Enterprise Storage / Mission-Critical / Hybrid Cloud

Does the B10000 node ship with a host port?

Disaggregated NVMe block + file — scale controllers and capacity independently, GreenLake cloud ops, and midrange economics for consolidated workloads.

Quick Take

Quick Take: Two line items sink most B10000 quotes: the topology choice and the host adapters. Switchless B10100 stops at a couple of shelves, while switched B10200 scales past five petabytes raw, and neither ships with a single host port, so every controller node needs FC or Ethernet cards ordered explicitly.

Architecture

Quick Answer: Compute and capacity are ordered separately: two to four all-active controller nodes, with a documented path to six, sit in front of 2U JBOF shelves holding 24 NVMe drives each. Cache follows the core count, 256GB on 8-core and 16-core nodes and 512GB on 32-core, and growth is one node or one drive at a time.

Figures follow HPE Alletra Storage MP B10000 QuickSpecs / product pages (capacity envelopes and host options vary by node SKU and software release). Confirm BOM, optics, and GreenLake entitlement on the quote. BENQUAN GLOBAL LIMITED supplies HPE Alletra arrays and support. Related: MSA 2062, StoreOnce Gen4+, PowerStore T, Pure FlashArray, SKU Lookup. Request a quote.

Building block What you choose Notes
Controller node8-core / 16-core / 32-coreCache typically 256 GB (8/16-core) or 512 GB (32-core)
Node count2, 3, 4 (+ path to 6 on newer SW)Minimum dual redundant controllers
TopologyB10100 switchless / B10200 switchedShelf count and max capacity differ
Capacity shelf2U JBOF, 24× NVMe SSD~368 TB class raw per enclosure (media-dependent)
MediaEncrypted NVMe SSD + QLC optionsCommon sizes 1.92–30.72 TB; QLC 15.36 / 30.72 TB
  • B10100 (switchless): fewer expansion shelves (commonly up to two per published entry path); solution capacity often cited around ~1.1 PB class depending on drive mix.
  • B10200 (switched): up to sixteen expansion shelves; published raw capacity on the order of ~5.8–5.9 PB per solution, with effective capacity much higher when data reduction applies.
  • Granular growth: add drives and/or single controller nodes without buying unused paired capacity.

Overview

Quick Answer: The B10000 presents block and file from one disaggregated platform, so an array can gain controllers without new shelves or shelves without new controllers. That matters when a database estate outgrows IOPS years before it outgrows terabytes, and it keeps GreenLake operations and ransomware detection consistent across both protocols.

B10000 targets mixed enterprise workloads — databases, VMs, and consolidated SAN/NAS — without forcing a forklift when either IOPS or TB growth leads. Software subscription typically includes OS features and GreenLake cloud ops; controller refresh programs help avoid traditional chassis swaps. Release 10.6.0 adds agentic support automation, ransomware detection across block/file, and expanded disaggregated scale-out (toward six controller nodes in single-node increments — confirm availability on your quote window).

Naming note: Alletra Storage MP X10000 is the sibling unstructured (file/object) platform — different BOM and use cases. This article covers the B10000 block/file line only.

Key Specifications

Quick Answer: Each 2U shelf carries 24 NVMe SSDs, controller nodes ship with 8, 16 or 32 cores, and a switched system reaches roughly 5.9 PB raw or about 16.6 PBe once reduction is assumed. Critically, no host ports are built in — every node needs 32Gb FC or 10/25GbE adapters ordered separately.

24
NVMe SSDs / shelf
8–32
Cores / controller
~5.9 PB
Raw class (switched)*
~16.6 PBe
Effective class*

*Published HPE maxima with data-reduction assumptions. Confirm current QuickSpecs for your node SKUs.

