Enterprise Storage / Procurement / Comparison / Midrange SAN

Is the Alletra a hybrid 5010, or an all-NVMe 6010?

Same Alletra brand — different appliance families. Hybrid 5010 (5000) vs all-NVMe 6010 (6000) entry SKUs. Capacity, protocols, and controller BOM — not MP disaggregated scale.

Quick Take

Quick Take: HPE Alletra 5010 is the entry 5000 adaptive hybrid array (HDD + flash cache, iSCSI/FC). Alletra 6010 is the entry 6000 all-NVMe array (NVMe/TCP, iSCSI, FC). Peer them on usable TB, latency need, and protocol BOM — not logo. BENQUAN GLOBAL LIMITED supplies Alletra 5000/6000.

When Alletra 5010 vs 6010 Actually Matters

Quick Answer: Use this fork when you are staying inside HPE midrange appliance SAN — MSA outgrown, Nimble/5000 refresh, or a new block array under multi-PB scale-out. You already narrowed to Alletra rack models but must pick hybrid economics vs all-flash NVMe at the entry SKU.

Midrange Alletra RFQs fail when a hybrid 5010 quote is compared to an all-NVMe 6010 without matching usable TB, expansion shelves, cache bundles, and protocol port kits — or when Alletra MP B10000 is quoted against a block-only MSA replacement brief.
5000
Hybrid 5010
6000
NVMe 6010
Scale-up
Appliance
SKU
Fork RFQ

Architecture Fork — Alletra 5000 vs 6000

Quick Answer: Both are scale-up dual-controller appliances with InfoSight and GreenLake ops — not Alletra Storage MP disaggregated nodes. The fork is media: 5000 adaptive hybrid (HDD capacity + SSD cache) vs 6000 all-NVMe flash. Protocol menus differ; confirm port kits per model on the quote.

Dimension Alletra 5000 (5010 class) Alletra 6000 (6010 class)
Media Adaptive hybrid — HDD + flash cache (confirm drive mix on quote) All-NVMe SSD (1.92–15.36 TB drive sizes per QuickSpecs)
Typical protocols iSCSI, FC (confirm 25GbE/32Gb FC kits) NVMe/TCP, iSCSI, FC (confirm kits — 6010 supports up to three head networking options)
Architecture Scale-up appliance (Nimble adaptive flash lineage) Scale-up all-flash appliance (Nimble all-flash lineage)
Availability positioning 99.9999% class (Triple+ Parity RAID) 99.9999% class (Triple+ Parity RAID)
Ops InfoSight + GreenLake cloud management InfoSight + GreenLake cloud management
Example base array SKU R4U33A class (5010 CTO — confirm on quote) R4U28A class (6010 CTO — confirm on quote)

Naming traps

5010H is a lower-entry 5000 model — not the same BOM as 5010. 6030/6050/6070/6090 are higher 6000 tiers — do not peer a 6090 scale-out quote to a 5010 entry brief. Alletra Storage MP B10000 is a separate disaggregated platform — never substitute MP node SKUs for 5010/6010 appliance lines.

Peer Mapping — 5010 vs 6010 Entry Models

Quick Answer: Map HPE Alletra 5010 against 6010 by workload economics and latency, not by assuming the newer number wins. The 5010 fits mixed primary and secondary terabyte-heavy virtual machines and general consolidation. The 6010 fits all-flash block work where NVMe media and lower latency matter, still midrange scale-up rather than disaggregation.

Intent Lean 5010 (5000) Lean 6010 (6000)
Workload Mixed VMs, file services, ROBO, secondary copies on same array Latency-sensitive OLTP/DB block, all-flash mandate, NVMe/TCP hosts
Capacity priority Higher usable TB per spend (hybrid economics) Flash performance envelope; smaller published usable max at entry tier
Protocol need FC + iSCSI typical; confirm minimum 2-port head networking NVMe/TCP + FC/iSCSI; confirm minimum 2-port head networking
Growth inside family In-family upgrade to 5030/5050 (confirm controller upgrade SKUs) In-family upgrade to 6030+ (confirm controller and shelf limits)
Wrong peer Do not quote 6010 when brief is cold/archive TB only Do not quote 5010 when SLA demands all-NVMe and NVMe/TCP

Controller and shelf BOM

Every quote needs: dual-controller base array, head SSD/HDD or NVMe bundles, cache tier (if separate line item), expansion shelves (2120 class for 5000, 2140 class for 6000 — confirm SKU), networking kits, and support term. Use SKU Lookup (brand: hpe) then validate against distributor ATP.

