Quick Take
Quick Take: Do not freeze a 2026 GPU-server RFQ on the consignee country alone. BIS on 31 May 2026 restated that a license is required for advanced computing items when the entity or its ultimate parent is headquartered in Country Group D:5 or Macau — even if that entity sits elsewhere. Name both legal names on the sheet. Do not invent an ECCN for B300. This page is not legal advice. BENQUAN replies in 1 business day. Channel net pending confirmation.
What did BIS freeze on 31 May 2026?
Quick Answer: Parent headquarters still counts. Treat a third-country subsidiary like a hotel booking that lists a city but hides which chain owns the hotel — you still need the chain HQ on the RFQ.
Typical scene: finance approved a GPU-server PO to a subsidiary registered outside Country Group D:5 and Macau. The ultimate parent headquarters was never written. Booking is about to go out. That pack comes back. Put end-user legal name and ultimate-parent legal name plus HQ country on separate rows. That is a typical procurement trap, not a named customer.
Official BIS language (fetched 2026-10-15): a license is required to export advanced computing items to entities headquartered in Country Group D:5 or Macau, or with an ultimate parent company headquartered there, even if the entities themselves are located outside those destinations. The requirement was first introduced on 17 November 2023. BIS now cites EAR section 742.6(a)(6)(iii)(A). This page does not reprint EAR text beyond those printed sentences.
- Fit: Open GPU-server RFQs that named only a consignee country; packs that assumed a third-country subsidiary skips the license; renewals that never wrote parent HQ.
- Unfit: A how-to for obtaining or defeating a license; a Keelung indictment recap; an HS-code table by destination; an air-cargo booking page; NVIDIA NCP/ODM KYC (other H1s).
Which ECCN families did BIS print?
Quick Answer: Freeze the families as printed. Do not stamp a B300 or H200 line with a code this page did not receive from the vendor. Confirm per SKU. Pending confirmation.
| Printed family | Official freeze (fetched 2026-10-15) | RFQ action |
|---|---|---|
| 3A090.a and .b | Advanced computing ICs named in the 31 May guidance | Ask the vendor which subparagraph applies. Empty is honest. |
| 4A090.a and .b | Computers / servers in the same sentence | A GPU server may sit here — pending vendor confirmation. Do not invent the code. |
| Related .z items | FAQ 17 June 2026: items containing such .a ICs, example 5A002.z.1.a | Copy the vendor ECCN. Do not copy the FAQ example onto a server SKU. |
| License exception 740.2(a)(9)(ii) | Named in the BIS closing sentence | Counsel reviews. Do not self-certify on this page. |
| Installed data-center stock | Operators may continue use, storage, disposal, or servicing until further BIS notice | That sentence is not a new-PO license waiver. |
May 2025 non-enforcement of new AI Diffusion Rule compliance requirements does not waive this preexisting parent-HQ line. Recheck any quote older than 15 days. Channel blogs that disagree on counts stay off this freeze.
What this page is not
Quick Answer: Not legal advice. Not the Keelung B300 case study. Not an HS / importer-qualification table. Not an air-cargo booking guide. Not a guide to circumventing export controls.
Worldwide shipping and ex-stock free-port language on this site is not a promise that a license exists. A free-port pallet without parent HQ on the RFQ is still an incomplete pack. Existing installed servers in a bona fide data center are a different sentence on the BIS PDF — do not paste that onto a new export.
Typical use cases: who must act this week?
Quick Answer: Act if this week's PO names a subsidiary and never names the ultimate parent HQ, or if someone treated the AI Diffusion pause as a waiver. Do not wait for a fake "no-license ECCN" on the GPU line.
Integrators: a chassis with covered ICs is still an advanced computing item under the FAQ sentence — ask the vendor, do not guess 4A090. Procurement: lead time on the hardware is its own field. License calendar is a second field. Mixing them hides the gate.
- Subsidiary-only pack: write parent HQ country. Empty is honest. A blank cell that implies "no license" is not.
- B300 code invented: strike it. Confirm with the vendor. Pending confirmation.
- Exception self-certified: move 740.2(a)(9)(ii) to counsel. Not this H1.
- Case-study mix-up: Keelung facts stay on the sibling page.
Buyer decision matrix
Quick Answer: If parent HQ is D:5 or Macau, freeze a license line even when the consignee sits elsewhere. If parent HQ is not in those groups, still name it. If you do not know, stop ranking quotes.
| Situation | List posture | RFQ ask |
|---|---|---|
| End user + parent HQ both written | Screen against 31 May 2026 sentence | Vendor ECCN family; license or exception via counsel |
| Only consignee country written | Incomplete | Add ultimate parent legal name + HQ country |
| Draft stamped B300 = 4A090 without vendor letter | Invented code | Delete the cell; pending confirmation |
| Installed fleet already in a data center | BIS: ongoing use/service until further notice | Do not treat as a new export waiver |
How do you freeze parent HQ on one GPU-server RFQ?