Attribute Typical published range
Host adaptersRequired — no built-in host ports; order FC / Ethernet HBAs per node
FC32 Gb/s Fibre Channel (up to ~8–12 ports/node by SKU)
Ethernet10/25GbE for iSCSI, NVMe/TCP, and file services
AvailabilityRedundant PSU/cooling; dual+ controllers; data-availability SLAs per HPE program
ManagementHPE GreenLake cloud ops (connected or disconnected modes)

Host Connectivity

Quick Answer: Nothing connects out of the box: each controller node must carry at least one host adapter, and remote-copy cards are a separate line item. Depending on node model the ceiling is roughly eight or twelve host ports, spanning 32Gb FC plus 10/25GbE for iSCSI, NVMe/TCP and NFS or SMB file access.

  • Every controller needs at least one host adapter; replication HBAs are separate options for remote copy.
  • Port budgets depend on node model (8 vs 12 max host ports class) — lock optics and breakout cables early.
  • File services share the same platform as block for consolidation RFQs.

Use Cases

Quick Answer: Mission-critical databases, VMware consolidation, and SAN/NAS refresh where independent performance vs capacity growth matters. 32-core nodes + FC or NVMe/TCP for Oracle / SQL / SAP-class latency SLAs; scale shelves when capacity leads. Unified block+file replaces separate midrange arrays; GreenLake intent-based provisioning for app-centric ops.

Database & ERP primary storage

32-core nodes + FC or NVMe/TCP for Oracle / SQL / SAP-class latency SLAs; scale shelves when capacity leads.

VM / mixed workload consolidation

Unified block+file replaces separate midrange arrays; GreenLake intent-based provisioning for app-centric ops.

Vs PowerStore / Pure / FlashSystem

Compare appliance scale-out (PowerStore T, FlashArray, FlashSystem) vs Alletra’s disaggregated node+JBOF model.

Entry HPE path

Budget SAN still on MSA 2062; backup/archive on StoreOnce — B10000 is the Alletra MP mission-critical step-up.

Buying Checklist

Quick Answer: Decide whether latency or terabytes lead, because that picks the core tier and the media: 32-core nodes with TLC for database SLAs, QLC when capacity-first economics win. Then choose B10100 switchless against B10200 switched by how many shelves year three needs, and price adapters, subscription and support per node.

  1. Workload profile: IOPS/latency vs capacity-first (QLC)
  2. Controller: 8 / 16 / 32-core and starting node count
  3. Topology: B10100 switchless vs B10200 switched shelf budget
  4. Drive mix and usable capacity (ignore PBe ceilings without assessment)
  5. Host protocol mix: FC vs Ethernet; file if consolidating NAS
  6. HBA / optics / replication cards per node
  7. Software subscription, cyber-resilience features, and support level
  8. Controller refresh / tech-refresh SKUs if migrating from prior Alletra MP

Search HPE storage parts on SKU Lookup. For high-end Huawei all-flash, see OceanStor Dorado 8000/18000 V6.

Frequently Asked Questions

Quick Answer: Two clarifications save a bad order. Earlier Alletra 5000, 6000 and 9000 appliances use a different architecture, so name B10000 nodes and JBOF shelves explicitly on the quote instead of assuming a family upgrade. GreenLake runs connected or disconnected, and your security policy should settle that before ordering.

The official QuickSpecs PDF is on HPE: PSN1014727563USEN.pdf (hpe.com). This page is the RFQ table — node cores, JBOF shelves, and host adapters — so you can size before opening QuickSpecs. Confirm GreenLake entitlement on the quote.

No. Earlier Alletra 5000/6000/9000 appliance lines are a different architecture. Alletra Storage MP B10000 is the current disaggregated block/file platform on MP hardware — quote B10000 node and shelf SKUs explicitly.

HPE documents cloud-like operations for connected and disconnected on-prem modes. Confirm which telemetry/management path your security policy allows before ordering.

Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: Size the controller tier against latency targets and the shelf count against year-three capacity: 32-core nodes with TLC media for database SLAs, QLC and switched B10200 when terabytes lead. Budget host adapters, GreenLake subscription and support per node. BENQUAN GLOBAL LIMITED supplies HPE Alletra Storage MP B10000 nodes with competitive pricing.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents