Quick Take
Quick Take: On 2026-08-22 the 8-GPU market baseline reprinted unchanged for the second straight day versus 2026-08-20, freezing B300 spot above CNY 14 million into week two. This is third-party market observation, not a BENQUAN price list. BENQUAN GLOBAL LIMITED provides cross-border BOM risk assessment and worldwide logistics for verified builds.
Scope: 8-GPU chassis sale lanes (futures / near-spot / spot, CNY) and lease dual-track (Asia chassis monthly, North America GPU-hour). Grades: A = channel-verified lock; B = public market monitoring; blank = unverified, intentionally not estimated.
Market Snapshot — 8-GPU Price Baseline (2026-08-22, Reprinted)
Quick Answer: The table captures eight 8-GPU chassis across three sale lanes and two lease units at 2026-08-22, identical to 2026-08-20. RTX 4090 holds around CNY 360k–380k while B300 spot stays above 14 million, with Asia monthly rents fully verified and select North America GPU-hour points available for cross-check.
As-of 2026-08-22 — second consecutive no-change day. The source applied its standing rule: if no lane moved, reprint the baseline and annotate the freeze. TCO cross-compare is on-demand and not reprinted today; prior 2026-08-20 assumptions still anchor it.
| Product (8-GPU chassis, CNY unless noted) | Futures | Near-spot | Spot | Asia chassis / month (CNY) | North America GPU-hour (USD) |
|---|---|---|---|---|---|
| RTX 4090 | ~360k | ~370k | ~380k | ~6,000 (Grade A) | Unverified |
| RTX 5090 | ~450k | ~480k | 500k+ (steepest consumer slope) | 10k–12k (Grade A) | Unverified |
| A100 80G | ~1.00M | ~1.10M | ~1.20M | ~30k (Grade A) | Unverified |
| H100 | ~2.60M | ~2.80M | ~3.00M | 60k–90k (Grade A) | ~1.40 (Grade B) |
| H20 | ~2.00M | ~2.20M | ~2.40M | ~50k (Grade A) | — Compliance-gated SKU |
| H200 | ~4.90M | ~5.10M | ~5.20M | ~120k (Grade A) | Unverified (term-dependent, see notes) |
| B200 | ~7.00M | ~7.50M | ~8.00M | ~150k (Grade A) | ~3.50 (Grade B) |
| B300 4T | 900k–1.00M | 1.10–1.20M | >14.00M (Shenzhen monitor 14.50–15.50M, Grade B) | 250k–300k (Grade A) | 2.63–14.04 (Grade B range) |
Table notes — read with the table, not after it. B300 spot has held above 14M through a second week of stalemate; source maintains a forecast pullback toward 12.00–13.50M but the pullback has not started. H200 was 2.00–2.20M before B300 launched (Q3 2025) and its 2 TB DDR5 alone is ~600k today; H100 rose from below 2.00M to 2.60/2.80/3.00M. RTX 4090 is the only SKU without a meaningful futures curve — 1k gaps reflect condition and conversion variance. North America B300 GPU-hour bands are spot auction lows (2.63–3.29), large-cluster wrapped contracts (~4.60), and hyperscaler on-demand (~14.04), a 5x intra-market range describing delivery assurance, not total capacity. Channel H200 term samples observed separately: 5-yr closed ~102k, 3-yr ~97k, short-term channel ~130k (Grade B, term-specific).
External context: NVIDIA H100 Tensor Core GPU · NVIDIA H200 · NVIDIA Blackwell (B200/B300 class). Product pages confirm architecture and positioning only; market prices above are third-party observations.
Sell-Side Signals — Three Lanes to Watch
Quick Answer: Three sell-side signals define the freeze. B300 futures-to-spot stretches about CNY 5 million, the widest recently, so narrowing direction confirms squeeze or pullback. A100 is up roughly 70% in two months with each step A100→H100→H200→B200 taxed near CNY 2 million, showing broad repricing. DDR5 anchors floors.
Signal 1 — B300 spread near CNY 5 million
Futures at 9.00–10.00M against spot above 14.00M leaves roughly 5M of spread — the widest in the recent window. Width encodes consensus that spot will eventually pull back but sharp disagreement on when. The day that spread narrows is the day direction is confirmed: narrowing upward implies a squeeze tightening further, narrowing downward marks the pullback starting. With a second flat print and no futures or near-spot lift, the market is frozen awaiting that confirmation.
Signal 2 — A100 +70% and the ~2M upgrade tax
A100 80G now prints 1.00M / 1.10M / 1.20M (Grade A), up about 70% over roughly two months on public monitoring. The ladder clarifies that this is not a single-SKU move: A100→H100 gaps ~1.80M, H100→H200 ~2.20M, H200→B200 ~2.30M. Each generational step carries roughly CNY 2 million of upgrade tax, so repricing has lifted the whole structure together rather than spiking one node.