Quick Answer: Copy end-user legal name, ultimate-parent legal name, HQ country, SKU list, and whether any draft already skipped the license. Review target is 1 business day.
- Step 1 — Name both entities — End user and ultimate parent. Tenable-style product pages are other H1s; this freeze is BIS.
- Step 2 — Lock HQ country — Parent headquarters, not the hotel city of the subsidiary.
- Step 3 — Ask ECCN family — 3A090 / 4A090 / related .z as printed. Vendor confirms. Empty is honest.
- Step 4 — Keep the pause off this line — AI Diffusion non-enforcement is not a waiver of the 17 November 2023 rule restated 31 May 2026.
- Step 5 — Split license vs hardware lead time — Two fields. Dual-box still means two hardware bases if appliances are quoted.
- Step 6 — Counsel on exceptions — Do not self-certify 740.2(a)(9)(ii) on a public RFQ.
RFQ checklist
Quick Answer: Send legal names, parent HQ country, SKU list, and whether any draft already priced a third-country subsidiary as "no license." No public net. Not legal advice.
What to put on the RFQ
- End-user legal name and address
- Ultimate-parent legal name and headquarters country
- SKU list (GPU server / IC) — vendor ECCN pending confirmation
- Whether the pack already assumed a subsidiary skips the license
- License vs hardware lead time as separate fields
- Strike-through any invented B300 ECCN cell
Submit on rfq.html. BENQUAN reviews equal GPU-server briefs in 1 business day. Recheck any quote older than 15 days. Worldwide shipping is not a license claim. Channel net pending confirmation.
Common RFQ pitfalls after the 31 May 2026 guidance
Quick Answer: Buyers lose calendar when they treat a subsidiary address as parent HQ, invent an ECCN, or read the AI Diffusion pause as a waiver. Keep two columns: hardware ATP vs license.
- Consignee country only: parent HQ still counts.
- Invented B300 ECCN: not printed as a SKU code on the BIS PDF.
- FAQ example as server SKU: 5A002.z.1.a is an example, not your chassis.
- AI Diffusion pause as waiver: BIS said no.
- Free-port as license: logistics is not EAR classification.
- Keelung mix-in: other H1.
- Self-certified exception: counsel, not this page.
- This page as legal advice: it is not.
Frequently Asked Questions
Quick Answer: A third-country subsidiary does not skip the parent-HQ test. This is not the Keelung case. AI Diffusion pause does not waive the line. No invented B300 ECCN. Not legal advice. No public list or net.
No, not when the entity or its ultimate parent is headquartered in Country Group D:5 or Macau. BIS stated that on 31 May 2026. The consignee country alone is not the freeze. This page is not legal advice. Channel net pending confirmation.
No. BIS said the May 2025 non-enforcement of new AI Diffusion compliance requirements does not waive this preexisting parent-headquarters license line, first printed 17 November 2023 and now cited under EAR section 742.6(a)(6)(iii)(A).
No. That page reconstructs one August 2026 indictment wrap-up. This page freezes the 31 May 2026 parent-HQ field on a GPU-server RFQ. Do not merge them.
This page does not invent one. BIS printed families: 3A090.a and .b, 4A090.a and .b, and related .z items. The 17 June 2026 FAQ adds that the guidance covers 3A090.a ICs and other items containing those ICs, including 4A090.a and related .z (example 5A002.z.1.a). Confirm the SKU with the vendor. Pending confirmation.
No. It is an RFQ screening checklist. Quote list, net, and discount stay off public pages. A license exception in EAR section 740.2(a)(9)(ii) is named in the BIS sentence — do not self-certify it here. Counsel reviews the exception. Channel net pending confirmation.
References
- BIS — Guidance on license requirements for advanced computing items, entities headquartered in Country Group D:5 and Macau (31 May 2026; fetched 2026-10-15)
- BIS — FAQ on the 31 May 2026 guidance (updated 17 June 2026; fetched 2026-10-15)
- BIS — Guidance and frequently asked questions index
Key Takeaway
Key Takeaway: Freeze the 31 May 2026 parent-headquarters test on every 2026 GPU-server RFQ. Name the ultimate parent HQ. Do not invent an ECCN. Do not treat the AI Diffusion pause as a waiver. BENQUAN maps GPU-server RFQs with competitive pricing. Channel net pending confirmation. This page is not legal advice.