Capacity & Media Truth — No Marketing IOPS

Quick Answer: Size from published usable TB envelopes and drive layouts — not headline IOPS slides. HPE QuickSpecs cite usable ranges with parity overhead; effective TB assumes data reduction. Force both quotes to the same usable TB, shelf count, and drive size — then compare sticker and lead time.

Metric (published QuickSpecs — confirm on quote) Alletra 5010 (5000) Alletra 6010 (6000)
Usable capacity envelope ~33–169 TB class (base + max expansion shelves) ~12–66 TB class (base + max expansion — 6010 allows one expansion shelf)
Max expansion shelves (model) Up to four ES3-class shelves (family table — confirm 5010 config) One expansion shelf at 6010 tier (6030+ adds more)
Cache per controller Confirm cache bundle SKUs on quote (FIO cache bundles vary) 64 GB installed per controller at 6010 tier (QuickSpecs — confirm SW release)
Performance Workload-dependent — do not rank on unstated IOPS; use proof-of-config or reference workloads All-NVMe media — latency-sensitive apps; still confirm with matched drive count
If one quote lists effective capacity at 5:1 reduction and the other lists raw TB only, stop comparing. Normalize to usable TB at your dedupe/compression assumption — or demand both quotes use the same efficiency model.

When to Pivot RFQ to Alletra Storage MP

Quick Answer: Redirect the request for quotation to HPE Alletra Storage MP when the brief needs disaggregated block and file, independent controller versus flash shelf scaling, or Primera-class multi-petabyte growth rather than a 5000 and 6000 appliance ladder. Alletra MP B10000 is the current MP platform; 5010 and 6010 remain scale-up arrays.

  • MP signals: Block + file on one MP stack, scale controllers without shelf pairs, multi-PB raw on switched B10200 topology, GreenLake MP entitlement separate from 5000/6000 arrays.
  • Stay on 5010/6010 when: Single-rack midrange SAN, known scale-up growth to 5030/6030 inside family, MSA/Nimble refresh without MP skill investment.
  • Read next: Alletra MP B10000 specs · Primera to Alletra MP migration · Alletra MP vs NetApp ASA.

RFQ Checklist — 5010 vs 6010 on One Brief

Quick Answer: Send one workload brief and ask for HPE Alletra 5010 and 6010 line items against it, with matched usable terabytes, expansion shelves, cache, protocols, and three-year support on both columns. Add an explicit note that the quote should pivot to Alletra MP if scale exceeds the 6000 entry envelope.

What to put on the RFQ

  • Usable TB required (12 months growth), workload type (mixed vs all-flash block)
  • Protocol: FC port count/speed, iSCSI 10/25Gb, NVMe/TCP if required
  • 5010: base array (R4U33A class), 5010 vs 5010H, HDD + cache bundles, ES3 shelves
  • 6010: base array (R4U28A class), NVMe head bundle, 2140 expansion shelf if needed
  • Networking kits — minimum port counts per QuickSpecs (2+ ports at 6010/5010 tier)
  • Data services / encryption LTUs if required
  • InfoSight / GreenLake connectivity mode (connected vs disconnected)
  • Support: Tech Care tier, term, and quote validity; lead time stock vs ATP
  • MP pivot clause: if usable TB or protocol needs exceed 6010 envelope, quote Alletra MP B10000 separately

Use SKU Lookup, then submit the matched brief on rfq.html.

Frequently Asked Questions

Quick Answer: The HPE Alletra 5010 is the hybrid 5000-series entry model and the 6010 is the all-NVMe 6000-series entry model. Match usable terabytes and protocols on the quote, and pivot to Alletra Storage MP when disaggregated scale or unified block and file is what the brief actually requires.

No. 6010 wins when all-NVMe and NVMe/TCP matter. 5010 wins when hybrid economics and higher usable TB per rack matter for mixed workloads. Confirm SKUs — do not rank on model number alone.

5010H is the lower entry 5000 model with a smaller published capacity envelope. 5010 is the standard adaptive flash array. Quote the CTO base array and expansion path explicitly.

No. 5000/6000 are scale-up Nimble-line appliances. Alletra Storage MP B10000 is disaggregated MP hardware. Different BOM, different RFQ — see MP specs and migration guides.

Submit one RFQ with the checklist above and confirm SKU suffixes on the distributor quote.

Key Takeaway

Key Takeaway: Alletra 5010 and 6010 are same-brand, different-family entry SKUs — hybrid scale-up vs all-NVMe scale-up. Win on usable TB honesty, protocol BOM parity, and knowing when the brief should jump to Alletra MP instead. BENQUAN GLOBAL LIMITED supplies Alletra 5000/6000 with competitive pricing and configuration support for global buyers.

Not sure your Alletra BOM is optimal?

If 5010 vs 6010 media class, expansion shelf counts, protocol kits, or MP pivot timing are unclear, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents