Quick Take
Quick Take: Hitachi VSP media and cache costs rise from October 1, 2026. The partner note estimates about 15–20% on VSP Block 85, 19–30% on VSP 5x00, 20–22% on VSP Block 2x, and about 25% on E and G series media. Cost and price percentages run wider than those bands. Reprice drive lines before the purchase order.
Adding NVMe drives or cache DIMMs to an existing Hitachi VSP array after the October 2026 price adjustment can cost more per usable terabyte than a new VSP One Block appliance. Check your expansion BOM against a whole-controller swap before approving the PO.
3-Line Fast RFQ Template (Ref: BQ-VSP-MEDIA) — Copy and email to info@benquan.hk or open pre-tagged RFQ form →
Ref: BQ-VSP-MEDIA (article-hitachi-vsp-media-cache-cost-october-2026) 1) Existing VSP Model & Expansion SKUs / Drive Pack Quantity: 2) Usable Capacity Target (TB) & Cache Requirement: 3) Compare Against (Expansion Only vs VSP One Block / Peer Array):
What the October media and cache note actually covers
Quick Answer: This Storage Media and Cache section is a later update than the July 15 price notice. The increase starts October 1, 2026. It names no dollar list prices, and it does not replace the April 2025 VSP list revision or the August 18, 2026 InfoFlash.
Hitachi Vantara partners received a forward whose subject begins “Updates on - Oct cost change on Bl”. The body that is in view is numbered section 5 and titled Storage Media and Cache. It opens with three planning statements, then a component table. The rest of that mail is not in the source used for this page, so controllers, software, or support cliffs that may sit in other sections are out of scope here.
The note says pricing increases vary by configuration. It then gives an estimated solution-level impact based on typical average capacity per model. That estimate is a planning range for a whole configuration, not a promise that every drive, cable, or node moves by the same percent. A separate table lists product groups with item counts and average, minimum, and maximum percentages for both cost and price.
Two boundaries matter before you use the numbers in a budget. First, cost percent and price percent are different columns. A row can show a cost move with a flat price, or a price move that is wider than the cost move. Second, minimum and maximum values inside one product group can include decreases and very large increases. A family average is not a safe multiplier for a single part number.
This update is also not a public price list. Channel net prices remain pending confirmation on a dated quotation. It is not the February 25, 2025 InfoFlash that revised VSP list prices effective April 1, 2025, and it is not the August 18, 2026 InfoFlash that covered VSP One, Nexus, and Brocade items. If your file is one of those older notices, use the matching analysis instead of this media table.
The increase starts October 1, 2026. July 15, 2026 is the send date of the previous price-increase notice, not of this mail. Fit: open Hitachi VSP bills of materials that still include drives, cache or memory, nodes, or media-heavy E and G series lines, and that may book on or after October 1. Unfit: a chassis-only order with no media, a non-Hitachi array, or a request for one published percentage to apply to every SKU.
What solution-level impact does Hitachi estimate by family?
Quick Answer: Using typical average capacity, the note estimates about 15% to 20% for VSP Block 85, about 19% to 30% for VSP 5x00, about 20% to 22% for VSP Block 2x, and about 25% for E and G series media. Those four bands are configuration estimates. They are not the minimum or maximum cells in the component table.
The partner text lists four solution-level ranges. Keep the wording “approximately” and “estimated”. Nothing in the visible section converts these bands into a currency amount or a list-price file date.
| Family named in the note | Estimated solution-level impact | What it is not |
|---|---|---|
| VSP Block 85 | Approximately 15% to 20% | Not the B85 component max (B85 Other cost max is 134%) |
| VSP 5x00 | Approximately 19% to 30% | Not a single 5000 drive row; 5000 drive average price is 16% |
| VSP Block 2x | Approximately 20% to 22% | Not identical to every B20 series row; B20 nodes average 14% |
| E and G series media | Approximately 25% | Not every E-series price cell; E drive price runs from -53% to 223% |
Read the second column as a capacity-weighted planning range. A quote that is mostly controllers can land outside it. On the B85 component rows, controllers show an average price change of about 1% across 12 items, while drives show an average price change of about 18% across 73 items. A 15–20% Block 85 solution estimate is plausible only when media is a large share of the configuration. A controller-only add will not follow that band.
The same split appears on the 5000 rows. Drives (204 items) show an average cost and average price change of about 16%. Nodes (16 items) show an average of about 67%, with a maximum of 298%. Memory (2 items) shows about -1% on both cost and price. If your 5000 expansion is a node pair plus a small drive pack, the 19–30% VSP 5x00 solution band is the wrong shortcut. The note’s own table says the mix decides the outcome. Do not treat “VSP 5x00” in the bullets as a synonym that forces every “5000” table row to 19–30%.
