Quick Take
Quick Take: The VSP 5600 is the 4-node enterprise block array that carries high-capacity builds on 15.3TB SAS SSDs, with quad controllers, node cache packs, and mainframe-capable host adapters. A typical system lands at 164 drives including spares. Freeze the BOM line by line before the purchase order.
VSP 5600 Platform Overview
Quick Answer: The VSP 5600 ships as a 4-node appliance with SAS backend directors, up to 512GB node cache packs per node, and an advanced controller block that serves open systems and mainframe ports from one array. Adaptive Data Reduction activation is a separate license line. Verify the exact controller block and cache SKUs before quoting expansion capacity.
The VSP 5600 is the enterprise-class member of the Hitachi VSP 5000 family, built around a quad-node controller design. Each system starts from the VSP5600-SOLUTION.S solution code and the VSP5600-A0001.S appliance product, then adds media, host adapters, and infrastructure lines. The advanced controller block, VSP5600-SD-ADV-OPMF, runs open-system and mainframe ports on the same array, and its expansion block extends the port and cache envelope.
Two details decide how far a build can grow. The first is node cache: the high-capacity configuration reviewed here carries eight 512GB cache packs, two per node. The second is the backend: four SAS backend directors attach the media chassis to the controllers, and the media chassis themselves are SAS-based, not PCIe. That keeps the drive cost per terabyte down, which is the entire point of a 15TB build.
High-Capacity BOM Anatomy (164 x 15TB)
Quick Answer: One high-capacity VSP 5600 system stacks three SAS media chassis with 39 four-drive 15.3TB packages, one four-drive mainframe package, and four spare drives, reaching 164 drives. Around it sit host adapters, SFPs, backend directors, SVP, rack furniture, PDUs, and power cords. Every line appears with a part number on the quote, so the count can be audited.
Per-system quantities for the reviewed build. Part numbers are public Hitachi line items and can be matched line by line against any quote.
| Line | Part number | Description | Qty |
|---|---|---|---|
| 1 | VSP5600-SOLUTION.S | Virtual Storage Platform 5600 solution | 1 |
| 2 | VSP5600-A0001.S | VSP 5600 appliance product | 1 |
| 3 | VSP5000-SFF-SAS-MC.P | VSP 5000 SFF SAS media chassis | 3 |
| 4 | 15R3TB-MGM-ADV-MP.P | VSP 5000 4x 15.3TB SSD SFF SAS package | 39 |
| 5 | 15R3TB-MGM-ADV-MPM.P | VSP 5000 mainframe 4x 15TB SSD SFF SAS package | 1 |
| 6 | 15R3TB-MGM-SPM.P | VSP 5000 15.3TB SSD SFF SAS spare drive | 4 |
| 7 | VSP5000-512GBA-E-CP.P | VSP 5000 512GB node cache pack | 8 |
| 8 | VSP5600-SD-ADV-OPMF.P | VSP 5600 SAS advanced open/mainframe controller block | 1 |
| 9 | VSP5600-SD-ADV-OPMF-EXP.P | VSP 5600 controller block expansion | 1 |
| 10 | VSP5000-SAS-BED.P | VSP 5000 SAS backend director | 4 |
| 11 | DKC-F910I-4HF32R.P | Fiber 4-port 32Gbps ready host adapter | 4 |
| 12 | DKC-F910I-4ML16.P | Mainframe fiber 4-port 16G longwave host adapter | 12 |
| 13 | DKC-F910I-4MS16.P | Mainframe fiber 4-port 16G shortwave host adapter | 8 |
| 14 | DKC-F810I-1PS32.P | SFP for 32Gbps shortwave | 16 |
| 15 | VSP5000-SEC-SVPA.P | VSP 5000 secondary SVP option, LTSC 2021 | 1 |
| 16 | 044-245099-04.P | VSP 5600 Adaptive Data Reduction activation | 1 |
| 17 | PCIE-HAF-BASE-HAN-CU.P | Hitachi Accelerated Flash Fabric PCIe copper cabling bundle | 2 |
| 18 | PCIE-HAF-BASE-HAN-5M-CU.P | 5m HAF PCIe optical cabling bundle | 1 |
| 19 | SAS-HAN-SMC-CU.P | SAS node-to-media chassis copper cabling | 3 |
| 20 | SAS-SMC-SMC-CU.P | 1m SAS media-to-media chassis copper cabling | 2 |
| 21 | B1119-061242-000002.P | Universal rack V3 600x1200mm, 2 cable trays | 1 |
| 22 | A002V / A002W-001242-900-1.P | V3 side panels, left and right, Hitachi branded | 2 |
| 23 | A002P-060042-900-1.P | V3 high-end solution door | 1 |
| 24 | 1P32A-10C13-2C19-CE20A.P | PDU 0RU 230V 32A, 10xC13 2xC19, CEE-form | 6 |
| 25 | 043-100210-02-UL-S.P | Power cord IEC C14 to C13, 250VAC 10A | 36 |
Raw, Usable and Reduced Capacity
Quick Answer: One set of 160 media drives at 15.3TB each equals roughly 2.4 petabytes of raw capacity before RAID and data reduction. Usable space depends on the RAID level, the spare policy, the mainframe partition, and Adaptive Data Reduction effectiveness, so state the assumption with the number. Never compare raw terabytes against usable tebibytes.
