Storage / AFA / Procurement / Comparison / Enterprise / Midmarket

Does an NFS share mean AFF, rather than ASA?

SAN-first shortlists keep pairing Alletra MP with ASA. Disaggregated NVMe vs SAN-optimized ONTAP — density honesty and protocol discipline decide. Dual-RFQ one block brief.

Quick Take

Quick Take: HPE Alletra Storage MP B10000 (disaggregated NVMe) and NetApp ASA A-Series (SAN-optimized ONTAP) are peer SAN-first AFAs. Peer them on usable TB, FC/iSCSI/NVMe, and latency — not appliance vs JBOF slogans. If NFS/SMB appears, switch to AFF. Equalize support years. BENQUAN GLOBAL LIMITED supplies both.

When Alletra MP vs ASA Actually Matters

Quick Answer: Run an HPE Alletra MP versus NetApp ASA bake-off for storage area network first all-flash refreshes where both vendors are approved. It fits VMware and Oracle block estates, Fibre Channel and iSCSI consolidations, and ONTAP storage area network skill that does not need NFS or SMB on the same array.

Threads titled “Alletra vs NetApp SAN” rarely fail on brand preference — they fail on quoting AFF multiprotocol against a block-only brief, mixing Alletra 5000/6000 stickers into an MP B10000 bake-off, or comparing disaggregated JBOF rack counts to ASA appliance U without equal usable TB.
MP
Alletra B10000
ASA
SAN ONTAP
SAN
Block First
Dual
Vendor RFQ

Architecture Fork — Disaggregated MP vs ASA Appliance

Quick Answer: HPE Alletra MP separates controllers from NVMe capacity shelves for independent growth, while NetApp ASA packages ONTAP in a storage area network optimized high-availability appliance. Both target block workloads, so the real fork is growth pattern and rack economics rather than a generic argument about which platform is faster.

Dimension HPE Alletra MP B10000 NetApp ASA A-Series
Common SAN peer B10000 family (B10100 / B10200 topology — confirm) ASA A-Series HA pair (confirm controller tier)
Architecture Disaggregated controllers + NVMe JBOF shelves ONTAP HA pair, SAN-optimized SKU set
Growth pattern Scale performance vs capacity more independently Scale-up appliance + shelf patterns familiar to ONTAP shops
Ops / lifecycle GreenLake / HPE Alletra ops adjacency System Manager / BlueXP; SnapMirror-family DR common
Primary intent Block-first NVMe SAN with HPE estate fit Block SAN without multiprotocol overhead of AFF
Rack footprint Controllers + separate JBOF — count both Appliance U density — count controllers + shelves together

Naming traps

Alletra spans legacy 5000/6000-class stickers and Storage MP B10000 — do not peer an older Alletra appliance nickname to ASA without naming the platform. ASA ≠ AFF. ASA is SAN-optimized; AFF is multiprotocol. “NetApp all-flash” without ASA vs AFF on the RFQ is not a BOM.

Density Honesty — JBOF vs Appliance U

Quick Answer: Disaggregated MP quotes often show more rack units than ASA appliance SKUs at the same usable TB — or the reverse when JBOF scales out. Force both vendors to state raw TB, usable TB after RAID/overhead, and rack U on one line.

  • Alletra MP: Controller count, JBOF shelf count, and NVMe drive size must appear separately — hiding JBOF behind “one array” breaks TCO.
  • ASA: Appliance controller tier + shelf count drives density — compare like controller classes, not marketing nicknames.
  • Reduction: Data-reduction ratios are workload-dependent — document confidence level (conservative vs aggressive) on both BOMs.
  • Power/cooling: JBOF-heavy MP configs can change PDU and rack planning vs compact ASA pairs — include facilities on the brief.

Do not rank on sticker density alone

A smaller U count with half the usable TB is not a win. A larger JBOF footprint that hits the latency SLO with room to add shelves may be. Equalize the capacity brief first, then compare footprint.

Multiprotocol Temptation Traps

Quick Answer: Storage area network first tenders often drift into speculative talk of needing NFS someday. That temptation pushes NetApp quotes toward AFF and HPE quotes toward file services that neither side priced equally, so freeze the protocol list before issuing a dual request for quotation covering Alletra MP and ASA.

Scenario Correct column Trap to avoid
Block only (FC/iSCSI/NVMe) Alletra MP vs ASA (this page) Quoting AFF “for flexibility” without NAS workload
NFS/SMB required on same array Alletra MP vs AFF Stretching ASA multiprotocol it was not sized for
Dell estate + SAN ASA vs PowerStore Dropping PowerStore because “we already picked NetApp”
Open RFP, ops simplicity Add Pure FlashArray third column Skipping Pure because HPE and NetApp are incumbents
If the brief says “SAN today, NAS next year,” split the RFQ: size ASA/MP for block now, and quote AFF or a separate NAS plan on its own line — do not bake speculative multiprotocol into unequal SAN BOMs.