E and G series media is the cleanest match between the headline and the table, and it is still not uniform. E series drives (479 items) show an average cost change of 25% and an average price change of 25%. G series drives (54 items) show an average cost change of 25% and an average price change of 28%. The headline “approximately 25%” describes that center, not the E-series price minimum of -53% or the price maximum of 223%.
How do component cost percentages compare with price percentages?
Quick Answer: Across 19 product groups, average cost and average price often match, but several rows do not. 5000 cables average +4% cost and 0% price. B85 Other averages +33% cost and 0% price. G series drives average 25% cost and 28% price. Minimum and maximum cells, not the average, decide a single part number.
The table below is the component matrix in section 5. Counts are “Total Items”. Percentages are the note’s cost and price columns. A negative figure is a decrease on that measure. Rows with one item (E series controllers, E series memory) are not a trend.
| Model type | Product group | Items | Avg cost % | Min cost % | Max cost % | Avg price % | Min price % | Max price % |
|---|---|---|---|---|---|---|---|---|
| 5000 | Cables | 52 | 4 | -17 | 102 | 0 | -17 | 20 |
| 5000 | Controllers | 163 | 36 | -1 | 146 | 36 | -1 | 146 |
| 5000 | Drives | 204 | 16 | -6 | 44 | 16 | -6 | 44 |
| 5000 | Memory | 2 | -1 | -1 | -1 | -1 | -1 | -1 |
| 5000 | Nodes | 16 | 67 | -4 | 298 | 67 | -4 | 298 |
| 5000 | Other | 49 | 3 | -5 | 98 | 1 | -5 | 8 |
| B20 series | Drives | 84 | 21 | -1 | 30 | 21 | -1 | 30 |
| B20 series | Nodes | 36 | 14 | 11 | 17 | 14 | 11 | 17 |
| B20 series | Other | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
| B85 | Cables | 19 | 1 | -1 | 15 | 2 | -1 | 15 |
| B85 | Controllers | 12 | 1 | 0 | 1 | 1 | 0 | 1 |
| B85 | Drives | 73 | 18 | 1 | 27 | 18 | 1 | 27 |
| B85 | Nodes | 5 | 6 | 0 | 25 | 6 | 0 | 25 |
| B85 | Other | 4 | 33 | -1 | 134 | 0 | -1 | 0 |
| E series | Controllers | 1 | -1 | -1 | -1 | -1 | -1 | -1 |
| E series | Drives | 479 | 25 | -1 | 39 | 25 | -53 | 223 |
| E series | Memory | 1 | -1 | -1 | -1 | -1 | -1 | -1 |
| E series | Other | 51 | 16 | -18 | 108 | 16 | -3 | 107 |
| G series | Drives | 54 | 25 | 5 | 39 | 28 | 8 | 42 |
Use the table in three passes. Pass one is the average price column, which is the closest public proxy for what a buyer might see if the group is typical. Pass two is the gap between average cost and average price. 5000 cables, 5000 Other, B85 cables, B85 Other, and G series drives are the rows where those averages diverge. Pass three is the max price cell. 5000 nodes at 298%, 5000 controllers at 146%, E series drives at 223%, and E series Other at 107% are outliers inside the group. They are not the headline you should paste into a forecast, and they are not safe to ignore if your part number sits in that group.
Several groups are flat or slightly down, which is easy to miss if you only remember “October increase”. 5000 memory is about -1% on two items. E series controllers and E series memory are about -1% on a single item each. B20 series Other is 0% on two items. B85 Other shows a 33% average cost change and a 0% average price change, so a cost conversation and a price conversation are different meetings.
The table labels are 5000, B20 series, B85, E series, and G series. The solution bullets use VSP Block 85, VSP 5x00, VSP Block 2x, and E and G series media. This page does not invent a crosswalk the mail did not print. When you RFQ, name both the family on your quote and the table label you believe it matches, and ask the quotation to confirm the mapping.
Who should reprice a Hitachi VSP media BOM before October?
Quick Answer: Reprice if the open order is drive-heavy on E series, G series, B20, B85, or 5000, or if it includes 5000 nodes or 5000 controllers. Wait if the open lines are only 5000 memory, a single E-series controller, or B20 Other, and you already hold a dated quote that excludes media. A chassis with no drives is outside this section.
Three deployment scenarios show why the family band is not enough.
E-series capacity add for a general-purpose block pool. A midrange expansion that is almost all drives sits on the largest row in the table: 479 E-series drive items, average price change 25%, which matches the “E and G series media approximately 25%” sentence. The same row’s price minimum is -53% and the price maximum is 223%. Two drive SKUs on one capacity add can move in opposite directions. Freeze the part numbers, not the 25% headline.