The drive math on this build is straightforward: 39 packages of four drives plus one mainframe package of four drives equals 160 media drives per system, with four spare drives on top for a 164-drive configuration. At 15.3TB per drive, raw media capacity lands at about 2.4 petabytes per system before RAID, sparing, or reduction.
Usable capacity is a negotiation, not a fixed spec. RAID-6 plus hot spare reduces the raw number by roughly a third before any data reduction is considered, and Adaptive Data Reduction effectiveness varies with workload, so the same build can be quoted at very different usable figures. The correct behavior on an RFQ is to name the assumption: RAID level, spare count, and expected reduction ratio, then compare usable on that basis. The four spare drives in this build sit outside the RAID math and cover drive failures without opening the array.
BOM Verification: Where Quantity Errors Hide
Quick Answer: A line-by-line check of this configuration type caught three real issues: node-to-media cable counts that did not match the validated build, an SVP option and a PDU upgraded to newer models, and a drive package adjusted when a mainframe partition joined the layout. Run the same verification against the quoted part numbers before the purchase order is issued.
A configuration review of this exact build type flagged three discrepancies between the original parts list and the validated configuration:
- Node-to-media cabling count — the SAS copper bundle between nodes and media chassis was over-specified by one set; the validated build needs three, not four. Cabling lines are the most common place for a quote to drift because they scale with chassis count.
- Upgraded models — the secondary SVP moved to the LTSC 2021 option and the PDU moved to the 10xC13 2xC19 CEE-form part. Both changes are legitimate model upgrades, but they must appear on the quote with the new part numbers, or the receiving team will reject delivery against the old lines.
- Drive package adjustment — when a mainframe partition is added, one open-system 4-drive package moves to the mainframe 4-drive package. The drive count stays at 164, but the split between part numbers changes and with it the quote total.
Verification rule: match every quoted line against the configuration list, not against the quantity you remember. A one-line difference in cabling or a stale SVP part number is a receiving delay and a change order, both of which land after the budget is frozen.
Support and Service Terms for VSP 5600
Quick Answer: VSP 5600 service contracts follow the same SVC line format as the rest of the Vantara range: a BLF backline support tier for indirect deals, a term in months, and an included or excluded spares option. Front-line response such as same-business-day or next-business-day on-site service rides on top. Confirm term start date and spares scope before signing.
The service contract for a VSP 5600 is written as SVC line items, one per covered system, with the support term expressed in months. On indirect deals the tier is BLF, Backline Support, which puts the fault escalation path at second- and third-line engineering while front-line response, typically same-business-day or next-business-day on-site, is arranged through the channel. The line states whether spares are included or excluded, and that choice materially changes the price.
For estates running VSP 5200 or 5600 hardware near its lifecycle end, the service decision and the refresh decision belong on one brief. The published end-of-service dates for the older families drive the upgrade clock, and the high-capacity 15TB build is the natural consolidation target. Scope the service term at the same time as the hardware, so the contract start date and the array activation date line up instead of drifting.
Frequently Asked Questions
Quick Answer: Spec questions for the VSP 5600 usually resolve to three numbers: raw capacity, usable capacity after the stated RAID and reduction assumption, and the host port count by protocol. Compare those across vendors with equal mainframe or open-system scope. If the quote lists only raw terabytes, ask for the usable figure before ranking.
160 media drives at 15.3TB each equal roughly 2.4 petabytes raw per system, plus four spare drives. Usable capacity depends on RAID level, spare policy, mainframe partition, and Adaptive Data Reduction. Ask the quote to state the usable assumption.
Four 4-port 32Gbps Fibre Channel adapters for open systems, twelve 4-port 16G longwave and eight 4-port 16G shortwave adapters for mainframe, plus sixteen 32Gbps shortwave SFPs per system. Confirm port counts by protocol against the zone plan.
BLF (Backline Support) is the service tier on Hitachi SVC line items for indirect deals, with a term in months and an included or excluded spares option, for example SVC VSP 5600 BLF 36 Mo Incl spares. Front-line response such as next-business-day service is arranged alongside it.
Yes. Open SKU Lookup, filter by Hitachi Vantara, and resolve VSP 5600 part numbers before submitting the BOM. The index covers 20,311 Hitachi lines (catalog date 2026-07-24). Then send the resolved part list to RFQ.
Send one brief with the system count, media packages, host protocol, mainframe scope, service term, and delivery window on rfq.html. State the usable capacity assumption and the spare ratio so every bidder prices the same build.
Key Takeaway
Key Takeaway: Buy the VSP 5600 as a validated build: freeze the media count, host adapters, spare ratio, and service term on one brief, then verify the quoted part numbers against the configuration list. BENQUAN GLOBAL LIMITED supplies Hitachi VSP 5600 systems and high-capacity builds with competitive pricing.