Signal 3 — DDR5 as the floor anchor
One 128 GB DDR5-6400 DIMM is observed around CNY 35k. A B300 4T chassis carries 32 DIMMs, implying ~1.12M of memory cost alone before GPUs, boards, cooling, or integration. Until that DIMM price softens, chassis floors have no footing to fall. For daily tracking, watch the DIMM first: it moves faster and transmits to chassis pricing sooner than any other bill-of-materials line.
How to Read the Table — Four Steps Before You Quote
Quick Answer: Read rows by SKU, then sale lanes left to right, then the lease track in its native unit, then the grade. Futures versus spot sets term structure, lease compares exclusive chassis against interruptible GPU-hours, and grades tell you which cells are locked, monitored, or unverified and should not be interpolated.
Isolate exactly one of the eight rows. Do not blend RTX 4090 consumer economics with B300 4T enterprise economics; condition, conversion, memory, and cooling make each row a separate market.
Futures → near-spot → spot shows how time and certainty are priced. Flat across all three means tight supply with no forward relief; a slope means forward supply or risk is being discounted.
Keep Asia in CNY per chassis-month and North America in USD per GPU-hour. Treat any converted figure as directional only — assurance, power, and interruption terms are different products despite sharing a GPU name.
Grade A = lock it; Grade B = track it; unverified = do not price it. An unverified cell is not zero and not an average of neighbors — request it explicitly on your RFQ with quantity, term, and delivery window.
How to Use This Baseline — Buyer, Holder, Observer
Quick Answer: Use the baseline for different decisions. Buyers screen any channel quote against sale lanes and term samples before negotiating futures versus spot. Holders price inventory off futures direction and monthly rent momentum. Observers treat B300 spread width and dual-track premium as the thermometer for market regime.
If you are buying
Treat the table as a reasonableness ruler. Any quote materially outside its lane should trigger scrutiny on condition, conversion, support years, memory configuration, and delivery certainty. For lease, anchor on term: a 3-year closed contract and a short-term channel quote for the same H200 are not the same good, as the 97k–130k observed range shows.
If you are holding inventory
Price off the direction of futures and monthly rent, not today’s spot print alone. Futures and rent are the market’s real-time vote on expectations; spot is where stalemate is most visible during week two above 14M. DDR5 movement is your early warning — chassis rarely break down without it.
If you are observing
Track the two thermometers: B300 futures-to-spot spread width and the tiered dual-track premium (H100 +27%, H200 +11%, B200 +2%). Spread and premium dynamics say more about regime — squeeze, equilibrium, or pullback — than any single cell. Remember the publication rule: no change means a reprinted table, and the reprint itself is the market signal.
Daily update rule captured here for planning: sale and lease baseline at 07:00; unchanged days are reprinted without filler; move-driven commentary and TCO are on-demand only.
Frequently Asked Questions
Quick Answer: These five answers clarify that the baseline is observation not offer, why a second flat day matters, how to compare Asia monthly versus North America GPU-hour without misreading arbitrage, what grades mean, and which cells confirm the next directional move before freezing CapEx.
No — this is a third-party market baseline compiled from channel verification and public monitoring, not a BENQUAN price list or sales offer. Treat it as a reference for quote reasonableness and timing. For a binding plan, submit your exact BOM, quantities, support years, and delivery window via the RFQ and we will assess it against live supply.
Because the source found no lane moved on 2026-08-21 or 2026-08-22 and reprinted the validated 2026-08-20 baseline for a second straight day. Continuity is deliberate coverage, not a gap. Two flat days confirm the freeze: B300 spot into its second week above CNY 14 million with futures and near-spot also flat, awaiting a confirmed direction.
Keep each track in its native unit, then convert only for reference. Asia is exclusive 8-GPU chassis per month in CNY with power and availability baked in; North America is per GPU-hour in USD with interruptible spot and on-demand tiers. After conversion, adjust for export controls, latency, data controls, and whether the contract guarantees capacity or merely offers preemptible hours.
Grade A denotes channel-verified locked data point; Grade B denotes public market monitoring including converted North America hours; unverified means no reliable source existed for that cell and the table intentionally leaves it blank. Do not interpolate unverified cells or average neighboring rows — validate them directly on a live RFQ for your configuration.
Watch B300 futures-to-spot spread width and the RTX 5090 slope. Spread narrowing confirms regime — up means squeeze, down means pullback has started — while 5090 futures (450k) to spot (500k+) shows the steepest consumer structure. Memory is the third early signal: if 128 GB DDR5-6400 moves off ~35k per DIMM, expect chassis math to follow within days.
Key Takeaway
Key Takeaway: The second flat reprint is the signal — B300 spot above CNY 14 million in week two with futures roughly 5 million below shows a frozen market awaiting direction. Screen quotes against the three sale lanes and term-specific rents, watch DDR5 first, then validate. BENQUAN GLOBAL LIMITED supplies verified GPU platforms with competitive pricing.
Action next: lock the row (SKU and memory), the lane (futures / near-spot / spot), and the lease term (months vs GPU-hours with SLA) on one equal-BOM brief before you freeze CapEx.