VSP 5000 node and drive expansion. A high-end array add that includes nodes and drives mixes a 16% average drive price change (204 items, max 44%) with a 67% average node price change (16 items, max 298%). The VSP 5x00 solution band of about 19% to 30% can describe a balanced capacity configuration and still miss a node-heavy change. Put nodes on their own RFQ lines.
Block 85 controller refresh with a small drive pack. B85 controllers (12 items) average about 1% on price, with a maximum of 1%. B85 drives (73 items) average about 18%, with a range of 1% to 27%. If the refresh is controllers plus a few drives, most of the dollar move is the drive pack, and the 15–20% Block 85 solution estimate will overstate a controller-only scope. B85 Other is the trap row: average cost 33% and maximum cost 134%, but average price 0% and maximum price 0%.
Act this month if the purchase order is still editable and the ship or invoice window can fall in October 2026. You can leave a line alone when the table shows a tight, near-zero band and your quote already lists those exact part numbers with a validity date that you accept. You cannot leave the line alone just because the family name sounds like a small increase. 5000 nodes are the clearest counter-example.
How do you RFQ Hitachi drives before the October window?
Quick Answer: Send one part list that splits drives, memory, nodes, controllers, and cables, and ask for a reprice against the October media and cache update. Require the reply to state cost versus price and to flag any line whose group maximum exceeds the family band. Do not accept a single percentage applied to the whole quote.
Step 1 — Name the family and the table label
Write the platform as sold (VSP Block 85, VSP 5x00, VSP Block 2x, E series, or G series) and the table label you are comparing (B85, 5000, B20 series, E series, or G series). Ask the quotation to confirm they are the same configuration.
Step 2 — Split media from the rest of the BOM
List drives, memory or cache, nodes, controllers, cables, and other on separate lines with quantities. A blended total hides whether you are on the 16% drive average or the 67% node average.
Step 3 — Ask which column the quote uses
State that you need the price change, not the cost change, unless your contract explicitly tracks cost. Call out 5000 cables, B85 Other, and G series drives, where the averages differ.
Step 4 — Reject a family-wide multiplier
If a line’s product group has a wide minimum-to-maximum span, require part-level confirmation. E series drives and 5000 nodes are the groups where an average will mis-state a single SKU.
Step 5 — Submit one dated BOM
Resolve part numbers in SKU Lookup under Hitachi where the catalog lists them, then send the list through rfq.html. Ask for a validity date and for a statement of whether the October window applies. Soft channel figures in any reply should be marked pending confirmation, not as a published list.
Frequently Asked Questions
Quick Answer: Reprice by part number before October 1, 2026. The 15–30% bands are solution estimates for a typical configuration, while each product group keeps its own average, minimum, and maximum. Cost percent and price percent are separate columns. July 15 was an earlier notice.
The cost change starts October 1, 2026. July 15, 2026 was the previous price-increase notice, not the send date of this media and cache section. The visible section still does not publish dollar list prices.
No. Those bands are estimated solution-level impact for a typical average capacity, not a single SKU list move. The component table shows average, minimum, and maximum cost and price percentages that can sit far outside the headline band.
The table keeps a cost column and a price column. On 5000 cables the average cost change is about 4% while the average price change is 0%. On G series drives the average cost change is 25% and the average price change is 28%. Quote the column that matches the question you are asking.
Send the current part numbers, quantities, and support term, and ask for a reprice against this October media and cache update. Do not apply the family average to every line. BENQUAN can check the BOM and return a dated quotation.
References
Quick Answer: Family names in this note line up with Hitachi Vantara’s public block-storage portfolio: VSP 5000 class systems, VSP One Block, and the E-series and G-series media those arrays use. The percentages come from the media and cache section. The increase starts October 1, 2026.
- Hitachi Vantara storage portfolio — public block and file platform index.
- Hitachi Vantara storage portfolio (block) — VSP One / block family positioning (checked 2026-10-16).
- Hitachi Vantara — vendor home for current product names and documentation entry points.
Percentages in the tables above are transcribed from the partner forward’s Storage Media and Cache section (effective October 1, 2026). They are not a BENQUAN list price and not a commitment that any one part number will move by the group average. Public product names checked against the Hitachi Vantara storage portfolio page on 2026-10-16; channel net prices remain industry estimate, pending confirmation on a dated quotation.
Key Takeaway
Key Takeaway: Plan October VSP media with the four solution bands, then price the actual drive, node, and controller lines from the component table. A 298% node maximum or a -53% to 223% E-series drive span will not follow the family average. BENQUAN supplies Hitachi VSP arrays with competitive pricing.