Ops & Ecosystem Fit

Quick Answer: Choosing between HPE Alletra MP and NetApp ASA follows the operating model your storage team already runs. ONTAP storage area network skill and SnapMirror workflows favor ASA, while GreenLake commercial models and HPE server adjacency favor Alletra MP. Neither preference overrides an equal usable capacity brief on both quotes.

  • Lean Alletra MP when: HPE compute/Networking estates, GreenLake commercial models, and disaggregated growth are already standardized.
  • Lean ASA when: ONTAP runbooks, BlueXP ops, and SnapMirror-centric DR define day-2 — without needing AFF multiprotocol.
  • Keep Pure when: Evergreen/subscription economics, simplicity, or an existing FlashArray estate reduces migration risk on open RFPs.
  • Keep PowerStore when: Dell/VMware adjacency dominates — see ASA vs PowerStore for that peer line.

Replication is not interchangeable marketing

SnapMirror-family workflows on ASA and HPE replication options on Alletra MP must match the DR brief — async vs sync, retention, and bandwidth. Force both vendors to itemize replication licenses and target capacity.

Sizing Truth — Equal Assumptions

Quick Answer: Force equal usable terabytes, protocol mix, latency service level objective, data reduction confidence, replication scope, and software and support years across the HPE Alletra MP and NetApp ASA bills of materials. Only then compare rack footprint and growth headroom, because unequal assumptions make the cheaper column look artificially attractive.

  • Usable TB: State required usable capacity at Year 0 and Year 5 — not raw drive marketing.
  • Protocols: FC vs iSCSI vs NVMe-oF counts and speeds — block only unless the brief changes.
  • Latency SLO: Document workload profile (OLTP, VDI, backup landing) — do not compare unrelated benchmarks.
  • Support: 3 vs 5 vs 7-year terms and upgrade rights must match.
  • Migration: Host cutover windows, multipath, and zoning/iSCSI network labor belong on both quotes.
If one quote includes replication, encryption, and five-year support and the other is bare chassis with aggressive reduction ratios, stop ranking vendors. Fix the SAN brief first.

RFQ Checklist — Dual SAN BOM on One Brief

Quick Answer: Issue one storage area network brief and ask for HPE Alletra MP and NetApp ASA line items against it, with equal usable terabytes and protocols on both columns. Add an optional Pure Storage or Dell PowerStore third column when the tender is genuinely open to other vendors.

What to put on the RFQ

  • Usable TB Year 0 and Year 5; growth pattern (scale-up vs disaggregated)
  • Protocol mix: FC / iSCSI / NVMe-oF — confirm block-only (no NFS/SMB)
  • Latency SLO and workload profile (no vendor benchmark sheets as substitute)
  • Alletra MP: B10100 vs B10200 topology, controller count, JBOF shelf count, NVMe drive size
  • ASA: controller tier, shelf count, SAN-optimized SKU confirmation (not AFF)
  • Data reduction: conservative vs aggressive assumption — state which you require
  • Replication / DR: async/sync, retention, bandwidth, license line items
  • Software/support years, encryption, and upgrade path
  • Rack U, power, and cooling per configuration
  • Optional third column: Pure FlashArray and/or PowerStore when RFP is open
  • Lead time: stock vs factory; quote validity window

Use SKU Lookup, then submit the dual-vendor brief on rfq.html.

Frequently Asked Questions

Quick Answer: Peer HPE Alletra MP against NetApp ASA using storage area network first SKUs, equalize usable terabytes and protocols, resist drifting toward NetApp AFF multiprotocol you never scoped, and let GreenLake versus ONTAP operations decide after a dual request for quotation rather than before sizing has started.

Not universally. Alletra MP wins for many HPE/GreenLake estates that want disaggregated growth. ASA wins for many ONTAP SAN estates without multiprotocol need. Dual-RFQ matched block briefs.

Yes as common SAN-first peers when usable TB, protocols, latency targets, and support years match. Confirm MP topology and ASA controller tier on every quote.

Quote AFF when NFS/SMB multiprotocol is required on the same array. Quote ASA when the brief is block-only SAN. See the Alletra MP vs AFF guide for unified paths.

On open RFPs when ops simplicity, subscription economics, or an existing FlashArray estate matters. Use FlashArray vs Alletra MP for that third-column peer — do not skip it by default.

Submit one RFQ with the dual-vendor SAN checklist above.

Key Takeaway

Key Takeaway: HPE Alletra MP and NetApp ASA are peer SAN-first AFAs with different growth and density economics. Win on usable-TB honesty, protocol discipline, and equal assumptions — then standardize. BENQUAN GLOBAL LIMITED supplies both with competitive pricing and configuration support for global buyers.

Not sure your SAN AFA BOM is optimal?

If disaggregated Alletra MP vs ASA appliance density, multiprotocol drift, or usable-TB assumptions are unclear, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents