Quick Take
Quick Take: The 1U form factor is the whole trade: three PCIe Gen5 slots and single-wide accelerators only, against roughly 8 TB of DDR5 and up to twenty E3.s bays. Whether that fits comes down to adapter count, so the DL360-versus-DL380 Gen11 decision has to be settled before any CTO quote.
Key Specifications
Quick Answer: 1–2× 4th/5th Gen Xeon Scalable (up to 64 cores/CPU on supported SKUs), DDR5 to ~8 TB, Flex Slot PSUs, TPM, iLO. 1–2× 4th or 5th Gen Intel Xeon Scalable DDR5 Smart Memory; 16 DIMMs/CPU; up to ~8 TB total; up to 5600 MT/s (CPU-dependent) Up to 3× PCIe Gen5 + 2× OCP 3.
Specs summarize HPE ProLiant DL360 Gen11 QuickSpecs / product pages. Lock CPU, DIMM speed, cages, and risers on the CTO quote. Related: DL380 Gen11, MSA 2062, SKU Lookup. Request a quote.
| Item | DL360 Gen11 |
|---|---|
| Form factor | 1U rack |
| Processors | 1–2× 4th or 5th Gen Intel Xeon Scalable |
| Memory | DDR5 Smart Memory; 16 DIMMs/CPU; up to ~8 TB total; up to 5600 MT/s (CPU-dependent) |
| Expansion | Up to 3× PCIe Gen5 + 2× OCP 3.0 |
| GPU | Up to ~3 single-wide GPUs (kit/power limited) |
| Management | iLO 6 / Intelligent Provisioning; iLO Advanced & OneView optional |
| Cooling | Air standard; liquid cooling modules for high TDP options |
vs DL380 Gen11
Quick Answer: Same processor generation and memory class; the decision is rack height and expandability. Up to ~3 slots + 2× OCP 3.0 Up to ~8 slots + 2× OCP 3.0 Up to ~3 SW (e.g. L4 class) Up to ~3 DW or ~8 SW 4 LFF / 8+2 SFF / 20 EDSFF class Higher SFF/LFF counts (to ~30 SFF).
| Item | DL360 Gen11 | DL380 Gen11 |
|---|---|---|
| Form factor | 1U | 2U |
| PCIe Gen5 | Up to ~3 slots + 2× OCP 3.0 | Up to ~8 slots + 2× OCP 3.0 |
| GPU | Up to ~3 SW (e.g. L4 class) | Up to ~3 DW or ~8 SW |
| Drive density | 4 LFF / 8+2 SFF / 20 EDSFF class | Higher SFF/LFF counts (to ~30 SFF) |
| Best when | Compute per RU matters | Disks / GPUs / HBAs matter |
Overview
Quick Answer: HPE's 1U two-socket workhorse, aimed at workloads where rack units cost more than expansion slots: hypervisor farms, VDI, EDA, latency-sensitive databases, and edge analytics. iLO 6 handles out-of-band management, and liquid cooling modules are available for the highest-TDP Xeon parts rather than being standard.
Drive Options
Quick Answer: Chassis choice locks the drive story on day one: four large-form-factor bays for cheap capacity, ten small-form-factor bays for mixed SAS or U.3 flash, or twenty E3.s bays when software-defined storage needs spindle count. Boot lives on M.2, and heavy adapter loads push the design toward DL380 Gen11.
- Up to 4× LFF SAS/SATA HDD/SSD
- Up to 8+2 SFF SAS/SATA or U.3 NVMe (model-dependent)
- Up to 20× EDSFF E3.s NVMe for dense flash
- NVMe M.2 boot (internal or rear-accessible options)
Use Cases
Quick Answer: Scale-out hypervisor nodes, VDI brokers/hosts, EDA/CAD, low-latency DB tiers, and edge analytics where rack space is scarce. 2P + dense DDR5 in 1U for more sockets per rack than 2U twins. SW GPU options (e.g. NVIDIA L4 class) when DW cards are unnecessary.
Compute-dense virtualization
2P + dense DDR5 in 1U for more sockets per rack than 2U twins.
VDI / graphics-light acceleration
SW GPU options (e.g. NVIDIA L4 class) when DW cards are unnecessary.
App tier + external storage
Boot locally; put data on MSA 2062 or enterprise arrays — ideal when internal bay count is secondary.
Buying Checklist
Quick Answer: Settle the 1U-versus-2U question first, because slot count, drive bays, and double-wide accelerator support all follow from it. Then fix socket count and Xeon generation, balance DIMMs across every channel, match the drive cage to its controller, budget power for GPU kits, and price iLO Advanced with the support term.
- DL360 vs DL380 decision (slots/disks/GPUs)
- 1P vs 2P Xeon Scalable SKU (4th vs 5th Gen)
- DIMM population for channel balance
- LFF / SFF / EDSFF chassis and controller
- OCP + PCIe NICs / HBAs
- GPU kit and PSU wattage / liquid cooling if high TDP
- iLO Advanced and HPE Care Pack
Search HPE parts on SKU Lookup.
Frequently Asked Questions
Quick Answer: Density has limits worth checking before ordering: single-wide accelerators fit, double-wide cards belong in the 2U sibling, and the 8 TB memory ceiling assumes 256 GB modules in every slot on both sockets, with speed derating to verify in QuickSpecs. Air cooling covers all but the hottest processors.
The official QuickSpecs PDF is on HPE: a50004306enw.pdf (hpe.com). This page is the RFQ table — sockets, DIMM speed, and 1U slot limits — so you size before opening QuickSpecs. Confirm CPU TDP and drive cage on the CTO quote.
HPE positions DL360 Gen11 primarily for single-wide GPUs (up to about three). For double-wide accelerators, start with DL380 Gen11.
Yes with 256 GB RDIMMs fully populated across both CPUs — confirm CPU memory-per-socket limits and speed derating in QuickSpecs.
Only for higher TDP CPU configurations that exceed air-cooled envelopes. Most mainstream SKUs stay on air with appropriate heatsink/fan kits.
Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: Stay with the DL360 Gen11 when compute per rack unit is the constraint and one single-wide GPU covers the workload. Move to the 2U sibling as soon as dual FC HBAs, double-wide cards, or more than ten drives appear. Freeze DIMM and NIC SKUs before reprice.