1P vs 2P and exact Xeon Scalable SKU (4th vs 5th Gen)
  2. DIMM size/speed and balanced channel population
  3. Chassis: 8SFF / 24SFF / LFF / EDSFF
  4. Smart Array / tri-mode / NVMe path
  5. OCP + PCIe NICs; FC HBAs if SAN-attached
  6. GPU kit (if any) and Flex Slot PSU wattage
  7. iLO Advanced / OneView and HPE Care Pack

Worldwide how-to-buy sequence (keep these four lines on every RFQ):

  1. Step 1 — Copy the QuickSpecs row. CPU, DIMM, MR/SR, Flex Slot PSU, and drive cage from a50004307enw — not a nickname.
  2. Step 2 — CTO versus Smart Choice. Factory CTO and Smart Choice prebuilds have different lead times; pick one envelope.
  3. Step 3 — Tech Care years. Lock 3-year or 5-year Tech Care / Pointnext on every node.
  4. Step 4 — Worldwide shipping. Request worldwide shipping and quoted lead time in days.

Search HPE parts on SKU Lookup.

Frequently Asked Questions

Quick Answer: Three recurring answers: treat Gen10 media as unqualified until QuickSpecs lists it, since carriers, backplanes and firmware trains diverge; a single CPU is legitimate for light roles while the second unlocks PCIe and memory bandwidth for dense VMs; and pick 2U DL380 over 1U DL360 when drives or GPUs matter.

The official QuickSpecs PDF is on HPE: a50004307enw.pdf (hpe.com). This page is the RFQ table — 2U bays, PCIe Gen5, and GPU class — so you size before opening QuickSpecs. Confirm risers and drive cages on the CTO quote.

Some SFF media may transfer, but carriers, backplanes, and firmware trains differ. Prefer Gen11-qualified drives listed in QuickSpecs for production.

1P is valid for lighter roles. 2P unlocks more PCIe/memory bandwidth and NUMA capacity for dense VMs — size to the workload, not habit.

DL360 is the 1U sibling with less expandability. Choose DL380 when you need more drives, GPUs, or PCIe density in 2U.

Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: Order the processor generation, socket count and drive cage together, then fill all sixteen memory channels per socket before increasing capacity per DIMM. Check PSU wattage and the cooling kit against the GPU plan. Lock GPU and storage options before PO.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents