Quick Take
Quick Take: Hitachi Vantara’s August 18, 2026 InfoFlash is separate from the July VSP 5200/5600 end-of-sale notice. It raises VSP One Block High End list pricing on August 27, moves Cisco Nexus channel pricing on August 14, and ends BR-DCX-0137.P (2.5m Director power cord) on August 30 with replacement BR-DCX-0132.P. Freeze open quotes before each cliff.
Source: Partner Weekly InfoFlash — August 18, 2026. Request official PDF.
What Changed in This InfoFlash
Quick Answer: Treat this as a three-track buyer brief: storage list on VSP One Block High End, networking list on Cisco Nexus sold through Hitachi, and a discrete Brocade accessory EOL. Do not merge it with the July 14 InfoFlash that covered VSP 5200/5600 end of sale and the earlier August 1 VSP 5000 price wave.
| Track | Action | Key date |
|---|---|---|
| VSP One Block High End | List pricing update (new sales + upgrades) | August 27, 2026 |
| Cisco Nexus (Hitachi channel) | Vendor price increase; reprice open quotes | August 14, 2026 |
| Brocade 2.5m Director power cord | End of sale; swap SKU in CPQ | EOL August 30, 2026 |
This InfoFlash is a three-date procurement event, not a feature newsletter. VSP One Block High End list moves on August 27, 2026; Nexus channel price moves on August 14, 2026; BR-DCX-0137.P ends on August 30, 2026 with replacement BR-DCX-0132.P. A BOM-risk RFQ that lists open quotes against those cliffs returns in 1 day. Reprice windows close within 24 hours of the vendor effective date for enterprise customers who still hold unapproved deals. How to act: freeze SKUs, then submit rfq.html?intent=bom-risk before each cliff.
Official partner context lives on the Hitachi Vantara partner portal and PQM. For Nexus platform positioning outside the channel notice, see Cisco’s Nexus 9000 series overview.
VSP One Block High End — Price Effective August 27, 2026
Quick Answer: New VSP One Block High End list pricing applies from August 27, 2026 to new solution sales and upgrades on previously sold systems. Quotes created before that date, or Approved and still inside expiration on or before August 26, keep prior pricing. Everything else needs a new Deal Registration, Opportunity, config copy, and Products-tab Refresh in PQM.
- Scope: VSP One Block High End only in this notice (not the July VSP 5200/5600 EOS package).
- Grace: created before Aug 27, or Approved and unexpired on/before Aug 26.
- After cliff: new Deal Registration → new Opportunity → Add From Quote → Refresh lines.
- PQM users: no extra adjustment beyond refreshed configs for new list to apply.
If your midrange path is still on VSP 5200/5600 last-buy calendars, keep that on the July EOS + Aug 1 pricing guide — this August 18 InfoFlash does not replace that timeline.
Cisco Nexus via Hitachi Channel — August 14, 2026
Quick Answer: Hitachi cites industry-wide material and supply pressure for Nexus list uplift effective August 14, 2026. Active quotes generated or existing before that date are impacted, and quotes on Opportunities created before August 14 must be repriced afterward. Pull current nets from PQM; do not assume July or early-August printouts still hold.
- Effective: August 14, 2026.
- Impact: active quotes already in flight before Aug 14 still need review against new list.
- Ops: Opportunities opened before Aug 14 require repricing for any new or regenerated quotes after the date.
- Contact path in the notice: pricing.operations@hitachivantara.com or partner manager / authorized distributor.
Brocade 2.5m Director Power Cord — EOL August 30, 2026
Quick Answer: Hitachi withdraws the 2.5m Director power cord kit from sales. End of Life is August 30, 2026; End of Customer Support is June 30, 2029. EOS SKU BR-DCX-0137.P leaves the Brocade Configurator; replacement BR-DCX-0132.P is already in CPQ — swap it on every open director BOM before the EOL date.
| Milestone | Date |
|---|---|
| End of Life (sales) | August 30, 2026 |
| End of Customer Support | June 30, 2029 |
| EOS SKU | Description | Replacement |
|---|---|---|
| BR-DCX-0137.P | KIT, 2 PWRCRD, 110V, 20A, NEMA, 2.5M | BR-DCX-0132.P |
RFQ Checklist Before CapEx Freeze
Quick Answer: Tag every open Hitachi opportunity as VSP One, Nexus, or Brocade accessory; apply Aug 14 / Aug 27 / Aug 30 cliffs; re-register unapproved VSP One deals; reprice Nexus lines in PQM; swap BR-DCX-0137.P to BR-DCX-0132.P; then send one equal RFQ with dated ATP asks.
- Inventory — VSP One Block High End quotes, Nexus SKUs, director power-cord lines.
- Date lock — Nexus Aug 14; VSP One Aug 27; power cord EOL Aug 30.
- PQM hygiene — new Deal Registration where required; Refresh copied configs.
- SKU swap — BR-DCX-0137.P → BR-DCX-0132.P on BOMs and CPQ.
- RFQ — rfq.html?intent=bom-risk with cliffs called out in details.
Frequently Asked Questions (FAQ)
Quick Answer: August 18 InfoFlash covers VSP One list on Aug 27, Nexus channel price on Aug 14, and Brocade power-cord EOL on Aug 30 with BR-DCX-0132.P replacement — distinct from the July VSP 5200/5600 EOS package. Request the gated PDF and dual-path any open quotes before each cliff.
Three actions: VSP One Block High End pricing updates effective August 27, 2026; Cisco Nexus pricing through the Hitachi channel effective August 14, 2026; and end of sale for the Brocade 2.5m Director power cord kit with replacement SKU guidance.
August 27, 2026 for new solution sales and upgrades. Quotes created before that date, or already Approved and not past expiration on or before August 26, 2026, keep prior pricing. Unapproved opportunities need a new Deal Registration and refreshed quote lines in PQM.
Hitachi states vendor Nexus prices rise August 14, 2026 due to material and supply conditions. Active quotes generated or existing before August 14 are impacted, and opportunities created before that date must be repriced afterward. Confirm net in PQM with your partner manager.
BR-DCX-0137.P (KIT, 2 PWRCRD, 110V, 20A, NEMA, 2.5M) reaches End of Life August 30, 2026 with End of Customer Support June 30, 2029. Replacement SKU is BR-DCX-0132.P, already available in CPQ; the EOS SKU drops from the Brocade Configurator.
Request the gated InfoFlash PDF from the vendor announcements card or this article download gate. The file is emailed to you and CC'd to info@benquan.hk. Pair it with an RFQ for open Hitachi storage or Nexus quotes.
Key Takeaway
Key Takeaway: Run three calendars off the August 18 InfoFlash — Nexus Aug 14, VSP One Aug 27, Brocade cord Aug 30 — and keep the July VSP 5200/5600 EOS brief on a separate track. BENQUAN GLOBAL LIMITED supplies Hitachi VSP One paths and related Nexus/SAN BOMs with competitive pricing.